Byrne Concrete Services in Medina, Western Australia, Australia | Construction company
Byrne Concrete Services
Locality: Medina, Western Australia, Australia
Address: 7 Gentle Road 6167 Medina, WA, Australia
Website:
Likes: 65
Reviews
to load big map
23.01.2022 Cassia Glade Location: Kwinana WA Our Client: LD Total Duration: 3 Week The works of this project included... Concrete Seating and Tables 24 Seats 8 Tables See more
22.01.2022 Sienna Wood Shipwreck Location: Armadale Our Client: LD TOTAL Duration: 4 Months The works of this project included;... Concrete curve walls. Formwork. Reinforcement. Design of a bow for a boat. Curve radius planter/ seats. See more
22.01.2022 Ellenbrook Entry Wall Location: Ellenbrook Our Client: LD Total Duration: 5 Week The works of this project included... Concrete Entry Wall See more
22.01.2022 Gorgon Pipe Rack Ballast Blocks Location: Medina/ Casting Yard, WA Our Client:Omega Construction Duration: 2 Months The works of this project included;... Construct 250 pipe supports. Strict environmental policies. Worked in strict tolerances. Pre cast Yard used to manufacture. Concrete Placement. Pre fab molds. See more
16.01.2022 Sienna Wood Location: Hilbert WA Our Client: LD Total Duration: 5 Week The works of this project included... Concrete Humpty Dumpty Wall See more
14.01.2022 CSBP/ Ammonium Nitrate Plant Expansion Location: Kwinana, WA Our Client: Marine & Civil Duration: 24 Months The works of this project included... Expansion to CSBP Plant. Placing 10,000 M3 Concrete. Bases, Pedestals. Pre Cast Panels. Large Concrete slabs. Radius bases. Formwork /reinforcing / Earthworks. See more
13.01.2022 Location: Byford Keenan Bridge Our Client: Carnac Construction The works of this project included Emergency Access Concrete Bridge
13.01.2022 Kwinana Golf Course Seats Location: Medina Duration: 1 Week The works of this project included Concrete Jarrah Top Seats
13.01.2022 Cassia Glades Location: Kwinana WA Our Client: LD Total Duration: 1 Week The works of this project included... Concrete Polished BBQ Top See more
10.01.2022 Middleton Beach Location: Albany WA Our Client: Neo Infrastructure The works of this project included 300 Metres of Retaining Wall
08.01.2022 Kings Park May Circle Memorial For WW1 Soldiers Location: Kings Park WA Our Client: LD Total Duration: 8 Weeks The works of this project included... Precast Bench - 39 LM N40 Polished Glass Finish See more
08.01.2022 Glen Iris / Rathmines Water Tanks Location: Bunbury, WA Our Client Omega Construction Duration:8 Months The works of this project included; 8 Meter high Water Tank. ... Placing 800 m3 Concrete. Concrete Bases. Concrete Slabs. Earthworks. Footings. Panel formwork. See more
07.01.2022 Honeywood Concrete Stairs Location: Anketell Kwinana Our Client: LD TOTAL Duration: 3 Months The works of this project includes, ... Concrete Stairs Exposed Aggregate. See more
07.01.2022 Hadrian Dyno Noble Project Location: Port Headland, WA Our Client: IPS Duration: 7 months The works of this project included;... Construction of an explosive plant. Placing 1000m3 Concrete. Foundation. Pedestals. Slabs. Earthworks. Formwork / Reinforcement. See more
07.01.2022 Xstrata Zinc Filter Plant Upgrade Location:Queensland Our Client: IPS Duration: 8 Months The works of this project included; ... Placing 1300m3 concrete. Ring Beam installation. Zinc Building. Concrete slabs. Lead Storage Building. Transfer stations. Formwork. Reinforcing. Earthworks. See more
07.01.2022 Roleystone House Location: Roleystone WA Our Client: Bale Construction Duration: 6 Weeks The works of this project included;... Retaining Wall 55 Metres Long x 3 Metres High Earthworks Formwork Concrete Pour See more
05.01.2022 Moora Mines Location: Moora WA Our Client: SJ Crushings Duration: 4 Months The works of this project included;... Push up concrete walls. Foundations. Pedestals. See more
05.01.2022 St Georges Terrace Location: Perth Our Client: LD TOTAL Duration: 4 Months The works of this project included;... Planters. Concrete seating. Table tops. See more
04.01.2022 Southern Gateway Alliance Location: Perth to Bunbury Our Client: Leightons Duration:18 Months The works of this project included;... Construction of 7 bridges. Placing 5000 m3 concrete. Abutments/ Pier Columns. Reinforcement. Formwork / Earthworks. See more
04.01.2022 Fremantle Ports Location: Fremantle, WA Our Client: Marine & Civil Duration: 3 Months The works of this project included; ... Extension to Wharf. Precast pile caps. Placing 500m3 Concrete. Reinforcement. Concrete slabs. Worked in strict tolerances. See more
04.01.2022 Gorgon Jetty Pre Assembly Location: Henderson, WA Our Client: Leightons Duration: 24 months The works of this project included;... The Gorgon LNG Jetty. Construction of Caissons. Formwork installation. Concrete Placement. Labour hire. See more
04.01.2022 Brownes Dairy Operations Location: Balcatta WA Our Client: Brownes Food Operation The works of this project included Concrete Slab
03.01.2022 Location: Cannngvale Our Client: Concreting WA The works of this project included New Concrete Base
03.01.2022 Coral Bay Water Storage Tank Location: Coral Bay,WA Our Client: DM Civil Duration: 3 Months The works of this project included;... Construction of a radius 5 Meter high Water Tank. Radius formwork. Reinforcement. Concrete Placement. See more
02.01.2022 Location: Claremont Our Client: LD Total The works of this project included BBQ Concrete Polished Top
02.01.2022 Location: Boddington WA Our Client: Phase Three The works of this project included Concrete Stair Case
02.01.2022 Kwinana Location: Kwinana WA Our Client: Ixom Duration: 1 Week The works of this project included... Hexagonal Concrete Slab & Concrete Path . See more
01.01.2022 Brownes Dairy Location: Balcatta WA Our Client: Brownes Dairy Food Duration: 1 Days The works of this project included;... (Concrete Slab) Formwork Concrete See more
01.01.2022 Utah Point Pre-Cast Pile Caps Location: Medina / Casting Yard, WA Our Client: Marine & Civil Duration: 2 Months The works of this project included; Construct 300 precast piles.... Worked in strict tolerances. Concrete Placement. Steel molds. Transported to Port Headland. Pre Cast Yard used to manufacture See more
01.01.2022 South Perth Apartments Location: Perth, WA Our Client: DAVROB Duration:1 Year The works of this project included; ... Premium Luxury Apartments. Placing 1000m3. Retaining Walls. Suspended slabs. Columns. Lift shafts. Reinforcement. Earthworks. See more
Related searches
- Pretty Perfect Plumbing Services
Home improvement Roofing service Construction company Boiler installation & repair service
+61 403 059 293
Morwell 3840 Morwell, VIC, Australia
417 likes
- Hamiltons Truck and Bobcat Hire
Home improvement Landscape company
+61 438 438 623
Winchelsea 3241 Winchelsea, VIC, Australia
77 likes
- J Croft Carpentry
Home improvement Construction company Carpenter
+61 413 899 163
Tramway rd 3840 Pakenham, VIC, Australia
1080 likes
- Peninsula and Westernport Automatic Gates
Home improvement Business service
+61 403 007 636
104 Bungower Road 3912 Somerville, VIC, Australia
43 likes
- Morwell Curtains & Blinds
Home improvement Contractor Blinds & curtains shop
+61 3 5134 3652
34-38 George Street 3840 Morwell, VIC, Australia
598 likes