25.01.2022 New site. Bexley North. Works including, master suite extension and renovation. Remediation of building facade.



24.01.2022 Hinchinbrook Project-Roof removal Complete, ready for floor framing.

22.01.2022 Spray Foam Insulation !!!

20.01.2022 Bankstown project update- flooring complete, timber framing walls complete ready for roof framing.



19.01.2022 Current job at Bankstown-complete renovation and extension to existing dwelling.

18.01.2022 New Project; Bass Hill, NSW Second storey addition including;... internal alterations to existing ground floor & addition of a double garage. Follow our page to see progress updates of this project over the next few months.

17.01.2022 recently completed major insurance repair project in Toongabbie, NSW: house fire cause by indoor wood heater. Works involved; removal and replacement of solar system, replacement of wall and roof trusses, new flute system for wood heater and internal plastering and painting.



17.01.2022 Hinchinbrook project-second storey addition. Stairwell concrete slab pour

15.01.2022 Insurance repair claim-Blair Athol NSW. Due to a burst water pipe in the bathroom vanity, this property required remediation works to the bathroom, 2 bedrooms and lounge room flooring.

13.01.2022 Hinchinbrook Project complete.

13.01.2022 Falls from heights are a major cause of fatality and serious injury in NSW workplaces. No matter what you do, safety starts with you.

10.01.2022 Hinchinbrook second storey addition- project update. External close up complete!... Colour scheme. Cladding-Brownstone (mitten vinyl) Fascia and gutter- evening haze (Colorbond) Roof- woodland Grey (colorbond)



10.01.2022 Bass Hill Project update Roof frame has been removed and structural steel beams have been installed.

10.01.2022 Hinchinbrook project- Solar panel removal, to make way for second storey addition.

10.01.2022 Our Bass Hill second storey addition has finally reached the lock up stage. Keep an eye out for some of the interior finishes in the coming weeks.

08.01.2022 Hinchinbrook project-Update: Floor joists installed, plumbing drainage complete and flooring installed.

07.01.2022 Walk through video of our luxury master bedroom and en-suite upgrade at our bexley north project.

07.01.2022 Bexley north project complete. Master suite extension and renovation as well as remedial works to existing ground floor dwelling. Features include. ... Decina Elisi freestanding spa bath Somfy remote controlled electric blinds DIB C450R bidet LED walk in wardrobe

06.01.2022 New project at Heckenberg. We will be adding a second storey to this 1970s brick veneer home. The new level will include 2 bedrooms 1 bathroom and a spacious living area. ... We will be updating progress photos over the next few months.

06.01.2022 Hinchinbrook project update-framing complete, ready for roofing and cladding.

06.01.2022 Some before and after photos of our bexley north project

05.01.2022 Bankstown project-progress. Concrete stairs and balcony complete. Timber floor framing complete. Termite proof Red alert LVL 25 year guarantee.

03.01.2022 Bass Hill second storey addition Project update; Timber framing is now complete.

03.01.2022 Bankstown project update- roof and walls complete. Ready for close up stage.