Australia Free Web Directory

Ben Bracken Stonemason in Bowral, New South Wales | Masonry contractor



Click/Tap
to load big map

Ben Bracken Stonemason

Locality: Bowral, New South Wales

Phone: +61 402 369 002



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Kurrajong sandstone steps underway at Picton.



24.01.2022 Moving up the line!!

24.01.2022 Sandstone entrance on the rise in the valley!!

24.01.2022 Stage 2 at Burradoo nearly there, just needs a good clean.



24.01.2022 Fireplace feildstone basalt surround complete in Robertson

23.01.2022 Basalt fieldstone fireplace on the rise at Robertson.

23.01.2022 Stage 2 complete with Basalt paving in East Kangaloon



22.01.2022 Amethyst found in trakyte on Mt Gibraltar

22.01.2022 Roundabout made from Bullio Granite, all planted out with convolvulus and looking a treat.

22.01.2022 Absolutely Stunning workmanship, a friend forwarded a few photos from Bilgola.Absolutely Stunning workmanship, a friend forwarded a few photos from Bilgola.

22.01.2022 Getting very close!!

21.01.2022 Sandstone clad pillars in Burradoo.



21.01.2022 Basalt house at Bawley Point on the rise.

21.01.2022 Difficult terrain on the Gib, but it's getting there.

21.01.2022 A new project begins!!!

20.01.2022 Final project @ Burradoo, job underway.

19.01.2022 Wildes Meadow entrace complete. Bullio Granite.

19.01.2022 Another installment complete and more to come!!

19.01.2022 100 lineal meters of steps to be split from quarry blocks and installed. It's great to have experience behind the task with the help of Andrew Beville.

19.01.2022 Closing in on a finish at Range Rd, sign to be installed tomorrow.

19.01.2022 Firepit coming along.

19.01.2022 Sandstone steps, Burradoo.

17.01.2022 Entranceway at Wildes Meadow on the rise!!!!

17.01.2022 One final pass and ready for delivery.

16.01.2022 A firepit i did a few months back now getting a workout.

16.01.2022 Stone steps under way for a step project in Burradoo, watch this space!!!

16.01.2022 Finally the last caps arrived, just the gates to go on now.

15.01.2022 The finished product @ Mt Jellore by Marshall Building Company. Always a pleasure to be involved. https://www.instagram.com/p/CMAkOB3MoAF/

15.01.2022 A new project begins for @marshallbuildingcompany, watch this space!!

15.01.2022 Exciting build coming together with Marshall Building Company.

15.01.2022 Extension of an existing job from 5 years ago in Picton.

14.01.2022 Epic workmanship!!!

14.01.2022 Coming along nicely at Kangaroo Valley.

14.01.2022 Finally the firepit caps are in place, still a bit to do in the project but it deffinately getting close to a finish.

14.01.2022 Basalt job begins on Range Rd.

13.01.2022 On the rise at Burradoo.

13.01.2022 Upper Kangaroo Sandstone drywall complete.

12.01.2022 50mm Gosford sandstone brown clad for steps.

11.01.2022 Another Job complete on Mt Gibrater Mittagong.

11.01.2022 Entrance way is taking shape on Range Rd.

11.01.2022 Steps coming along quite nicely.

10.01.2022 Bullio granite has been used in a natural formation to elude the sight of plastic in Wildes Meadow.

10.01.2022 Feildstone wall made from Bullio granite, with a few bits of basalt, job description was to acheive a weathered look and make.it look like it had been there for years.

10.01.2022 Nice to revisit jobs, basalt steps in Kangaloon.

10.01.2022 Basalt stairs at Robertson, Stage 1 complete.

10.01.2022 Range Rd basalt entrance.

10.01.2022 Another stage complete at Burradoo.

09.01.2022 Steps, Gosford sandstone.

09.01.2022 Onto the landscape walls at Bawley Point.

09.01.2022 Looking pretty sharp!!

09.01.2022 Mt Gelore project underway.

09.01.2022 Great idea for a winery or wine lover, could even put the label on there.

09.01.2022 Entrance in Burradoo underway.

09.01.2022 Nice to see a finished product!! Thanks Kath and Dave for your hospitality and appreciation and a big thankyou Trent Boorman my labourer for your help with this project.

08.01.2022 Exterior finished at Bawley point with local monzonite and highlands basalt. Interior feature wall coming along.

07.01.2022 From boulders to steps, working with Wilton sandstone on the Mittagong side of My Gibrator

07.01.2022 Capping being installed, still alot to go. Happy easter.

07.01.2022 Trakyte seat on the Gib.

07.01.2022 On the last stretch with this wonderful home in Bawley Point.

06.01.2022 Robertson job coming to a finish, back capping and a few extras to go.

06.01.2022 First steps in, 10 more to be installed with four pillars and wing walls

05.01.2022 A big thankyou to Marshall Building Company for getting us involved on this amazing project. https://www.instagram.com/p/BzyuwNkhoZp/

05.01.2022 Just a bit of paving and cleaning to finish off these inviting steps at Burradoo.

05.01.2022 Sandstone Steps in Picton complete.

04.01.2022 Nearly there, just waiting on the timber mantle from The Woodage.

03.01.2022 Stage 3 nearing completion.

02.01.2022 Feildstone basalt off the property in kangaloon formed into steps, the start of a bigger project in the future.

02.01.2022 Feature wall complete at Bawley Point.

02.01.2022 Spingfields on range Rd looking amazing.

02.01.2022 French slate roof tile with property name for a job in Wildes Meadow.

01.01.2022 50mm Gosford brown sandstone clad steps in Burradoo, New South Wales

01.01.2022 Basalt retainers, Range Rd.

Related searches