25.01.2022 Nature strip today completed today with you yang granite topping
25.01.2022 Part 1 complete, pathway with Tucson 20mm toppings , once the water mains are moved over 500mm and new tap installed by scott at Essential Plumbing and gas fitting, then we can install the turf
23.01.2022 Turf install today, even though it poured with rain most of the day, we were out making the magic happen, great finished product . Sir Walter buffalo turf
22.01.2022 Multi level Retaining wall kinda day
18.01.2022 Bowie and Surfcoast decks and pergolas
18.01.2022 Bit of turf prep this week
18.01.2022 Sometimes you have to build a dirt ramp to get into places
17.01.2022 Before and after pics off a garden clearance today, excavator and posi tracked loader getting it done quick
17.01.2022 Slab Backfill today for Kaziz developments in Melbourne. Creating that fall with fill and crushed rock ready for the trades to start top job
17.01.2022 Before and after pics, garden fill and level
16.01.2022 Very tight access work this weekend under a house in jan Juc
16.01.2022 Another new addition to the Bowie fleet The Guys down at Komatsu we’re amazing to deal with, customer service
15.01.2022 Today’s job . Pre site clean and scrape ready for site cut
13.01.2022 Today we were delivering and placing some big rocks with our posi track loader, another happy customer
12.01.2022 Both machines working together today
12.01.2022 Struggling for access?? We can fit one our trucks between your 2.4m fence posts, saves you time effort and money with the wheel barrow, then our skid steer loader can spread and level your required toppings
12.01.2022 New garden bed dig out today
12.01.2022 Rear garden finished today , mowing strip and Corten steel edge for the garden beds
11.01.2022 All ready for Sir Walter Buffalo
11.01.2022 Sometimes we have to hire in the super small machinery to fit down a side gate to get the job done. Always up for a challenge
10.01.2022 Concrete retaining wall kind of day, came up a treat
09.01.2022 Tight access job done today
06.01.2022 Scrape and level then turf mix ready for sir Walter buffalo
06.01.2022 Bit of onsite welding for corten steel edging, doing this provides a stronger and long lasting finish on the joins, also welded stakes to keep the height
05.01.2022 Pre build scrape and level
05.01.2022 Pool dig out and preparation for synthetic turf
03.01.2022 Another retaining wall done
02.01.2022 This pool area work came up a treat, synthetic turf, fire pit and decking area
02.01.2022 Thick crushed rock base to keep the weeds out the a 20mm charcoal colour screenings
01.01.2022 Before and after site clean up
01.01.2022 Turf install today
01.01.2022 Another new addition to the fleet