Australia Free Web Directory

Borcky Construction | Company



Click/Tap
to load big map

Borcky Construction

Phone: +61 447 301 004



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Got the roof on our Kulikup job last week, building wrap, windows, and first fix inside work for the majority of this week. Cladding will start to go on tomorrow



25.01.2022 Willeton extension coming along. Opening this house up to the beautiful out door area. Client is creating more space for growing kids. With the brick work finishing up tomorrow, we will be straight into pitching the roof. Progress

24.01.2022 Morning! Roof framing in progress, with scaffold going up today this home is starting to really take shape. Lets see how far we get today before the storm comes in.

24.01.2022 Here is some more pics of our Bridgetown job with the roof on, this is the job I posted before Christmas thats 5m out of the ground on high side.



24.01.2022 Ground floor down in Bicton! 3 more floors to go,

24.01.2022 Second concrete line pump complete, now onto building this sub floor!

23.01.2022 Mount Barker all locked up, was a good effort from the guys working through the storm.



21.01.2022 North Dandalup job fit out complete and locked up

21.01.2022 Floor down on Chittering job

21.01.2022 Como job; Slab cured, bricks loaded, now we are full steam ahead to have these clients in for Christmas.

20.01.2022 Swanview starting to take some shape now, Roof sheets going on this week.

19.01.2022 70 poles poured today for this amazing spot in Kulikup sitting up from the black wood river



18.01.2022 Solid week in North Dandalup, roof on, wrapped, joinery in, and made a start on stairs handrails and cladding.

18.01.2022 Exciting times ahead, transformation to a modern hamptons home starts this week!

18.01.2022 Roof framing nearly complete on the huge Queenslander style home in Mount Barker, Lid going on this week

17.01.2022 A couple progress shots of Burns Beach job, roof framing complete this week and will aim to get roof on next week

17.01.2022 Beaut day to start the week after a long weekend, finish purlins today and start roof sheets tomorrow. Yeow

17.01.2022 And onto the next floor!

16.01.2022 Here are a few photos from our recent renovation transformation in Swanbourne, Perth. This home was originally built in 1957 and has had a major facelift transforming into a beautiful Hampton's style home

16.01.2022 Sneak peak of our just recently completed Hamptons style renovation in Swanbourne. What a great transformation! More photos to come..

16.01.2022 Bridgetown poles poured today, this house is going to be 5m out of the ground on the high side with great views down the valley.

15.01.2022 Roof on at Brigadoon job

15.01.2022 Dunsborough, martingale drive, job at second fix stage. Have enjoyed working close to home on this one. A couple of progress shots there too

14.01.2022 After a week of rock breaking its finally line pump day, footing pads in today, brace poles up Monday and pump again Tuesday

14.01.2022 ~ Black Wall Reach, Perth WA ~ ~ JB ~ ~ Boys hard at work ~... #borckyconstruction #borckyboys #timberframehomes #timberframeconstruction #perthsmallbuilders #perthconstruction #perthdesign #beachfronthomesperth #luxuryhomes #life #lifestyle #quality #boutique

14.01.2022 Our Peppermint Grove job is underway now, with walls being demolished and footings in for new walls to go up. Extending ground floor and first floor for two new bathrooms and a laundry.

13.01.2022 Before & after photos of a project completed last year in Falcon. We enclosed the existing patio area to create a new living space. Looking great! Thanks Jess & Izak

12.01.2022 Gotta love these 40 plus degree days up in the hills...... Lower Chittering Looking forward to getting back home to the beach this weekend,... Enjoy The weekend peeps

12.01.2022 Borcky boys in action, doing what they do best - building dream homes.

12.01.2022 Plumb and straighten walls, build garage walls and frame mezzanine floor today. Lay mezzanine flooring tomorrow and start support walls and beams for the first floor. The footprint of this home gets bigger each floor it goes up, eventually the top floor will be landing on the top of the limestone cliffs around it.

12.01.2022 Main floor framed, inso and flooring today

11.01.2022 New site in Quinns rocks set out and base pads poured this week

11.01.2022 Boyup-Brook job at roof framing stage, will get the lid on this cottage next week , couple progress shots there

10.01.2022 ~ Black Wall Reach, Perth WA ~ ~ Slowly taking shape and sitting very pretty ~ #borckyconstruction #borckyboys #timberframehomes #timberframeconstruction #perthsmallbuilders #perthconstruction #perthdesign #beachfronthomesperth #luxuryhomes #life #lifestyle #quality #boutique

10.01.2022 Hi everyone Borcky is looking for a qualified carpenter to join our team in Perth. See the link below for details. ... Looking forward to hearing from you! https://www.gumtree.com.au//qualified-carpenter/1275275954

09.01.2022 Burns beach job at second fix stage, starting to see this big home unfold with scaffold slowing coming down.

09.01.2022 Our Manning extension and renovation, brick work completed and ready for roof frame. Recycled brick column looking stunning.

09.01.2022 Couple progress shots of Quinns rocks job.

08.01.2022 Here we go again, Brigadoon

08.01.2022 Bicton job; Ground floor walls built today, 3.3m ceilings in each floor. 3 floors in total Will stand GF walls tomorrow and get first floor framing craned on top

07.01.2022 Willeton job Roof tiles on, walls to be rendered next

07.01.2022 This weeks Project update. Peppermint Grove; For this job we have created a new Laundry, Bathroom and an Ensuite. We have completely blocked off the end of this home and had all access through new windows and doors of extension. This has allowed clients to live in their home with no interruptions. - tiling complete... - External render going on, steel structure awning with copper roof to go on next week. Chittering; Roof sheeted, house wrapped and windows in this week. Cladding to start next week Brigadoon; Eve linings this week, Second fix to start next week Wilyabrup; Decking completed this week, subfloor framed and flooring laid, decking framed and laid. both completed in last 2 weeks

06.01.2022 Want great views? Build on the steepest hill you can find.... set out day on this beauty. Split level floors with the deck/balcony 7m out of the ground.

05.01.2022 Burns Beach job, Ground floor frames built, stood, plumbed and straightened. A few brackets and ties to go on FIrst floor subfloor framing then will get floor sheets down today. This house also has a loft above - will get great views of the ocean!

04.01.2022 Lower Chittering job at roof stage,

04.01.2022 Mount Helena job, Main house and granny flat. Photo is a week old, actually have roofs on both now just need to take a picture.

03.01.2022 We have slab down on our Willeton job, this is a standard double brick and tile constructed home that we are doing an extension on.

03.01.2022 Carport addition to a house we built a few years back. Has internal box gutter, with water tank for catching rain water for gardens Have done a few extra add ons for these awesome clients

02.01.2022 Site set out at Blackwall Reach Bicton today, not too much more site works then retaining. Looking forward to getting stuck into this build (around September)

Related searches