24.01.2022 All cladded and locked up.
24.01.2022 Site cut done and retaining walls starting to go in.
23.01.2022 Work has started on a new Zenith Designs build in Narangba. A bit of earth works to get ready for retaining walls and slab.
20.01.2022 Frames and trusses going up.
20.01.2022 Wrapped up with windows and doors in and cladding and brick work underway.
19.01.2022 All painted up, tiled and carpets going in.
19.01.2022 Start of a new extension in Bray Park. First a little bit of demolition of the existing structure thats there.
17.01.2022 It’s been a few weeks and we’re a fair way along since our last post. Bricks and cladding are finished, gyprock is done and painting and tiling are underway.
17.01.2022 A nice little pool we just built getting ready for summertime. #carldanhomes
16.01.2022 Rough-ins are done, the windows and doors supplied by Clontarf Glass and Aluminium have gone in and were starting to clad in a Post War style log cabin weather board to match in as close as we can with the existing dwelling.
15.01.2022 New outdoor area and outdoor kitchen in Newport.
13.01.2022 Installed a new deck and access ramps for a great friend.
10.01.2022 What a transformation.... This build was in 2018 and I still look back and can’t believe what this little Woody Point cottage became. You would not think it was the same house.
10.01.2022 A quick kitchen makeover in Peregian.
08.01.2022 Stumps are in and floor is down ready for frames and trusses.
07.01.2022 The slab all prepared and poured thanks to Peter Baker and his crew.
07.01.2022 Its been a few weeks and were a fair way along since our last post. Bricks and cladding are finished, gyprock is done and painting and tiling are underway.
06.01.2022 Fascia, gutters and battens going up ready for the roof before Xmas.
05.01.2022 Electrical rough-in done thanks to Nathan Morgan at NM Electrical
04.01.2022 Roof is on and ready for rough ins.
04.01.2022 Demolition complete and ready to start marking out the new stumps to bring the new floor up into level with the existing house.
04.01.2022 Wall frames up and ready for trusses and tie downs.
03.01.2022 Roof is on and ready to be wrapped and have windows put in.
03.01.2022 Trusses, fascias and gutters are up and ready for the insulation and roofing.
03.01.2022 Something a little different... I was given a unique opportunity to bring this beautiful old workers hut back to its former glory.
02.01.2022 What a transformation.... This build was in 2018 and I still look back and cant believe what this little Woody Point cottage became. You would not think it was the same house.
02.01.2022 All sheeted up, painting and bathroom started.
Related searches
- Liquid Interactive
+61 7 3363 5300
Level 1/324 Wickham St, Fortitude Valley 4006 Brisbane, QLD, Australia
1233 likes
-
- Grolife Landscape Management
+61 1300 476 543
91 bridge street, Fortitude Valley 4006 Brisbane, QLD, Australia
120 likes
- FV Peppers Residences
Property Property management company Company
+61 7 3118 9191
179 Alfred Street 4006 Fortitude Valley, QLD, Australia
978 likes
- Grolife Landscape Management
+61 1300 476 543
45 East Street, Fortitude Valley 4006 Brisbane, QLD, Australia
157 likes