Bespoke Pools | Home improvement
Bespoke Pools
Phone: +61 411 813 534
Reviews
to load big map
24.01.2022 Heidelberg Project: Pool being rendered.
24.01.2022 Before and after pictures.
23.01.2022 Heidelberg Project stage 2. The pool position has been marked out and squared. Next comes the excavation.
23.01.2022 If you cant afford a spa, then how about getting this guy to draw you one instead.
22.01.2022 Tudor Village indoor pool being sprayed with concrete.
20.01.2022 Heidelberg project stage 1. The perfect location for a new pool. This garden in Heidelberg will undergo a complete makeover. Stay tuned for updates.
20.01.2022 Construction photos showing the progress of the Heidelberg project.
20.01.2022 Getting deeper.
19.01.2022 Before and after photos
18.01.2022 Heidelberg Project: Landscapers building a low retaining wall on the pool shell.
16.01.2022 Before and after images of a recently completed project in Hawthorn which sits perfectly within the architectural design of the house. It features large custom cut granite flagstones that appear to float on water.
14.01.2022 And then we struck rock!!!!
12.01.2022 Heidelberg Project: Waterline tiles.
09.01.2022 Heidelberg Project. Geoff does a great job. His pipework to the filter system is well thought out and designed to deliver maximum efficiency .
08.01.2022 Construction photos detailing the Cairnlea project
08.01.2022 This block falls to the east. However with the addition of a low retaining wall the site is easily modified to accommodate the new pool.
08.01.2022 Hammering away at this damn rock. The process was long and loud.
06.01.2022 Heidelberg Project stage 3. Excavation begins. 1:The 5 tonne excavator removes the soil. 2: A bobcat transfers the soil to a truck. 3: The truck carts the soil to a landfill site.
03.01.2022 Before and after images of the Tudor Village in-door pool.
02.01.2022 Mitcham Project: This pool has been excavated and steel fixing completed. The steel adds structural strength to the pool. Having excellent steel fixers ensure a first class job is always achieved.
01.01.2022 Heidelberg Project: Excavation is complete. In floor cleaning pipes have been installed and this pool is now ready for steel fixing.
01.01.2022 This is the before.
01.01.2022 Heidelberg Project: The concreters spray 32mpa concrete to form the pools structure. With this method, swimming pools are custom made to form any shape, size and configuration . Once the steel is fully encased in concrete it will no longer rust due to the lack of air.
Related searches
- Dimboola Cafe
Restaurant Businesses Food & drink Fish and chips restaurant
+61 3 5389 1861
524 likes
- Dirson Driving School
Businesses Education Specialist school Driving school
+61 424 066 947
212 likes