Bennett Building and Development | Local service
Bennett Building and Development
Phone: +61 451 127 589
Reviews
to load big map
25.01.2022 Demo day , for new extension
23.01.2022 Framing just about completed on the marino extension
22.01.2022 Kitchen reno before and after
21.01.2022 Nice subway tile in laundry with oak cabinet to follow
21.01.2022 Waterproofing and floor tiles today, using tile leveler, keeps tiles nice and flat
21.01.2022 Still open for business, screed done for new bathroom today , waterproofing and tiling early next week
20.01.2022 Great view from roof on the marino extension
20.01.2022 Framing started at Henley Beach extension
19.01.2022 Sewer up grade today before new slab for extension
18.01.2022 All ready for concret early next week
16.01.2022 New window for bedroom to bring more light in
16.01.2022 Monday morning demo on bathroom , Not the best job for a monday morning.
16.01.2022 Waterfall end to island bench with a nice wine chiller
15.01.2022 Excavation and steel done ready for concrete on the Marino extension
15.01.2022 Demo day , or maybe week
15.01.2022 Roof just about finished at marino just the finishing touches with the ridge and hip tiles
14.01.2022 Demo complete , now ready for footings
14.01.2022 New bi fold window to new kitchen ready for summer
14.01.2022 Nice American white oak shelf cabinet to finish off laundry
13.01.2022 Kitchen and laundry tiled floor
13.01.2022 This pool was looking a little worse for wear, removed existing liner , remove old rusted steel sides, and replaced with new galv steel , new concrete plinth and install of new liner all ready for summer
13.01.2022 Framing for new extension coming on. slowly getting back into work mode after christmas break
13.01.2022 Marino extension coming on nicely
12.01.2022 Something different today , nice wall paneling came up great.
09.01.2022 Small bathroom reno
09.01.2022 New pool copings ready for new liner ,
09.01.2022 Extension progressing nicely
08.01.2022 Blue board just about complete and ready for texture coat next week
08.01.2022 Bathroom coming along nicely
07.01.2022 New vinyl plank going down today #progress
06.01.2022 Nearing the end of this nice little extension , come together just as planned and looking great
05.01.2022 Small extension completed in time for Christmas
05.01.2022 Nee kitchen and laundry coming along , all new under floor plumbing and hot and cold suppl , all new electrical , bi fold window opening to pool area , now ready for stone benchtops
04.01.2022 Bathroom finished, before and after pictures, came up very nice
04.01.2022 Marino extension completed to lock up stage
03.01.2022 Old water damaged pergola wall replaced and cladd with new merbau timber
03.01.2022 And just like that the concrete fairys have been and we have a nice concrete slab the guys at sunset foundations have done a great job
03.01.2022 Kitchen reno near completion
02.01.2022 Roof going on new extension today #straightlines
01.01.2022 Demo done, under floor plumbing done. White ant treatment , plastic , steel and concrete in 2 days
Related searches
- Knight Adjustable Stock
Businesses Sport & recreation Engineering service Science, technology & engineering
+61 449 521 116
99 likes
- Laura Hurst Photography
Businesses Local service Photographer Photography and videography
+61 430 533 853
85 likes
- Kye Chapple Pest Control
Businesses Local service Home improvement Pest control service
+61 423 249 913
333 likes