Australia Free Web Directory

Brendan Trotter building in Faulconbridge, New South Wales | Home window service



Click/Tap
to load big map

Brendan Trotter building

Locality: Faulconbridge, New South Wales

Phone: +61 404 866 976



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 The team at BTB wishes everyone the best in these tough times. All hoping we return to some normality soon. Some pics of some past jobs we have clmpleted.



24.01.2022 BTB back for a busy 2020. First job of the year is a large carport with sandstone retaining wall and merbau cut roof all exposed rafters and blended into the veranda roof Watch this space for more progress shots This will look amazing

23.01.2022 Perfect day to finish off some roof framing #lovetherain

23.01.2022 BTBs new quoting truck had her first quote today. Went well, didnt miss a beat and got me there on time. All though i did leave 10min early Sign writing coming soon



22.01.2022 Top level ready for concrete at our Linden job. And just a little bit of bracing for support. Great job from Tony Anamoulis, Josh Horner and Team. Hope everyone is staying sane in these crazy times... #designfocusedconcreting #hansonconcrete #stayclean #takecare

22.01.2022 Big fly friday! One of the biggest flys i have see for awhile here in hazelbrook Pic doesnt do it justice

21.01.2022 Another cracker of a day #crackerofaday



20.01.2022 A little bit of digging at our winmalee job. And some drainage #BTB #eps #hellohire

20.01.2022 A couple of almost dry days and roof framing complete, although working in a mud pit, Lola the pig loves. And somebody got there ute bogged Now starting gutters and roofing this 32 degree pitch roof. #stramitroofing #sunvalley

20.01.2022 Some of our jobs making good headway here at BTB. Winmalee job frames up and starting roof framing Springwood job we have taken a wall and installing steel beam and posts Linden job brickwork just about complete and eaves getting installed. Stay posted for some exciting new pics... #beautifullwintersun #truconconstruction #brickworks #loveeaves See more

17.01.2022 Just started a new job in Woodford. So this will be the view from office window for the next week. Replacing fascia, gutter and tired old cliplock roofing with new corry Stay tuned for more pics. #socialdistancing #bluemountainsaustralia #jayjays #stramitroofing

17.01.2022 We have started fascia and gutter on the new build at Linden. Starting to feel that mountains winter feel in the morning but beautiful sunny days are awesome. Loving the scaffold system allows us to install fascia and gutters with ease and sheet roof #bluemountainswinter #fasciagutters #buildsafe



16.01.2022 Got to love October in the mountains One day 30 degrees the next 13 degrees #october #bluemountains #merbau

16.01.2022 Tiling has started at our Linden job. With plasterboard finished, cornice done and skirting/archtraives started, we are nearly ready for paint WooHoo #tileandbathco #bigtiles #fixout

16.01.2022 One of my favourite pics Out doing a steel pickup with boss She loves a photo #kelpie #workingdog

16.01.2022 BTBs new Winmalee job. Excavation has started. This is an addition which includes a new kitchen, dining/living and 2 bedrooms plus main bathroom renovation. Stay tuned for more pics. #hellohire... #hellohireequipmentrental See more

13.01.2022 We have some framing and floor joist completed at our winmalee job. And a brand moving trolley has joined the BTB team #framing

13.01.2022 Getting ready for a concrete pour in Linden. Lower level slab being poured tomorrow

12.01.2022 Breaking in from old to new and plasterboard going up always exiting

11.01.2022 Stage 2 of Winmalee job starting to look like something with concrete complete,structural steel up and frames started Stay tuned this is going to be high #cutframes #cutroofs #jameshardiescyonstria #westalwindows

11.01.2022 Are your deck and stairs looking a little tired and in need of a rebuild. Or would you just like something a little different. Contact BTB at [email protected] for quotes on all your building work.

10.01.2022 Our Winmalee job has started. This is a garage with a loft and an addition to the home Starting off with garage and driveway once this is complete we will be moving onto the addition

10.01.2022 Re-roofing made easy with L T Metal roofing and Guttering Awesome job and great guys

10.01.2022 Hazelbrook job near completion Water tanks, wall tiling in laundry, skirting and architraives to go And addition to the work horse hilux new nidge bar and builders rack perfect for carrying the long lengths of steel and timber

10.01.2022 An addition we completed on this 100 year old home earlier in the year #brendantrotterbuilding #buildinginthebluemountains

09.01.2022 Some pics of our recent Sun Valley job. Great carport/entertaining area blended into the existing veranda roof. #cutroofs #sunvalley #merbaucarport

09.01.2022 A few pics of what BTB have been up to lately An addition to a cute little mountains cottage in Hazelbrook Small deck and stairs in Katoomba using steel and James Hardie "hardie deck" And a new pitched roof Carport in faulconbridge with raked ceilings and velux skylights #hardiedeck #veluxskylights #rakedceiling

09.01.2022 The team at BTB wishes everyone a great Christmas and New years, hoping everyone stays safe. A few before after pics of what we have been up to over the last 6 months. Watch this space for a busy 2020 Take care everyone

08.01.2022 Some progress shots of Winmalee job and getting ready for stage 2 of this one. Stay tuned for more!

06.01.2022 Finishing off the water tank slab in Hazelbrook This will support 2x 3600L bluescope slimline water tanks which will be plenty of water for the beautiful gardens

06.01.2022 Our Winmalee job coming along. Floor framing complete with bricked up subfloor and red alert bearers and joists.

05.01.2022 BTB has been very busy over the last few months so here are few jobs we have been working on lately A renovation in Springwood which included install of new stacker doors to kitchen and lounge area, new skylights, new front door and screen, new kitchen floor framing and some cladding. Finished off a carport in faulconbridge and started a re-roof in woodford More pics to come. #buildinginthemountains

04.01.2022 Nice at night Our Winmalee project looks sensational at night with up down lights #Brendantrotterbuilding #wolftex #colorbondmatt ... #truconconstruction See more

04.01.2022 The BTB team at Linden today, brick work completed, electrical & plumbing next, & then gyprock.Timber flooring has arrived so it has time to 'season' before it is laid, all going to plan. #newshirtalert

04.01.2022 A little bit of progress for the Hazelbrook job Eaves in and starting cladding tomorrow

04.01.2022 Sun Valley job taking shape. Steel up and cutting in roof and a little help from the pig #merbau #cutroofs

03.01.2022 Cladding and windows complete, plumbing and electrical roughed in, ready for plasterboard. Getting ready to lockup

03.01.2022 Concrete poured at our Linden job. Now getting ready for the second slab #splitlevelhouse #linden

03.01.2022 Off to the park with these two on this perfect Autumn morning before office work, hope your enjoying the beautiful weather

02.01.2022 My little paver apprentice finishing off side entry to the hazelbrook addition

02.01.2022 Our Winmalee job moving along with framing almost complete, scaff up and roofing started. More of the matt monument colour #colorbondmatt #scyonstria #buildinginthemountains

01.01.2022 A couple of Hardie decks we have been working on lately. Great finish once painted and can also be stained/oiled to be made to look like timber #hardiedeck

01.01.2022 Another job completed up here in Coffs Harbour. A jumbuck bbq from bunnings Great for that party, entertaining on the alfresco #jumbuckbbq #bunningscoffsharbour

01.01.2022 What a cracker of a day Best time of year in the mountains Reroof and bathroom/laundry reno at Blaxland.

Related searches