Australia Free Web Directory

Alenco NT in Palmerston, Northern Territory | Home improvement



Click/Tap
to load big map

Alenco NT

Locality: Palmerston, Northern Territory

Phone: +61 423 681 753



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Supply and installation of 3 x 24V PowerCUBES and 1 system upgrade in Arnhem Land. Late 2019



24.01.2022 Upgrade of existing SPS, 24V Alenco Energy PowerCube installed.

21.01.2022 Progression of the final stage of a Power Station Upgrade in Daly River region. Mid 2019

21.01.2022 Upgrade of existing solar array on a 48V SPS in Arnhem Land



21.01.2022 Another 24V PowerCube installed in Arnhem Land. Premium Products, Premium Results

21.01.2022 Final job for 2019, supply and install of solar bore pump supplying cattle station with 120,000L of water per day.

17.01.2022 120V system upgrade Arnhem Land, last big job for the year before the rain sets in.



17.01.2022 Stage 2. Power station upgrade. Installation of new Generator room, new fuel lines and new duct work.

16.01.2022 Someone has to do it. AlencoNT, 24V PowerCube, Remote

16.01.2022 Working with Water Dynamics conducting a couple of airlifts and a pump test in Arnhem Land to determine if the pumps could be upgraded to supply growing communities.

16.01.2022 Hit the ground running in 2020. Bore rehabilitation in the Kimberly region.

15.01.2022 On the road again 2019



14.01.2022 Bore Rehabilitation and water testing in Kakadu. Mid 2019

13.01.2022 Power Station repairs to damage caused by the cyclone in the 2018/2019 wet season. Arnhem Land. Late 2019

13.01.2022 Had the big girl polished up for the season ahead 2019

11.01.2022 Supply of 4 x 24kVA MiniCUBES that got shipped into Arnhem Land for a client. Complete with ducting and 1000L Fuel Storage. Early 2019

11.01.2022 Upgrade of main inverter on existing system in North East Arnhem Land. Mid 2019

09.01.2022 Stage 1 of a Power Station Upgrade in Arnhem Land early 2019.

08.01.2022 Installation of Grundfos RSI drive on new bore installation. Mid 2019

06.01.2022 Installation of new 30,000ltr storage tank, new Grundfos solar pump and new panels

05.01.2022 Supply and install of 120V PowerCUBE into northern Arnhem Land. Late 2019

04.01.2022 48V 7.5kW PowerCube Delivery to Cobourg Peninsula supplying power to 2 houses

Related searches