25.01.2022 Before and after with gyprock being done little bit more open living



24.01.2022 Saturday’s effort roof tiles removed from whole house with Family help

21.01.2022 Bedroom/En-suite frames assembled and installed

20.01.2022 We built the garage frames last week...



20.01.2022 Why not a little bit more dirty demo work before moving across to the new bedroom/en-suite. Getting rid of a useless linen cupboard that took up a chunk of bathroom

20.01.2022 Great to get the Roof on before impending weather, good to have some cover for cladding

19.01.2022 Friday’s effort, 800mm deep trench from house to new power dome... Underground power finally, yaaay (at least from the pole to the house



18.01.2022 Big thanks to Dad for coming over to help us clad the side of the house

15.01.2022 So while we’ve been hiding at home for a while... complete re-wire is done, we’ve fitted new windows and had the bottoms bricked in, French doors fitted and locks installed today, sarking on most of the house, getting ready for the Cladding I’ve been fiddling around scotching the existing patio roof into the main roof, as well as a box gutter to connect the new bedroom to the patio

14.01.2022 Slabs done, time to get some wall frames built

14.01.2022 Roof pitching well under way, bit of brick and lintel work going on underneath, as well as prep to remove the main dividing wall to living area The weather has been very kind to us

12.01.2022 Thursday the living area ceilings came down... Friday power was removed from house and transferred to underground site and garage power



11.01.2022 Garage frames and beam columns installed over the weekend bedroom windows removed and boarded up for now, another rack full of sticks to make sure we don’t get bored

11.01.2022 Looking quite different these days

09.01.2022 Floors have been stripped and ground, Bathroom ready for waterproofing and tiling and a little more weatherboard to the rear of the house under the patio Ceilings are painted Electrical nearly complete too

09.01.2022 Yesterday’s efforts, all form work in, footings dug out and final levels screeded Now for the termite treatment, plastic and mesh...

05.01.2022 Roof all pitched as well as eave/fascia installed till dark on Saturday gutters and down pipes fitted today finished by 5.30... we’ll all sleep well tonight again

05.01.2022 These piers were in the way for the new garage entry slab, so prop and drop ready for concrete

04.01.2022 Super productive day, steel beams placed on columns plumbed and welded, parallel truss finished to extend ceiling height to entry and garage, roof chippies got nearly all the joists, beams and hangers finished by the end of play

02.01.2022 Weather is great, roof is off after a full on family busy bee

01.01.2022 More outer walls removed prior to concrete all tidied and ready for a new look