Australia Free Web Directory

Buller Builds in Essendon, Victoria, Australia | Construction company



Click/Tap
to load big map

Buller Builds

Locality: Essendon, Victoria, Australia

Phone: +61 407 660 137



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Progress shots of a kitchen and bathroom renovation in Ascot Vale



24.01.2022 Curves! Tricky little bathroom job in Brighton under construction.

24.01.2022 Just adding the finishing touches to Fitzroy North.

22.01.2022 Voila! Another one down.



21.01.2022 Sharp! These windows came up better than hoped.

20.01.2022 In slab heating installed and ready to pour concrete at Ascot Vale

20.01.2022 Country extension and renovation



17.01.2022 No better feeling than being out of the ground!

17.01.2022 Completion of this tricky build in Fitzroy North.

16.01.2022 Progress at Travancore

15.01.2022 Some great photos of a completed renovation from earlier this year.

15.01.2022 Really excited to see this one take shape.



13.01.2022 Flowerdale Before & After

13.01.2022 Completion of another project in Ascot Vale, this one was a real pleasure to be a part of, from the design to the clients.

12.01.2022 Everyone loves some before and after pics!

11.01.2022 Frames in and glass on order. Can't wait to see how these come up.

10.01.2022 Front of the cottage had sunk 320mm as compared to the back. Just because it's old doesn't mean it's worth remembering..

09.01.2022 Very excited to be able to create and install this reclaimed shelf from a beam taken down during the demolition stage of the project.

09.01.2022 Another tricky inner city extension

09.01.2022 Always nice being on the home straight of another reno.

08.01.2022 Hard at work at our Ascot Vale project. Narrow sites, no problem.

07.01.2022 Getting out of the ground

05.01.2022 And as viewed internally

05.01.2022 Photos won't do it justice, but these custom Blackbutt timber reveals are going to come up amazing.

04.01.2022 All the toys at our Brunswick project as we clear site ready for the new extension.

04.01.2022 Very happy with the temperature consistency on these external wall niches.

02.01.2022 And we're up! (Mostly)

01.01.2022 Installation process of hydronic heating under a topping slab. All finished and ready for mechanical grinding.

01.01.2022 Here's what I think is a perfect example of how much basic double glazing and minimum insulation can potentially add to your home's comfort. This is a conditioned air space of 21 degrees external air of approx 13 degrees. Photos are taken in adjacent rooms. Top photo is an aluminium single glazed 4mm glass window and completely uninsulated brick veneer walls. Bottom photo is a timber double glazed 4mm glass- 12mm space - 4mm glass, sisalation wrap and R2 fibreglass insulation.

01.01.2022 A lucky family will be able to stay home in this one in a few weeks.

01.01.2022 Just look how far this old cottage has come! Some finishing touches and handover.

Related searches