22.01.2022 Another basement leak due to no waterproofing on the outside of the wall during construction. This was a live leak due to ground water. We managed to plug the leak long enough to apply our membrane system. The area is now able to be rented out, no more mouldy smell! @ Gold Coast, Queensland.



18.01.2022 Our drainage and retaining wall system stopped water ingress into the building.

16.01.2022 The ground level can be too high around steel columns and cause rust due to moisture. We prop, remove and replace columns as well as proper excavation for longevity.

15.01.2022 Sliding embankment repair by Buildpro Qld. The limited access meant 90% materials were installed by hand.



15.01.2022 The home has been leaking water through the brickwork, we dug down to find no waterproofing or drainage system! Cleaned up the wall, waterproofed, protected the membrane then installed drainage. All four sides needed to be done. No more leaks or mouldy smell. Since downstairs is now liveable, we installed kitchen and bathroom to make seperate dwelling. Happy client = happy builders !

13.01.2022 Replacing the rusted beam could have been costly, we were able to repair on site. Also the balcony had no membrane installed, so we removed the tiles and installed our waterproof system.

10.01.2022 That sinking feeling? The shed slab was sinking because of faulty compaction and erosion, the owners rang Buildpro Qld for solutions. We were able to inject a product under the slab which expands when in contact with water. The product consolidated the soil, filled the voids and provided lift to stabilise the slab. The lawn mower no longer rolls out of the shed!!



07.01.2022 Does your concrete slab need grinding before new coverings are laid? We not only remove existing membranes, tile glue, vinyl, bumps and lumps are also taken care of !

07.01.2022 Before, during and after construction. Conveyor belts were used to backfill 5 cubic meters of drainage gravel. Access was an issue.

06.01.2022 Water pooling along external wall thanks to poor concrete levels, we installed an ultra drain to solve the Issue!

06.01.2022 Crack injection into a bund wall at a chemical site. Epoxy resin was used to seal cracks and protect steel from concrete cancer. We also waterproofed the inside with bitumen paint. Just like new!

03.01.2022 Recent jobs around the Gold Coast.



01.01.2022 Concrete cancer strikes again! Being so close to the beach, any cracks need to be addressed ASAP, if left too long this is what can happen . @ Currumbin, Queensland, Australia