Australia Free Web Directory

Bennett Building and Development | Local service



Click/Tap
to load big map

Bennett Building and Development

Phone: +61 451 127 589



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Demo day , for new extension



23.01.2022 Framing just about completed on the marino extension

22.01.2022 Kitchen reno before and after

21.01.2022 Nice subway tile in laundry with oak cabinet to follow



21.01.2022 Waterproofing and floor tiles today, using tile leveler, keeps tiles nice and flat

21.01.2022 Still open for business, screed done for new bathroom today , waterproofing and tiling early next week

20.01.2022 Great view from roof on the marino extension



20.01.2022 Framing started at Henley Beach extension

19.01.2022 Sewer up grade today before new slab for extension

18.01.2022 All ready for concret early next week

16.01.2022 New window for bedroom to bring more light in

16.01.2022 Monday morning demo on bathroom , Not the best job for a monday morning.



16.01.2022 Waterfall end to island bench with a nice wine chiller

15.01.2022 Excavation and steel done ready for concrete on the Marino extension

15.01.2022 Demo day , or maybe week

15.01.2022 Roof just about finished at marino just the finishing touches with the ridge and hip tiles

14.01.2022 Demo complete , now ready for footings

14.01.2022 New bi fold window to new kitchen ready for summer

14.01.2022 Nice American white oak shelf cabinet to finish off laundry

13.01.2022 Kitchen and laundry tiled floor

13.01.2022 This pool was looking a little worse for wear, removed existing liner , remove old rusted steel sides, and replaced with new galv steel , new concrete plinth and install of new liner all ready for summer

13.01.2022 Framing for new extension coming on. slowly getting back into work mode after christmas break

13.01.2022 Marino extension coming on nicely

12.01.2022 Something different today , nice wall paneling came up great.

09.01.2022 Small bathroom reno

09.01.2022 New pool copings ready for new liner ,

09.01.2022 Extension progressing nicely

08.01.2022 Blue board just about complete and ready for texture coat next week

08.01.2022 Bathroom coming along nicely

07.01.2022 New vinyl plank going down today #progress

06.01.2022 Nearing the end of this nice little extension , come together just as planned and looking great

05.01.2022 Small extension completed in time for Christmas

05.01.2022 Nee kitchen and laundry coming along , all new under floor plumbing and hot and cold suppl , all new electrical , bi fold window opening to pool area , now ready for stone benchtops

04.01.2022 Bathroom finished, before and after pictures, came up very nice

04.01.2022 Marino extension completed to lock up stage

03.01.2022 Old water damaged pergola wall replaced and cladd with new merbau timber

03.01.2022 And just like that the concrete fairys have been and we have a nice concrete slab the guys at sunset foundations have done a great job

03.01.2022 Kitchen reno near completion

02.01.2022 Roof going on new extension today #straightlines

01.01.2022 Demo done, under floor plumbing done. White ant treatment , plastic , steel and concrete in 2 days

Related searches