Bullsbrook Metal Works | Commercial and industrial
Bullsbrook Metal Works
Phone: +61 429 171 455
Reviews
to load big map
25.01.2022 Storage box made for a caravan powdercoated to match the rest of the setup.
25.01.2022 Some cool options we have fabricated for a local customer on camper. Now its all tricked out ready for some adventures.
23.01.2022 Mine site required a timecapsule / seat to be filled with many memories. It was displayed front and centre at their 30th anniversary open day earlier this year. So this is what we come up with.
23.01.2022 Fire supression deluge system fabricated and set up to protect transformers on a mine site.
22.01.2022 Custom built alluminium access platform
19.01.2022 The team is busy in the workshop this week. Feel like you have what it takes to join the team feel free to contact us. Fabricating... Welding Safety handrails Site installation Stainless, aluminium, mild steel See more
15.01.2022 Interesting project to make this piece of abstract feature art. Offset and out of square twisted to requirements.
10.01.2022 Beam supports for a structural repair.
10.01.2022 Some recent modifications done to a camper to suit the needs of the owner.
10.01.2022 Custom handrail to enclose an aircon. Fall protection.
09.01.2022 Earlier this year we did a roof replacement on the concentrator building of a mine site. Removal and replacement of all the purlins and screws, along with new poly-carb sheeting to let in some more lighting. We also installed ridge venting to overcome a condensation issue they were having for many years which resulted inthe rusted purlins and some of the structure.
09.01.2022 Fabricated and installed these 2 alluminium access platforms on a dredge on a mine site.
08.01.2022 Another great alluminium project. Access platform for a mine site on a dredge. Fabricate and install.
07.01.2022 Larger projects are no problem for us with great time management but also safety as always our highest priority. This is the top view of the poly-carb sheeting replacement.
06.01.2022 The highest point of the mine site structure is called the crows nest. We fabricated and installed this new aerial tower. We love a challenge.
05.01.2022 Positive air handling unit, workshop fabricated and installed on a mine site, for forced air into a substation.
02.01.2022 On site repairs for structural integrity.
01.01.2022 7month build on the main supply substation on the minesite. Working along side electricians, scaffolders, airconditioning team, and personell from maintanence etc. One of our major builds from ground up.
01.01.2022 Ute toolbox including powdercoating. Ask for a quote on all your powdercoating needs.
Related searches
- Williams
Shopping & retail Businesses Retail company Apparel & clothing Shoe shop Clothing shop
+61 1800 101 285
14241 likes
- Darren Campbell Wall & Floor Tiling
Businesses Local service Home improvement Carpet & flooring shop
+61 407 422 043
151 likes
- Day Dreaming Australia Private Custom Tour
Businesses Tour agent Travel and transport Travel company Tour guide
+61 450 809 072
23 likes
- Willoughby Judo Club
Businesses Sport & recreation Amateur sports team Sports team
+61 404 815 861
187 likes