AW Maritime in Port Melbourne, Victoria | Science
AW Maritime
Locality: Port Melbourne, Victoria
Phone: +61 3 8376 6322
Address: Level 3, 63/ 574 Plummer St. 3207 Port Melbourne, VIC, Australia
Website: http://www.awmaritime.com
Likes: 23
Reviews
to load big map
25.01.2022 The City of Port Phillip engaged AW Maritime to provide a detailed design for the renourishment of Middle Park Beach, with the goal of increasing the beach area to minimise coastal erosion. Dredging contractor, Maritime Constructions Pty Ltd recently commenced the works which involves the dredging of around 37,000m of sand from a borrow site located 750m offshore and pumping it back to the beach. The project, which is funded by the Department of Environment, Land, Water and Planning (DELWP) will not only enhance the beach as a public amenity but also protect it from future weather events. https://www.awmaritime.com/middle-park-beach-renourishment/
25.01.2022 The Department of Environment, Land, Water and Planning (DELWP) engaged AW Maritime to provide detailed design, tender and documentation on the Rosebud dredging and beach renourishment works. https://www.awmaritime.com/rosebud-beach-renourishment/
25.01.2022 AW Maritime is proud to have completed the design of an upgrade to the Corinella Boat Ramp, which included the construction of two new boat ramp lanes, a new jetty and pontoon, and improved vehicle access and fish cleaning facilities. The $1.4 million upgrade was successfully completed by SMC Marine. https://www.awmaritime.com/corinella-boat-ramp/
24.01.2022 AW Maritime is pleased to welcome Catherine Bell to our team. Catherine is an experienced Chartered Civil Engineer who brings excellent Dredging, Construction, Contract Management, Business Development and Coastal Engineering skills to our growing team. https://www.awmaritime.com/catherine-bell-joins-aw-maritime/
23.01.2022 The Port Welshpool Long Jetty rehabilitation project recently reached a significant milestone with the installation of the final precast panel. Construction of the heritage winch shed is currently underway on the new deck, using the original timbers. Construction work by the contractor, SMC Marine is on track for an opening by Christmas. https://www.awmaritime.com/port-welshpool-long-jetty-rehab/
22.01.2022 Work on the Geelong Waterfront Safe Harbour project has been continuing during the health crisis, with the harbour on track to open by October. The project features a wave attenuator, a 240m on-water walkway which is one of the largest of this kind in Australia. The wave attenuator provides important safe harbour capacity to berth large vessels such as tall ships and will help to attract valuable new events to the Geelong Waterfront Safe Harbour Precinct. https://www.awmaritime.com/geelong-waterfront-safe-harbour/
22.01.2022 We are pleased to announce the promotion of Catherine Bell to the role of Operations Manager at AW Maritime. Catherine joined AW Maritime early in 2019 as a Senior Project Manager and has played a vital role in the management and delivery of key maritime projects. As Operations Manager, Catherine will be tasked with the development, implementation and review of AW Maritimes operational policies and procedures. Working with AW Maritimes directors, Catherine will also be involved in the companys strategic planning and decision-making, and continue to build strong partnerships with other organisations. https://www.awmaritime.com/catherine-bell-promoted-to-oper/
22.01.2022 The berth at 26 South Wharf is used to import bulk products such as cement and gypsum which are critical to the Victorian construction market. AW Maritime collected structural condition data during a busy shipping schedule with assistance from dive contractors who captured data below the water level. https://www.awmaritime.com/projects/26-south-wharf/
20.01.2022 AW Maritime with SMC Marine delivered a curved multi-use pedestrian and cycle path of approximately 160m built over Narrabeen Lagoon, an environmentally sensitive site in Sydney. #awmaritime #coastalengineering https://www.awmaritime.com/narrabeen-multi-use-trail/
20.01.2022 Parks Victoria has recently completed the installation of new commercial ferry pontoons in the centre of Melbourne at Southgate. AW Maritime assisted Parks Victoria by completing an options evaluation and preparing design and construct tender documentation, with the final design and construction successfully completed by Bellingham Marine. https://www.awmaritime.com/southgate-ferry-pontoons/
19.01.2022 AW Maritime has been engaged by the Great Ocean Road Coast Committee to complete a preliminary condition inspection and develop an asset management plan for Lorne Pier. Its always a pleasure to get out in the field, especially in such stunning conditions. #portengineers #coastalengineers https://www.awmaritime.com/lorne-pier-condition-inspection/
19.01.2022 AW Maritime designed and oversaw the construction of the upgrade to the Port Albert boat ramp. The upgrade consisted of reconstruction of the existing two-lane boat ramp and construction of a new two-lane boat ramp. https://www.awmaritime.com/port-albert-boat-ramp-upgrade/
19.01.2022 PW Johnson recently successfully completed the construction of a new lower landing at Middle Brighton Pier, designed by AW Maritime for Parks Victoria. The design included a modular steel frame solution and careful consideration of wave loads as the structure is heavily inundated in storm events. The landing has been well received by the public and is heavily used at this popular swimming location. https://www.awmaritime.com/middle-brighton-pier-lower-land/
18.01.2022 AW Maritime continues to provide specialist engineering services to the Port of Melbourne through a panel contract. Over the coming months we look forward to assisting the port with vulnerability analysis of the South Channel beacon piles and a comprehensive condition inspection of the 26 South Wharf facility. #portengineering https://www.awmaritime.com/south-channel-beacon-piles-anal/
18.01.2022 Queenscliff Harbour have recently completed a major milestone on the Fishermans Wharf Revitalisation Project with the main civil works now completed. #portengieenrs #coastalengineers #awmaritime https://www.awmaritime.com/fishermans-wharf-revitalisation/
18.01.2022 AW Maritime has been engaged to project manage the $15million Geelong Waterfront Safe Harbour project. The project involves the redevelopment of the Geelong Yacht Club and Victorian Sailing School into world class facilities, and the expansion of the existing marina including new wave protection structures. Piling has commenced for the new floating marina, with further piling works on the wave attenuator commencing in December. #portengineers #coastalengineers #awmaritime https://www.awmaritime.com/geelong-waterfront-safe-harbour/
17.01.2022 The Port Welshpool Long Jetty Rehabilitation Project continues to progress well with the latest development being handrails and lighting added to the structure giving an indication of what the final product will look like. https://www.awmaritime.com/port-welshpool-long-jetty-rehab/
16.01.2022 AW Maritime is delighted to see the Port Welshpool long jetty open to the public. Delivered as a design and construct contract with SMC and AW Maritime, the rehabilitation of the approximately 1km long historical jetty provides upgraded facilities to the public and a welcome boost to the local economy.
15.01.2022 Taco Tuesday and Oktoberfest! Theres nothing quite like taking a little breather during a very busy work schedule. Thanks to Catherine Bell for arranging two amazing events for the AW Maritime team. #TacoTuesday #Oktberfest #AWMaritimeteambuilding
15.01.2022 AW Maritime is pleased to announce that we have successfully extended our role on VPCMs panel contract for the provision of engineering consultancy services, including condition assessments, monitoring and design advice for the maintenance and rehabilitation of port infrastructure. After a highly competitive tender process, AW Maritime was one of a select number of companies chosen to sit on the panel and we look forward to continuing to provide VPCM with a range of engineering consulting services. #portengineers #coastalengineers https://www.awmaritime.com/extension-of-victoria-ports-cor/
14.01.2022 The Watermans Cove precinct was recently opened to the public by the NSW government as reported by The Sydney Morning Herald. The waterfront promenade featuring a pier and amphitheatre-shaped boardwalk curving around a new cove, is part of the $6 billion Barangaroo project. AW Maritime worked in collaboration with SMC Marine to complete the detailed design of the Barangaroo waterfront marine works including piling, precast concrete elements and modular aluminium deck units. Construction included the use of an innovative modular concept to deliver this high profile and architecturally significant project. https://www.awmaritime.com/barangaroo-waterfront-opens-to-/
13.01.2022 It is our pleasure to announce that the design team of Jackson Clements Burrows Architects - JCB, Site Office and AW Maritime has been awarded the contract for the detailed design of the St Kilda Pier Redevelopment. Measuring around 450m in length, the new pier has a distinctive curved design which was selected following an extensive community consultation process in 2017. https://www.awmaritime.com/st-kilda-pier-redevelopment/
12.01.2022 AW Maritime is excited to have been engaged by SMC for the detailed design of the Barangaroo waterfront marine works. The waterfront promenade includes a curving amphitheatre shape that will make it a place to host events, entertainment, art and music. Designs are already well advanced and make use of an innovative modular concept to deliver this high profile and architecturally significant project. #maritime #engineering https://www.awmaritime.com/barangaroo-waterfront-marine-wo/
12.01.2022 AW Maritime is pleased to announce that we have been awarded a contract by the Warrnambool City Council to act as lead consultants on a significant future development of the Warrnambool Harbour. #portengineering https://www.awmaritime.com/warrnambool-harbour-safer-launc/
11.01.2022 This year AW Maritime is celebrating our sixth year of operations. Were proud of the range of projects weve helped our clients deliver over the past six years, and hope you enjoy the project highlights contained in the following video. #portengineers #coastalengineers #awmaritime
08.01.2022 The South Channel Beacons guide shipping traffic in from the Rip along the Southern Channel near the Mornington Peninsula into the deep waters in the centre of Port Philip Bay. There are more than 20 beacon structures in the South Channel fixed to large steel piles and mounted with navigation aids for day and night time navigation. AW Maritime has been engaged to compile the key structural data for all beacons, assess the wind, wave and current loading on the structures, complete vulnerability analysis and assist the Port of Melbourne with its ongoing management of their key assets. https://www.awmaritime.com/projects/south-channel-beacons/
08.01.2022 Bayside City Council has recently completed the construction of erosion mitigation works in Sandringham. AW Maritime is pleased to have provided coastal engineering advice and design services to the Council, who opted for a softer geo-container solution in keeping with the nature of the site, in lieu of traditional rock revetment. https://www.awmaritime.com/sandringham-erosion-mitigation-/
08.01.2022 Were proud to announce the launch of our new website! Since our inception in 2013, AW Maritime has experienced rapid growth and weve enjoyed working with our clients on a diverse range of projects which are now better reflected through our updated website. Please visit www.awmaritime.com to see AW Maritimes comprehensive range of Port and Coastal Engineering services, a portfolio of recent projects, and current company news. We also invite you to subscribe to our email newsletter.
06.01.2022 Jan Juc, on the Victorian Surf Coast, recently set the scene for a dramatic construction feat involving the use of a helicopter to airlift a new staircase into place at a popular surf access point. Storm damage in 2017 necessitated the complete replacement of the beach access stairs, upper tier lookouts and boardwalk sections. AW Maritime was engaged by the Great Ocean Road Coast Committee (GORCC) to provide an assessment on the structural integrity of the original structure, and also consulted on options for its eventual replacement. Working alongside GORCC and CMW geotechnical engineers, AW Maritime provided detailed design and construction phase support for the project which is now nearing completion. #coastalengineering https://www.facebook.com/GORCCVICTORIA/videos/434880493727530/
05.01.2022 https://www.awmaritime.com/aw-maritime-designed-rye-boat-r/
04.01.2022 AW Maritime director, Tom Atkins recently attended the opening of Malaysias first wavescreen, located at the ferry terminal in Tawau. AW Maritime, under the lead Design & Construct Contractor KASI , completed the detailed design of the 180m long precast concrete wavescreen. The wavescreen will provide protection to the Tawau ferry terminal, improving the safety of passenger movements and reducing downtime due to weather events. #maritime #engineering https://www.awmaritime.com/opening-tawau-wavescreen-malays/
04.01.2022 AW Maritime has been engaged by TasPorts to provide specialist consultancy services to assist with planning and delivering its dredging works program. As part of this engagement we have recently worked with the TasPorts staff to manage the widening of a berth pocket to Berth 4 in Burnie Port on the North West Tasmanian coast. https://www.awmaritime.com/burnie-port-berth-4-dredging/
03.01.2022 AW Maritime is proud to have been involved in this project assisting the GORCC from concept design through to completion.
02.01.2022 AW Maritime were happy to assist Queenscliff Harbour in bringing the Fishermans Wharf Revitalisation Project to implementation by managing the procurement of all steel sheet pile elements and securing construction contracts in line with public procurement guidelines. #portengineering #coastalengineering https://www.awmaritime.com/fishermans-wharf-revitalisation/
02.01.2022 AW Maritime completed a detailed design and is currently acting as a project manager assisting with the procurement of materials and contractors. https://www.awmaritime.com/works-begin-to-upgrade-queenscl/
02.01.2022 AW Maritime recently attended the Coasts and Ports conference in Hobart where Tom Atkins delivered a presentation on the design of a partial depth wavescreen to protect the Tawau Ferry Terminal in Malaysia. #portengineering https://www.awmaritime.com/aw-maritime-presents-at-coasts-/
01.01.2022 AW Maritime supported International Waterfront Consultants on the detailed design of a construction wharf for the import of 300t modules for the construction of an LNG facility in Oman. The project was successfully completed on time and all construction modules were imported without issue. AW Maritime continues to grow our portfolio of successful international projects, with projects now completed in Taiwan, Malaysia, Oman, and UAE. https://www.awmaritime.com/oman-lng-detailed-design-of-a-c/
01.01.2022 It is our pleasure to welcome Kaveh Espandar to AW Maritime. Kaveh brings 20 years of structural and maritime engineering experience to the team including the detailed design of offshore and nearshore maritime structures, and an excellent background using various structural analysis tools from first principles to finite element analysis. https://www.awmaritime.com/aw-maritime-welcomes-aboard-kav/
01.01.2022 AW Maritime is proud to announce that weve been awarded the project management role for the Royal Yacht Club of Geelong s Waterfront Safe Harbour Precinct redevelopment project. http://www.awmaritime.com/aw-maritime-awarded-rgyc-project/
Related searches
- BDPM PTY LTD
Science technology & engineering
+61 2 9683 7071
Suite 15/103 George Street 2150 Parramatta, NSW, Australia
150 likes
- TinkerTank
Businesses Education Art Science, technology & engineering Science technology & engineering
+61 1300 670 104
1587 likes
- Vale Plastics
Commercial and industrial Science technology & engineering Machine shop Plastic fabricator
+61 2 9938 2140
18 sydenham road 2100 Brookvale, NSW, Australia
99 likes
- Sea Electric
Automotive, aircraft & boat Automotive aircraft & boat Science technology & engineering
+61 3 9706 8489
1/13 Advantage Drive, Dandenong South 3175 Dandenong South, VIC, Australia
868 likes
- MCAV
Cars Science technology & engineering
17 Alliance Lane, Monash University 3800 Melbourne, VIC, Australia
470 likes