Australia Free Web Directory

BE Projects | Construction company



Click/Tap
to load big map

BE Projects



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 The formwork at our Lindsay Street project being checked over by our on-site team. Almost ready for the first pour to complete the first-floor slab.



24.01.2022 Let's take an inside look The Lakelands project community sports centre houses some stunning new change rooms and bathroom facilities for use by the many different sporting teams that will have access to this building.

23.01.2022 Another Throwback Thursday looking back on this Black Brick and Window Combo on One of our Recent Residential Projects.

22.01.2022 We like to say we stand behind everything we build, but in the case of this earth wall at the Wetlands project it definitely stands over us. Looking forward to being able to share how this wall will look blended into the natural setting once finishing work and landscaping is complete with the lighter tones contrasting to the deeper reds and browns.



22.01.2022 Absolutely love the look of this Colour-Bond highland wall cladding, by the legends over at Stratco. The sleek modern finish is not only aesthetically pleasing but hardwearing under the Aussie sun

20.01.2022 A little bit of Friday Fun. Who needs a Cement Mixer, When you can Let Old Mate on the BobCat Mix up some Mud for use on our Earth Wall.

20.01.2022 Lynda, Troy, Adam and Julian were out on site the other week going over some details with the team as well as checking out the overall progress of the build.



19.01.2022 Up and up we go!! Progress on the Lindsay street appartments project has been going fantastic the speed of the build due to the use of the LTCM construction method has been amazing to witness. We will be sharing more images from this build in the coming week so stay tuned.

19.01.2022 Bit of a Throwback Thursday to the views & sunset at this Beautiful Completed project nestled in the Perth Hills Client: Our Hillside Folly Architect: Carrier and Postmus Architects

19.01.2022 Throwback Thursday We love looking back on some of the projects we have been working on. Take a look back at the pre-lays at the wetlands project over in Cockburn just a few months ago. Safe to say it looks a-lot different now.

19.01.2022 Finishing touches on this job as the wood panels get prepared for a final seal and paint. Loving the way the wood accent pops out on the top floor, Cant wait to see the final product.

19.01.2022 Lindsay street progress Most of the external cladding has been applied to the building and the roof is almost in its finishing stages as well. Shouldn't be too long until this building is put into its internal and external finishing works.



18.01.2022 Thowback Thursday Looking back on our Lindsay street project right after the first-floor slab has been poured and completed.

17.01.2022 You know its a Monday job when you have to jump in a hole bigger than you just to pour some concrete. Tell us some of your typical Monday job stories?

16.01.2022 The boys working today on site going over some details with the team at Bollig Design Group.

15.01.2022 Another part of the Wetlands Project is ready for hand over. Yet another part of this project is ready to pass on to our clients and we cant be more excited to see it completed.

15.01.2022 New Projects The Ron Jose' Oval Pavilion is a new project we are planned to start this year for the City of Swan, working along side the team over at Peter Hunt Architects.

14.01.2022 The boys standing tall while admiring the progress on this build. Looking forward to seeing the completed project.

13.01.2022 Work is not so bad when you get spoilt by the local bakery. Yum!!

13.01.2022 Roofing Pieces being Craned over and Installed at the Lakelands Job last Week, Good work Lads.

13.01.2022 Window Frames being Delivered on Time to Seal and Install Before the Rain Comes through this Weekend.

12.01.2022 The site team has been hard at it today. By planning out and going over each detail of a build is how we create amazing finished projects.

12.01.2022 From our family to yours. The team here at BE Projects would like to wish everyone happy holidays and our best wishes for the new year. We look forward to working on some amazing projects in the near future and can't wait to share them with everyone.

11.01.2022 Have you got that Friday Feeling Another great week has passed and that's got us feeling good. The team smashed it this week and its smiles all round.

11.01.2022 Reduce, Reuse & Recycle Take a look at these interior stairs made from reclaimed timber. Sanded smooth and coated with a protective finish while still retaining a rustic feel and aesthetic absolutely love it.

11.01.2022 The lads have been hard at work up on the skyjack today. Installing some ventilation ducts making sure everything is plumb and level.

10.01.2022 Those early morning site starts are not to bad with a hot cup of coffee and a sunrise like this

10.01.2022 THROW BACK THURSDAY Applecross Senior High School - Completed a year ago The building consisted of two large classrooms, separable operable walls, glazing on the surrounding walls that look out to the tennis courts and oval. ... Giving the school a sense of connection to the sporting side of the school. . . . #educational #educationalconstruction #educationmatters #quality #perth #construction #buildingconnections #connectingpeople #learning #greenandgrowing #wow #excellence #solution #constructionsolution #builder #architecture #luxury #trustedbuilder #industryexperts #safety #building #landscape #picoftheday #constructionlife #project #work #beprojects

10.01.2022 Does anyone remember the old Meccano sets from School? Definitely, a blast from the past when the structural steel on site looks more like something you made in year 8 over a set of roofing beams. Meccano

10.01.2022 Raw Subiaco Raw Subiaco is another interesting project we will be working on this year designed with the team at Robeson Architects, the vision is to create a bespoke dwelling that feels integrated with this historical local community.

09.01.2022 Lynda rounding up the team for an onsite meeting Another successful week across the board for us at BE Projects, Can't wait to reveal some of the exciting builds we have been working on.

08.01.2022 Our Main Man Troy on Site at one of our Larger Projects with the Site Team going Over Details and Direction of the Build

08.01.2022 Throwback Thursday Throwing back to this covered assembly area for Fremantle Primary School. The staff and students couldn't be happier with it

07.01.2022 Throwback Thursday Another throwback Thursday from us at BE. Absolutely love how this project on King St turned out. The dark satin finish on the steel accents complements the red earthy tones from the brickwork, as well as the darker patterning on the lower half of the building.

07.01.2022 The rammed earth walls taking shape at the Cockburn Wetlands project. We can't wait to see the finished project.

07.01.2022 BE Project Quotes

06.01.2022 More LTCM panels being lifted up to the third floor of the Lindsay St apartment project.

06.01.2022 Let's Meet the Team! Sean Hayes Site Supervisor ... I like seeing the process unfold in the eyes of the client, a process that is mostly unknown to them and seeing amazement as the build rises out of the ground.

05.01.2022 Throwback Thursday! Looking back on the contrast of the red and black in this residential extension in East Fremantle

04.01.2022 Sometimes you just need to sweeten the deal. Site supervisor Jason knows the key to a happy team is to keep them well-fed and full of coffee. Especially during those early morning site meetings.

04.01.2022 Just look at that view!! The team has been hard at work at our Lindsay Street Apartments project. This is an exciting project for BE Projects, as we are using a new construction method - Light Weight Steel Frame or Load Transfer Construction Method (LTCM). This method combines the benefits of a concrete frame building with the construction speed and design flexibility of light gauge steel framing.

04.01.2022 Taking a small look back on the Lakelands project it's amazing to see just how far its come in what seems like such a short amount of time.

04.01.2022 The rammed earth wall at our Cockburn Wetlands Project has really started to stand out. The layered earth tones will complement the natural landscape once the build is complete. Good Work Team

03.01.2022 BE Project Testimonial

01.01.2022 Checking out the detail on one of our residential projects. Our bricklayers have been hard at work maintaining such a high standard, Great job Guys! Architect: @robeson_architects

01.01.2022 Wetlands Project Update Yet another part of our Wetlands project is ready for handover. Can't wait to see this nursery full of new seedling ready for transplantation.

01.01.2022 Acoustic paneling has gone up over at the Lakelands project. the open ceiling design allows for amazing ventilation while the suspended panels absorb sounds reducing echos and reverberations

Related searches