Australia Free Web Directory

Avtech Engineering in Bellevue, Western Australia, Australia | Engineering service



Click/Tap
to load big map

Avtech Engineering

Locality: Bellevue, Western Australia, Australia

Phone: +61 8 9274 4122



Address: 6 Wildon St Bellevue 6056 Bellevue, WA, Australia

Website: http://avtech-eng.com/

Likes: 307

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 We are Machinists! Check out the link below to give you a basic understanding of who we are and what we do. http://youtu.be/mKeBpqQSWug



24.01.2022 Well here it is! Its out of the box, nice and shiny and ready to start working hard. We now have an increase in our machining capacity, so we will be able to get your job done sooner.

24.01.2022 The huge box, all 18Tonne of it, has arrived, and the concrete floor has been poured. Can’t wait to have it installed and going.

22.01.2022 Hi All, you may wish to have a read of this article published in the current AMT magazine. Particularly the basis of the Avtech Logo Click on this link http://amtil.com.au/uploads/AMT_JUNJULY2_2017/index.html#74



22.01.2022 Well it’s been a long time coming, but now it is installed in our new building extension and the first part being machined. Happy boss as well Mazak Integex I400 5axis mill turn CNC with a steady and 7 bar coolant pressure. Let the games begin!

22.01.2022 More boxes and lots of fresh air.

22.01.2022 You know you have done something right when your client emails you the following. This is a credit to our staff and their commitment to make the companies policies and systems work. Thanks to all of you! RE: BRONZE TENDER WIN... As discussed on the phone just now Congratulations your bid has won this Bronze tender. Well done, and a good reward for long term performance. The tender review board consisted of Operations, Manufacturing, Engineering, Quality, Commercial and Procurement management teams. The board commented: QUALITY - Avtech demonstrates excellent quality process and control in order fulfillment to us. On review of historic quality data, there has been no production rejects in 2 years an exceptional achievement. PRICE - Avtechs tendered price was satisfactory and fell within industry benchmarks Our company is committed to World Class Manufacturing and Quality objectives and Avtech has demonstrated its ability to strongly deliver to this requirement. We are currently reviewing material at present and will provide an update next week on expected order placement. Indicatively we would envisage a December/January delivery will be confirmed next week. Congratulations!



22.01.2022 Well its been a long time coming, but now it is installed in our new building extension and the first part being machined. Happy boss as well Mazak Integex I400 5axis mill turn CNC with a steady and 7 bar coolant pressure. Let the games begin!

22.01.2022 At long last the outside of the building has been completed. And what a picture. The new look of the building complemented by a fully sealed yard, brings us leaps and bounds ahead. We will be happy to miss the dust and the Avtech Lake this winter.

21.01.2022 An additional 60kw of solar panels waiting to go on the roof. Looking forward to having 95% of our power coming from the sun.

21.01.2022 Its REAL, and we are EXCITED - our up and coming arrival is being completed in the Mazak Factory and is due in ours end of February! It is HUGE!!!

20.01.2022 It’s all about using the correct tool to get the job done right. 40mm Devibe boring bar, boring 375mm deep! Not a sound to be heard.



19.01.2022 Cleared the desk today, ready for the busy year ahead. Avtech Engineering wishes all of our friends, clients and suppliers a very Merry Christmas and a Very Happy New Year! Stay Safe!

19.01.2022 This is the last component made by our employee, whom we all wish was still here. Huge talent lost forever. Remember, it is never to late to ask for help.

18.01.2022 Nothing like having some great coolant pressure to use for deep hole drilling! 7 bar makes all the difference.

17.01.2022 Getting excited, the last major stage of the building and grounds upgrade is almost done. Bitumen on Monday, yippee

17.01.2022 Looking fresh. Looking smart. Our building extension is coming together.

17.01.2022 Its all about using the correct tool to get the job done right. 40mm Devibe boring bar, boring 375mm deep! Not a sound to be heard.

16.01.2022 So we have installed the new QTC300MY and it is producing great parts. They not only look good, they were right the first time.

16.01.2022 Things are changing at Avtech. We have an Extension to the building. And what is in the big box that arrived today?

15.01.2022 Nice to have the horse power and stability to machine these billets of 425dia K110 tool steel on our new Integrex 400. @6mm depth of cut. Amazing.

13.01.2022 One of our latest, largest pieces of work. The original blank was flame-cut from 300mm Gr350 plate and weighed 350Kg. Our task to machine critical faces only on our Okuma MB56. Well done Daniel.

12.01.2022 Getting excited, the last major stage of the building and grounds upgrade is almost done. Bitumen on Monday, yippee

12.01.2022 Today we installed our latest addition to our machining capabilities. Mazak QTC300MY x 1050mm Hope to show you some parts that were made on it soon.

12.01.2022 At long last the outside of the building has been completed. And what a picture. The new look of the building complemented by a fully sealed yard, brings us leaps and bounds ahead. We will be happy to miss the dust and the Avtech Lake this winter.

12.01.2022 So at last here is our first real part being made on our EDM Wire Cutter. We used the rotating axis to position the part so that it is completed in one operation. The centre cross section is only 0.5mm thick.

11.01.2022 We have added a new Tool to our factory. It is a Portable Spark Eroder (EDM) for the removal of broken taps and studs. For taps M2 ~ M36 or an electrode capacity 2mm ~ 13mm diameter. This week we saved a part that had $750 of machining invested in it, when the tap broke. With this unit the broken tap was removed and the part was saved.

11.01.2022 This week we have added 30KW of Solar Panels to the roof. Paid for by the savings of electricity. Now I just need more roof space.

10.01.2022 The huge box, all 18Tonne of it, has arrived, and the concrete floor has been poured. Cant wait to have it installed and going.

10.01.2022 The extension is looking pretty, now to move all the machines in place.

10.01.2022 Today we passed our First full Year QAS Audit. Thanks to our team in completing all of the internal audits and making the system work. Now our clients can be well assured that we have the systems in place to look after their work to the highest standard required.

10.01.2022 Work has finally begun on the expansion of our factory. Whilst our new addition is waiting on the wharf for its new home! Not long now!

09.01.2022 The huge box, all 18Tonne of it, has arrived, and the concrete floor has been poured. Can’t wait to have it installed and going.

07.01.2022 So proud of our team, tonight we have been awarded the Best Trade Service large business for the Swan Business Awards! Yippee its been a big year!

07.01.2022 The boxes are now empty and our new piece of technology has landed on the floor at Avtech. Fanuc 600 EDM Wire Cutter x 400 high. Complete with a rotary axis for those tricky parts. Now the fun begins. Stay tuned to see the first samples being cut.

06.01.2022 Check this out. http://www.youtube.com/watch?v=iW_y25rfM-M&sns=em

06.01.2022 From billet to a finished 250mm hydraulic cylinder base. Machines on both our Integrex I400 and MB56. Great job team!

05.01.2022 Avtech was proud to have been selected as the sole event sponsor for Greenwood Tennis Clubs 2019 Club Championships! The event was excellently run, and had members, from the juniors to seniors involved. Nice to be involved with the presentations. Great to be able to give a little back to the community

05.01.2022 With 13 others (7 staff and their partners and children) from Avtech Engineering, we spent 2 nights bush camping in Badgingarra. There were 7 tents and 6 nationalities! For some it was their first experience at this type of camping in a no facilities bush camp. They handled the on/off rain with smiles on their faces. The camp fire and the abundant show of stars was the best. Many thanks to you all for making this weekend a happy and memorable one. Where are we going next year ?

05.01.2022 Work has finally begun on the expansion of our factory. Whilst our new addition is waiting on the wharf for it’s new home! Not long now!

04.01.2022 It's REAL, and we are EXCITED - our up and coming arrival is being completed in the Mazak Factory and is due in ours end of February! It is HUGE!!!

04.01.2022 We have just completed the largest part on our EDM Wire Cutter. The part is 600mm in dia and 365mm high. Cutting a key way into this gear.

04.01.2022 It’s all about using the correct tool to get the job done right. 40mm Devibe boring bar, boring 375mm deep! Not a sound to be heard.

04.01.2022 Now you have seen it all

03.01.2022 Looking fresh. Looking smart. Our building extension is coming together.

02.01.2022 And so another big box arrived at Avtech this morning. Whats inside this one?

01.01.2022 An additional 60kw of solar panels waiting to go on the roof. Looking forward to having 95% of our power coming from the sun.

Related searches