Aria Homes NSW & Granny Flats in Luddenham | Construction company
Aria Homes NSW & Granny Flats
Locality: Luddenham
Phone: +61 1300 651 410
Address: PO Box 11 2745 Luddenham, NSW, Australia
Website: http://www.ariahomesnsw.com.au
Likes: 1309
Reviews
to load big map
25.01.2022 Rouse Hill Two custom design homes... Turnkey packages with driveway and fencing....... Nearing completion and ready for handover
25.01.2022 https://www.youtube.com/watch?v=YufS7wGMyyE Recent completed triplex, in the heart of Castle Hill. A huge thank you to our lovely clients, Bryan & Debbie for taking the opportunity to "Build together" with Aria Homes.
25.01.2022 Leppington Heights The first of many builds commenced today in the Leppington area... BlueScope TRUECORE Steel frame has been completed and ready for facia and gutter this Monday......
25.01.2022 Lake conjola Handover..... Congratulations Jo, you’ve done it! A lovely home for a lovely fellow........ A very special thanks goes out to all of our trades, who made the long journey down.
25.01.2022 Aria homes attended the 2020 Liverpool Local Business Awards yesterday evening. We are deeply humbled and grateful to have been awarded the 2020 Specialised Business Award! From 47 nominations, Aria achieved this amazing win! An even greater achievement was taking out the prestigious GOLD AWARD for this year’s BUSINESS OF THE YEAR 2020. With over 16,000 local businesses in the Liverpool region. We are overwhelmed at this achievement! We are thankful to all our amazing team f...or their continued hard and honest work! We’d also like to thank all our past and present clients, for your trust and support.... Special thanks to all our trade and suppliers for their long-standing support... And thank you to the local Liverpool community and the Local Business Awards! See more
25.01.2022 we love it all...... . . Credit:... Oak and Orange See more
25.01.2022 Rouse Hill Client build for two double story four bedroom homes..... Full turn key ... Concrete slabs to commence tomorrow.... Rain rain stay away so SOLID CONCRETE can pour away .........
24.01.2022 Eaglevale BlueScope TRUECORE steel frame stood.... Upper story roof is now completed..... ... Internal drainage complete..... Hebel fitted to exterior walls this coming Monday.....
23.01.2022 Looking forward to this years small business awards...... Find us featured in this weeks Liverpool Champion
23.01.2022 Belfield One bedroom studio nearing completion.... With-BGC Stratum exterior and generous raked gable awning.....
22.01.2022 Were experiencing some issues with our phone systems at present..... We are however, contactable on our mobiles Steve 0410 558 264... Jody 0410 577 675
21.01.2022 Leppington Two double story homes for clients.... Many thanks to GNL Frame and Truss for your amazing efforts in getting these frames complete once again! ... Our final week for 2020 is about to begin... Slabs, frames, roofs and handovers..... We at Aria Homes, are so grateful!
21.01.2022 Weve had some exciting updates to our website Follow the link below.......... https://ariahomesnsw.com.au/
20.01.2022 New Office..... NOW OPEN 1393 Camden Valley Wy, Leppington
20.01.2022 Lake Conjola BlueScope TRUECORE steel frame stood today, thanks to GNL Frame and Truss External drainage was completed Monday, thanks to Newline Plumbing... VRM ELECTRICAL for enabling power and to see out completion of job..... Chris Hawes for all our Pest Control services... And JWB Concrete Pty Ltd for an outstanding slab.... Stoddart Group to commence roof, facia and gutter tomorrow Also commencing is plumbing rough in from Hooked On Plumbing.... Job moving at rapid speed, thanks to our outstanding trades....
19.01.2022 Leppington Progress............
19.01.2022 Gledswood Hills Build commencement , March 2020..... With handover taking place Friday........ Another quality build, from the team at Aria Homes
19.01.2022 Box Hill Two new Aria Homes have now commenced..... Box Hill is now one of the fastest growing areas in the North West Sydney region....... Designed by Studio_Block
19.01.2022 Beyond proud! Our team, trades and suppliers. We thank you, from the bottom of our hearts!
18.01.2022 Rouse Hill These beautiful double story homes are nearing completion..... An absolute pleasure building for these wonderful clients
17.01.2022 Silverdale Internal linings commenced today, along with external rendering being completed..... Ready for lock up stage for this coming Friday
16.01.2022 Green Valley Two double story homes One double story with attached granny flat... One single story with attached granny flat All progressing as per schedule..... All using TRUECORE steel frames and quality Austral Bricks Eastern Creek.....
16.01.2022 Eagle Vale Upper story addition..... Plasterboard complete.... along with stair installation........ Waterproofing carried out and ready for tiling to commence tomorrow..... Rendering of hebel to take place this week...... Internal fix out is now in final stages.... On track for completion in the coming weeks
15.01.2022 Bardia This custom design 4 bedroom double story home has now commenced in the very popular Bardia.... With thanks to JWB Concrete Pty Ltd for an outstanding pour...... Bluescope Steel Frame to be stood in the coming weeks
15.01.2022 Castle Hill Building Together With our lovely clients and incredibly talented architect..... Our product has achieved record sales in the Hills district. ... Grossing over $100,000 per unit from past recorded sales.... Once again, we thank all our quality trades for your amazing work....
14.01.2022 Enfield BlueScope TRUECORE steel frame is now fully complete, with thanks to GNL Frame and Truss Incredibly tight access and narrow streets.... Requiring traffic control for all large deliveries.... Plumbing rough in complete, with thanks to Hooked On Plumbing Facia and gutter to be install early in the week... Followed by terracotta roof installation....
14.01.2022 Enfield Progressing as per schedule.... Brickwork has commenced...... Windows gooped..... Top roof complete..... Scaffolding to be installed mid week to allow for the upper level fixtures.....
13.01.2022 Enfield Handover was completed last week, for this beautiful 4 bedroom, 3 bathroom, double story home.... Knock down rebuild completed in approximately 24 weeks with in-ground swimming pool....... Jed and Delores it was a delight to build with you both. We thank you....
13.01.2022 Leppington display La Paloma Azul Austral Bricks
12.01.2022 Eagle vale Upper story addition..... Existing roof removed today with all services disconnected....... LVLs and Red Tongue flooring fitted tomorrow... BlueScope steel frame to be stood first thing Wednesday.....
12.01.2022 Lake Conjola Re build due to the devastation of recent fires.... Full steam ahead. With the aim of getting this wonderful client re settled in the coming weeks......... Huge week this week, with all rough ins and interior linnings taking place......
12.01.2022 Bargo Granny Flat Nearing completion..... A beautiful raked ceiling... Huge carport Large a joining alfresco area Looking forward to the finished product
12.01.2022 Eagle Vale Nearing completion...... Well into painting stages....... These lovely clients have chosen to go with a stained woodwork finish..... Bathroom fully complete.... Carpet install Tuesday..... With an anticipated completion date of Friday week......
12.01.2022 Werombi Solar panels installed...... Kitchen and ducted air conditioning installed....... All electrical cut out is complete... With thanks to VRM electrical....... Ceramic tiling commenced today.... All as per schedule and to be complete in the coming weeks......
12.01.2022 Sefton Complete and ready for handover..... A beautiful home featuring 5 bedrooms with huge alfresco entertaining area, drive through double garage with generous butlers kitchen....... Once again an absolute pleasure building for these wonderful clients......
11.01.2022 Leppington These two slabs are a mirror of our soon to be open display home..... With 5 bedrooms and 3 bathrooms and the ability to achieve many different faced options.... ... Looking forward to featuring the final product House and land packages still available....
11.01.2022 Leppington Heights Excavations and benching have commenced on all three sites... EXCITING ... Our new display home the Lacey will also feature at Leppington Heights..... A beautifully crafted home with functional layout, allows for a fifth bedroom option. A stylish free flowing design is modern livings finest. The ability to add an adjoining balcony and alfresco are one of the many options through our various faades offered.
10.01.2022 Gregory Hills The Pippa as total brick veneer Handover to take place this coming Friday....... What an absolute pleasure it was, working with this truly lovely client..... Huge congratulations on your beautiful new home...... The Aria Team
10.01.2022 Silverdale BlueScope TRUECORE steel frame is now stood.... Plumbing rough in complete....... Window gooping complete Goop Guys..... And brick work has now commenced... Austral Bricks Eastern Creek.......
09.01.2022 Its certainly our privilege to work for such wonderful people.... Chucky and Anna, we thank you for your generosity and hope you enjoy your beautiful home... The staff at Aria, certainly look forward to trying out your lovely gift....
09.01.2022 Green Valley The first two, of five, beautiful Aria Homes have commenced in this lovely new estate. It is our mission at Aria to provide quality built homes, with quality inclusions and we look forward to delivering the final product to our wonderful clients....
08.01.2022 Leppington Walk through took place today for two of these beautiful Leppington homes.... We strive for our clients to deliver only quality built homes........ Receiving such wonderful feedback is a true credit to our wonderful trades.... Thank you to all
08.01.2022 Silverdale Excavation and benching taking place today.... Making way for a 4 bedroom, single story and double garage home....... Will be delight building for these lovely first home buyers
08.01.2022 A busy week for Aria with many handovers taking place, in time for the Christmas break..... One from yesterday.... Rouse Hill What a delight is was, building with you, Charlie and Monica...
07.01.2022 Enfield Brick work is now complete and ready for cleaning this coming Saturday.... Upper level eaves to be installed in the coming days.... with external paint to commence....... Install of lower level roof next week.... All moving as per schedule
07.01.2022 https://www.youtube.com/watch?v=YufS7wGMyyE
07.01.2022 Bargo A lovely vinyl cladded Granny Flat which features a beautiful raked ceiling, large carport, ducted air and stone bench tops..... Final handover took place this morning....... An absolute delight building for these clients....
06.01.2022 Green Valley BlueScope Steel TRUECORE frame has now been stood, with thanks to GNL Frame and Truss Hebel Party Wall system installed to accommodate under roof attached granny flat......... Facia and gutter to commence tomorrow..... Also install of COLORBOND steel roof....
05.01.2022 Our new Leppington Display Home is well into production.......... One of its features being the BGC Duragroove
05.01.2022 A delight building together with you Kara A very special thank you for the delicious cupcakes.... So thoughtful and kind....... The team at Aria Homes
04.01.2022 . . Credit: abi interiors
04.01.2022 Leppington At lockup stage, with tiling now commenced...... Looking lovely
03.01.2022 Oran Park TRUECORE steel frame has commenced.... With thanks to GNL Frame and Truss... This double fame is due for completion early in the week... Plumbing rough in also to commence early next week....
03.01.2022 Rouse Hill BlueScope TRUECORE steel frames have been delivered and installation has now commenced. With thanks: GNL Frame and Truss COLORBOND steel roof install to take place this coming Friday.......... More builds to come in the Rouse Hill region
02.01.2022 Enfield In its final stages..... Painting and final stage tiling has commenced......... Stair case install complete... Dynamic roller door to be fitted in the coming days...
02.01.2022 Lake Conjola Excavation works complete with internal drainage taking place tomorrow.... The rain unfortunately slowed things up last week, so now its full steam ahead for this beautiful rebuild........ Slab being poured Monday and frame to follow in the coming week.....
02.01.2022 Lake Conjola Nearing completion.... With handover expected to take place next week....... Concrete drive way was poured today. Site leveled and cleared, ready for turfing Looking extremely forward to handing this one over!
01.01.2022 Bargo Vinyl Cladded Granny Flat..... BlueScope TRUECORE steel frame........ Facia and gutter now complete Mobile Roofing Ltd Electrical rough in complete..... Ducted air conditioning to be installed tomorrow.... Insulation to be installed Friday...... Internal linings to commence Monday.... Progress as per schedule......
01.01.2022 Aria Homes write up in this weeks Liverpool Champion.... So proud of our team, trades and suppliers...
01.01.2022 Belfield Handover took place for the lovely Christine this week.... A beautiful studio addition....... You were a delight to work with Chris! Thank you
01.01.2022 Its all happening at Leppington Heights
Related searches
- Shade Pro QLD
Businesses Local service Home improvement Construction company
+61 408 450 008
31 likes
- Olnee Constructions
Businesses Local service Home improvement Construction company Building materials
03 9551 5149
1150 likes
- Asset Construction
Businesses Local service Home improvement Construction company
+61 8 8947 6999
303 likes
- samuel.cabinetry
Businesses Local service Home improvement Construction company Kitchen & bathroom contractor
+61 417 185 157
107 likes
- Kiehn Infrastructure
Businesses Local service Home improvement Construction company
+61 401 883 118
13 likes
- Damen Stephenson Designs
Businesses Local service Home improvement Construction company Contractor Carpenter
+61 407 493 132
44 likes