Australia Free Web Directory

Caledonia Group | Local service



Click/Tap
to load big map

Caledonia Group

Phone: +61 8 8326 3365



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Caledonia NZ Client: Built Project: Event Cinemas Newmarket Vmax 1 & 2 Auditorium birdcages completed in Event Cinemas, Newmarket.... Our clients from Built are very pleased with the progress. Five more auditoriums to erect. Logistical challenges, in both design and getting equipment in and out of the complex have been dealt with safely and efficiently. Good work, team. See more



25.01.2022 Caledonia Group Design Innovation - VR Technology As part of our commitment to innovation and continuous improvement, Caledonia Group have recently invested in the use of VR technology to further enhance our design and engineering capabilities. The use of VR technology enables clients to walk the design in real time to inspect its viability prior to construction. A full menu of options is available within the VR Prospect software to enable full interaction with the model.... A major benefit of this technology is that the client and designer can work together, making live amendments to a design, even when located in different locations; adding to the overall efficiency of the process. The use of 3D animations and VR technology positions Caledonia as an industry leader in this field and further enhances our overall suite of integrated services offered to our clients. https://youtu.be/vygvgTM7FrQ

23.01.2022 Caledonia WA Client: Byte Project: Perth Bus Depot The client approached Caledonia to find a solution to their restricted access issue at the Perth bus depot. Using Layher, the Caledonia deign and engineering team came up with a plan which was both timely and efficient, preventing any delays to access for the client.... Another great example of the capabilities of Layher and our in - house design team that makes Caledonia to be the go-to company for specialised access solutions. Well done to Gav Baker and Dale Cantwell for executing the works on site within some tight time constraints.

22.01.2022 Caledonia Group Insulation & Cladding Our I&C team have just completed the pre-fabrication of three feeder tanks for a WA client. These works were completed in our Gnangara fabrication yard, significantly minimising our footprint on site; allowing for a seamless installation process. The fabrication was completed using high grade 316 stainless steel to account for the tough environment on site. Another quality job from Clinton Bailey and his team.



22.01.2022 Caledonia NZ Client: Cook Brothers Project: Auckland Airport Campus Roof Upgrade The Auckland team have commenced Stage 1 of the encapsulation scaffold this week. The templates are being constructed and levels set. The internal crash decks are well under way and the crews are ahead of schedule with night shift works. The project will eventually have two temporary roof structures - 30mx100m each. The estimated project duration is approximately 2 years.

22.01.2022 Caledonia Group are supporting the recent Bushfires through the Red Cross Disaster Relief and Recovery initiative. On January 29th, employees will donate a minimum of one hours wage to support the relief effort across Australia. In addition, every dollar donated by our employees will be matched by Caledonia Group. A big shout out to WA State Manager Colin Gibson for coming up with the initiative, and to everyone at Caledonia for getting behind the campaign with their individual donations. Our hearts and prayers go out to all those who have been affected by the devastating fires across the country. The link below offers more information on the Red Cross Disaster and Recovery initiative and how you can donate or apply for emergency grants for those most affected. https://www.redcross.org.au//disaster-relief-and-recovery-

22.01.2022 Caledonia NZ Corporate Fishing Trip The NZ team recently put on another fishing charter for our clients and staff. A great opportunity for everyone to get together and kick back after a busy year all round. A fantastic day with great weather ending in the whole crew walking away smiling with a belly full of BBQ and a bucket full of fresh fish for their families. Thanks to all those who took the time to attend and we look forward to the next one!!



20.01.2022 Caledonia Trainees. Where are they now? - Samuel Upston Samuel Upston mobilised to Minara Resources, Murrin Murrin site two weeks ago. This was his first industrial site since passing his Intermediate Scaffold course, as he nears the end of his traineeship. Reports from the scaffold crews and the Supervisors have praised Sams work ethic and safety awareness on site. This is paramount to our industry and further proof that Caledonias traineeship program is achieving its long... term goals. Young men like Sam are an integral part of the long term future of Caledonias work force and its fantastic to see them embarking on a career in the scaffolding industry.

20.01.2022 Reward & Recognition Program Brenton Sadler The Caledonia SA team recently congratulated Brenton Sadler on 15 years of service with the company. Brenton joined Caledonia back in 2004 and has been an important member of the team, working on many of Caledonias major projects across South Australia. Brenton has developed a fantastic working relationship with our clients through his highly personable character and attention to detail; always prepared to go the extra mile to en...sure a quality outcome for everyone. Most recently Brenton has developed his skill set further by becoming Caledonias inaugural Drone Operator, obtaining his licence earlier this year. Brenton is pictured receiving a certificate of appreciating from SA Superintendent Dwaine Humphrys, along with a holiday break in the Barossa Valley. We thank Brenton for his service and loyalty to Caledonia thus far and look forward to the next 15 years! See more

20.01.2022 Caledonia NZ Cook Brothers Auckland Airport As part of our ongoing works at Auckland Airport, Caledonia NZ have delivered a 5kPa loading bay for our client Cook Brothers Construction. Caledonia manufactured sleeve and gudgeon gate adaptors with the addition of Layher toe boards to make the loading bay access gates pictured below.... #caledoniagroup #scaffolding #layher

20.01.2022 Caledonia SA recently held its annual scaffold traineeship open day at the Lonsdale premises. Potential candidates interested in commencing a career in the industry were introduced to key Caledonia personnel and were given an overview on the companies operations in both Australia and New Zealand. After enjoying a healthy provided lunch and touring the yard and facilities, candidates participated in a model building exercise to test their aptitude and lateral thinking. Caledonia SA first implemented its traineeship program in 2013 and at its Perth branch in 2014. We target a biannual intake of 8 trainees per year, with the next intake scheduled for March 2020. To apply please complete the F-154 Traineeship Program Application form (available at www.caledoniagroup.com.au) and email it to [email protected]

20.01.2022 Caledonia Group Charity Golf Day What a fantastic day was had by all who attended Caledonias Charity Golf Day on Friday the 6th December at Flagstaff Hill Golf Club. 44 players came together to raise money for the Smiling Child Foundation, established by Caledonias industry partner Redspear / Safespear. This was the inaugural fundraiser for the foundation, providing assistance to Raukkan Aboriginal School in SA and Hillcrest School in the West. Through a number of comp...etitions including a Hole in One Challenge, Chipping & Putting competitions, Par 3 Fortfeit Hole, Silent Auction Wine Wall and Table Raffle a grand total of $11,000 was raised by those who attended. Our thanks goes out to everyone who made this such a great success, both by taking part and through your sponsorship and donation of prizes for the auction. Congratulations to all of our prize winners, with the team from OZ Minerals taking out the major prize! Looking forward to next year.



19.01.2022 Caledonia Group would like to wish all our staff, clients, suppliers and families a very Merry Christmas and a Happy New Year. We thank you for your support throughout 2019 and look forward to an exciting 2020.

19.01.2022 We have found ourselves in unprecedented times. COVID-19 has affected all of us, whether its personally, in business or at work. Caledonia Group will remain fully operational, with the aim of continuing to support our clients and communities in this tough time. Our hearts go out to all those feeling the effects of the virus, and we hope youre taking this time to look after yourselves and stay safe. Read on to find out how were doing our part to stop the spread. Our Policy can be found here https://buff.ly/2yM41mS

18.01.2022 Caledonia Group Working At Heights Campaign We operate in a high risk environment each and every day and the safety of our employees is always at the forefront of our minds. Caledonias High Priority Goal No1 is that We will foster and grow a positive safety and quality culture. To assist with re-enforcing this message to our staff, Caledonia has launched a Working At Heights Campaign across its entire business. The theme of the campaign is Think Smart Before You Start...! where our employees must ask themselves if they have considered the following before they undertake a specific job or task: Have I received adequate training, information and supervision? Have I completed a risk assessment and considered how I am going to undertake the task safely? Am I using the correct equipment? Is my equipment in good working order and have I inspected it before use? Do I have safe and secure access to the work area? Are the weather conditions safe to work at heights? Do I require a working at height permit? Is a rescue plan in place? A series of posters have been developed to drive home this message and these have been distributed to local and remote sites across Australia and New Zealand. The campaign is also being delivered via our pre-starts, toolboxes and internal newsletter to ensure the message reaches each and every individual within the organisation. Collectively, were all responsible for making sure our employees return home safely at the end of each day and campaigns such as this certainly assist in making sure that we respect the high risk environments we operate in, taking the right steps to ensure the safety of ourselves and others we work with.

18.01.2022 Caledonia SA Contract Award: Carrapateena Scaffolding Services Caledonia Group are delighted to announce its SA Division has been awarded the recent contract for Scaffolding Service at OZ Minerals Carrapateena mine. Caledonia will provide maintenance and shutdown services for both the underground and processing plant areas of the mine.... The first of our crew has mobilised to site, and this award further enhances Caledonias long term working relationship with OZ Minerals. Anyone interested in future opportunities to work with Caledonia at Carrapateena can apply via our website.

18.01.2022 Caledonia SA Reward & Recognition Some of our crew have been awarded for their outstanding efforts across various sites in SA. They were recognised for their consistent, high standard of scaffolding and promoting a positive safety and quality culture which was supported by positive feedback from several clients. Congratulations to David Eccles, Neil Dunlop and Jason Jamieson (not pictured).

18.01.2022 Caledonia Group AOG Conference Perth The Caledonia team look forward to welcoming you to our stand at the AOG Conference in Perth. Youll find us on stand F13 in the Asset Integrity area. This year we are showcasing our Design and Engineering capabilities through our fully interactive Virtual Reality software, highlighting the benefits it can bring to projects within the Oil and Gas sector.... #Caledoniagroup #virtualreality #designandengineering #insulationandcladding #scaffolding

17.01.2022 Caledonia NSW were recently engaged by CPB to complete access and propping scopes of work on the Coffs Harbour hospital redevelopment project. Caledonia have completed all scopes of work without issue and on target. The perimeter scaffold was erected to act as edge protection for the building levels. This was also utilised for the installation of the façade panels. Caledonia have mobilised over 400 ton of scaffolding to the project and peaked at 25 men working continuously 6 days a week. This has been a challenging project and the actual prefabrication and structural installation method is the first of its kind in Australia. https://lnkd.in/ghaqhiz

16.01.2022 Caledonia NZ: Focus Construction A great drone shot of one of our encapsulation jobs in Auckland. The Madison Apartments is the NZ teams first job with our new client Focus Construction. Focus have been delighted with our work to date and we look forward to developing our working relationship further. Well done to all the team whove worked on The Madison project so far.

15.01.2022 Caledonia SA Trainee Update Meet Caledonia trainee Jaye Suggate, aged 19, from Adelaide. Heres Jayes story I applied for the traineeship with Caledonia as I wanted to get into the construction industry straight after school. I heard about Caledonias traineeship through a friend who was considering applying. I attended the open day and information session at Caledonias Lonsdale office and after that I was offered the position. My traineeship started in February 2018. ... In the beginning I spent 3 months in the yard, learning what each individual piece of scaffolding was called and what it was used for. This enabled me to sign off on Module 1, before heading out to site. Once on site, I was paired with two advanced scaffolders to learn on the job. After five months with them I was confident carrying out work on my own with supervision. My first experience was on the Sarah Construction Carmelite project, which was a large aged care facility in Glen Osmond. This was a good job to work on as it was built out of Layher, which most other companies dont use. Since Carmelite Ive worked on Glenelg Pier Bridge upgrade, Sellicks Buddha Temple, Prominent Hill Mine shutdown, Regional bridge upgrades for McConnell Dowell as well as the old Royal Adelaide Hospital re-development. My favourite project so far has been the Sellicks Buddha Temple for BMD. This is because it was such a unique project and one of the biggest Ive worked on. We had a great crew and it was a great location overlooking the beach at Sellicks. Caledonia is one of the largest scaffolding companies you can work for, covering all different types on industries, using different scaffolding systems. The traineeship is important as you are an investment in the future of Caledonia. They provide you with your basic and intermediate scaffolding tickets and put you through other licences such as forklift, EWP, dogman and working at heights, ending up with a Cert III in scaffolding. I hope to end up as an advanced scaffolder for Caledonia. Id recommend the traineeship to anyone who is interested in getting into the scaffolding or construction industry. Little experience shouldnt hold you back as Caledonia will provide all the knowledge and licences you need to succeed.

13.01.2022 Caledonia SA Lendlease Osborne One of four fire retardant Lyta-Mesh encapsulated stretcher stair access towers that will eventually be topped up to 10m, erected for our client Lendlease at their OSDP (Osborne South Development Project) site.

11.01.2022 October is National Safe Work Month and Safework Australia are launching their Be a Safety Champion Campaign. This falls in line with Caledonia Groups Critical Risk Program, and were supporting the campaign by nominating our own Safety Champions to become the Health & Safety leaders within our organisation. Throughout the month of October well be announcing our Champions and following up on the activities and initiatives they develop to promote and support best practice and a positive safety culture across the Group.

11.01.2022 Caledonia SA Lendlease Osborne The last of three 30m stretcher stair access towers erected for our client, Lendlease, at their OSDP (Osborne South Development Project) site. All three were erected using the 1m lift technique, eliminating working at height risks. Job well done by Dave Eccles and his crew!

10.01.2022 Caledonia Group Safety Champion, Working At Heights As part of Octobers National Safe Work Month, Caledonia have appointed our Working At Heights Safety Champion, Steve Holt. Steve has taken on the role as part of Caledonias Critical Risk initiative; assigned with a number of responsibilities to ensure the Group is aligned with understanding, identifying and reacting to the risks surrounding Working At Heights.... We welcome Steve into the Caledonia Safety Champions Team

09.01.2022 Great pick up with new client, Paint Professionals. Looking forward to working you! #Repost @paintprofessionals (@get_repost) @paintprofessionals awarded the iconic Quintessential Equity #431KWS multistory exterior beautification project here in #adelaidecbd Watch this space #world ... Quoted and won on @paintpad_app Thank you Project Management Team @appcorp ; Scaffold Engineering and Construction Team @caledonia_group ; Project Specification Team @duluxaus #duluxaccreditedpainters #gopaintprofessionals #gopaintpad #waronsloppypainters #brushwiththebest #adelaidepainters See more

09.01.2022 Caledonia is now accepting applications for its unique Scaffolding Traineeship Program commencing August 2019. Trainees will receive an 18-24month* traineeship with a career pathway that could lead into a permanent position, work with us (on-the-job training) and simultaneously undertake study with a Registered Training Organisation (RTO) and gain a National Accreditation Certificate III in Scaffolding. Applications close on Sunday, 21 July. To apply, please follow the link: SA - https://buff.ly/2JlyhGI WA - https://buff.ly/2L0KB2q

09.01.2022 Caledonia WA Design & Engineering In conjunction with Edith Cowan University (ECU), Caledonia Group have developed a relationship that allows Engineering Students from the university to complete the practical element of their studies. Following Caledonias involvement in the ECU Engineering Open Day, there was strong interest from the students, having been offered exposure to Caledonias day to day engineering operations, and insight into the many complex projects that the... company have been involved in throughout Australia and New Zealand. Through the engineering smarts such as 3D animations and VR technology, Caledonia are able to present bespoke designs and provide solutions to complex access problems, resulting in long term cost efficiencies and increased safety for our clients. Pictured at our Gnangara office (left to right), Krit Luhoomun, ECU Intern, George Baiju, Caledonia Engineer and Eric Mukasa, ECU Intern. Welcome to the team and thanks for your efforts thus far.

08.01.2022 Caledonia Group Insulation & Cladding Client: Nyrstar Project: Pt Pirie Lead Smelter Caledonias Insulation & Cladding division have spent the past few months on site at Nyrstars Pt Pirie Lead Smelter, performing a range of services surrounding shutdown and routine maintenance scopes of work.... Up to 14 men have been on site across the various work fronts on continuous day / night shifts, most recently completing the Goose Neck refurbishment (pictured). Whilst Caledonias scaffolding division were erecting the access, the I&C team started their scope in the workshop yard offsite and helped with finishing off critical hold points before transport of the Goose Neck to site commenced. From this our scope of work grew when the client uncovered other critical part to the overall project. We assisted with the removal of insulation and cladding on the additional emerging works and reapplied new insulation whilst working in conjunction with the area operators and other trades. Caledonia have successfully insulated more than 2500m2 of pipework and vessels over the course of the last five weeks, to help the client with their critical path. Work is expected to continue until mid - August.

08.01.2022 Caledonia Group: Mates In Construction - National Industry Partner Representatives of our NSW division recently attended the Mates In Construction charity lunch, held at Doltone House, set in the beautiful Darling Harbour precinct. A fantastic event, providing a great insight into the invaluable work MIC perform in the prevention of suicide and increased awareness of mental health in the construction industry. MCs for the day were comedians Tahir Bilgic and Rob Shehadie, w...ho provided the room with plenty of laughs as well as some unexpected audience participation. Caledonia Group were delighted to sponsor the post lunch networking event, where we were presented with a National Industry Partner Plaque for our ongoing support of Mates In Construction across our geographical locations. Many thanks to Greg Johnston and the MIC team for the invitation and opportunity to sponsor the event and we look forward to the next one!

08.01.2022 Caledonia were privileged to provide the full scaffolding services scope for SLC (Saipem Leighton Consortium) during construction of Chevrons 2.1km Gorgon Project LNG Jetty. This photo, taken from the helideck of the Norce Endeavour DLB in October, 2013, shows the Jetty during the construction phase. The Gorgon Project is operated by an Australian subsidiary of Chevron and is a joint venture of the Australian subsidiaries of Chevron (47.3 percent), in joint venture with the Australian subsidiaries of ExxonMobil (25 percent), Shell (25 percent), Osaka Gas (1.25 percent), Tokyo Gas (1 percent) and Chubu Electric Power (0.417 percent) #tbthursday

07.01.2022 Caledonia Group - APPEA Conference Members of the Caledonia BD team were delighted to attend the 2019 Australian Petroleum Production and Exploration Association (APPEA) Conference in Brisbane recently. This provided a great opportunity to meet with both existing and new clients whilst gaining a greater insight into current and existing projects across the country.

07.01.2022 Caledonia NSW - Lendlease Project - New M4-M5 Link Tunnels WestConnex We have recently been awarded the New M4-M5 Link Tunnels project for Lendlease. The project is the final and most critical component of WestConnex, featuring twin tunnels between the New M4 at Haberfield and the New M5 at St Peters. Each Tunnel will be approximately 7.5 kilometres long and able to accommodate up to four lanes. Our first scope of works was to build a walkway from one side to another with a ...16m stair access into the tunnels, facilitated using two stair accesses and craneable bridge section. Not only did this save the client over 240 man hours, but also allowed continuous access to the M4-M5 Link Tunnel for other trades. The bridge landed perfect without any adjustments. Congratulations to Mick Tolley, Sean Nyugen Brad Nichol and Sam Sweetser as well as the design and engineering team for a job well done.

06.01.2022 Caledonia SA Ferretti International Project - Barker Inlet Power Station Caledonia have been engaged by Ferretti International to build 5 large fuel holding tanks. We have a team of six working up to 12 hours per day six days per week to delivery full perimeter and internal access, including large roof encapsulation for full construction and painting and blasting works . The team have delivered some excellent engineered scaffolds. Caledonia looks forward to many more proje...cts work with the Ferretti crew. A quick mention to the Caledonia team of Bevan, Darren, Nath, Steve, Darian, James, Gavin & Sam, for their endeavours on site thus far.

06.01.2022 Caledonia Group - GMUSG Conference Come and visit our team at booth 14 at this years GMUSG Conference in Pt Pirie. Have a chat with the team and learn more about our range of industrial services within the Upper Spencer Gulf and beyond.... Well done to Mark, Tanya and the rest of the team for putting on another cracking event.

05.01.2022 Caledonia Group New Industry Partner Caledonia Group is delighted to announce our newly formed industry partnership with Scan-Rent Australia. Scan-Rent are industry experts in vertical access solutions. Through this collaboration, Caledonia will now offer a complete range of world-class, safe access solutions to best suit any client requiring vertical access. The range of access solutions provided through Scan-Rent includes:... Mast Climbing Work Platforms Material Hoists Personnel & Material Hoists Suspended Working Platforms Caledonia has chosen to partner with Scan-rent through a combination of their expertise, project experience and delivery, safety record, quality assurance, servicing capabilities and commitment to innovation in maintaining their status as a market leader in providing vertical access solutions. We look forward to a long - term working partnership with Scan-Rent.

05.01.2022 Caledonia NSW Reward & Recognition Congratulations to Tristan Norris who has recently been recognised for his commitment to safety on the MOC3 Arncliffe area of the Westconnex New M5 project. Caledonias client, CDSJV presented Tristan with a $100 voucher and certificate as part of their National Safety Champion campaign.... Well done Tristan for both the quality of work and safe practice being delivered on this project.

02.01.2022 Caledonia SA Trainees As part of their traineeship program Caledonia SAs current trainees (Mitch Murphy, Jaye Suggate, Ben Valentine-Proffit, Stephen Ross and Harry Jones) recently undertook a practical training exercise at our Lonsdale facility. The trainees were tasked with erecting traditional tube & fitting scaffolds under the watchful eye of one of our regional supervisors, Neil Dunlop. Great to see the trainees displaying some of the skills theyve learnt so far and the next crop of scaffolders coming through the ranks!

01.01.2022 We have found ourselves in unprecedented times. COVID-19 has affected all of us, whether it’s personally, in business or at work. Caledonia Group will remain fully operational, with the aim of continuing to support our clients and communities in this tough time. Our hearts go out to all those feeling the effects of the virus, and we hope you’re taking this time to look after yourselves and stay safe. Read on to find out how we’re doing our part to stop the spread. Our Policy can be found here https://buff.ly/2yM41mS

01.01.2022 https://www.seek.com.au/job/50236833

Related searches