Australia Free Web Directory

Carpentaria Rail in Mount Isa, Queensland | Business service



Click/Tap
to load big map

Carpentaria Rail

Locality: Mount Isa, Queensland

Phone: +61 413 178 182



Address: 21 second Avenue 4825 Mount Isa, QLD, Australia

Website: http://www.carpentariarail.com

Likes: 59

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Such an important project



25.01.2022 Replacing a 19th century railway bridge in just 57 hours!

24.01.2022 Space at a premium

20.01.2022 3 years to salvage the Baltic Ace



20.01.2022 When things go wrong. Looks like Hong Kong

19.01.2022 Australia’s largest coal producer BHP Group has announced it will automate 300 jobs in Queensland’s Bowen Basin following the conversion of 86 Komatsu trucks to autonomous haulers next year.

15.01.2022 Kalgoorlie-based MLG Oz has added a new combination to there fleet the B-QUIN . The combination manufactured by Bruce Rock Engineering Is made up of five 20’ sk...el trailers roll-coupled via turntables fitted to the rear of each of the four forward trailers and towed by a tri-drive Mack Titan. It carries Nickel concentrate in powder form in Bulka Bags that are loaded into 20’ containers which are then lifted onto the skels. it’s a first for Bruce Rock Engineering, engineered with low tare weight for maximum loading. Payload target is 23tonnes per container , achieving a Gross Combined weight of 148 tonnes. Look out for em between Esperance on the southern WA coast and Ravensthorpe, they be running around the clock.



14.01.2022 Oops...At Prairie. Photos courtesy of @Jodie Hunter.

14.01.2022 Unload the wagons from cargo ship

14.01.2022 The Far North is on the cusp of a horticulture boom.

12.01.2022 Port of Townsville Limited and North Queensland Bulk Ports Corporation, Weipa and #Ports North, Cairns Port, Karumba should be fully amalgamated for maximum benefit to the region.

12.01.2022 The more we can get on rail, the better for our country.



09.01.2022 The gauge standardisation of Victoria needs to be completed as a matter national priority, even if it requires funding from other states to complete it and in preference to new projects. https://www.theage.com.au//obsolete-19th-century-rail-farm

08.01.2022 This is how train tracks are installed

06.01.2022 Meet the ‘Octopus', an excavator sleeper laying attachment. This impressive creature can lay up to 1km of sleepers per day (that’s about 1,666 sleepers!). Gr...eat news considering we have so much ground to cover over the #InlandRail route. For more on Inland Rail head to our website here: https://inlandrail.artc.com.au/

05.01.2022 Wow....that really was close

05.01.2022 Built 2013, draft 16m. 200,000 tonnes. Cruises at 30km/hr

04.01.2022 We've not seen a ship quite like this one... Take it away, Richard Hammond!

04.01.2022 Flat country when it rains

03.01.2022 Automation is the future

01.01.2022 The old way of doing it

Related searches