Australia Free Web Directory

Carters General Engineering in Bathurst, New South Wales | Engineering service



Click/Tap
to load big map

Carters General Engineering

Locality: Bathurst, New South Wales

Phone: +61 2 6331 6811



Address: 3 Toronto St 2795 Bathurst, NSW, Australia

Website: http://www.cartersengineering.com.au

Likes: 515

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 This what the sand blaster looks like after a big job. Time for a big clean



24.01.2022 Today we successfully completed another Coal Bin project, Carters were asked to replace the top section of a Coal bin that had seen better days, 7 years ago we built and installed the lower section and today we manufactured and installed a new top section.

23.01.2022 A couple of aluminium platforms completed ready to be delivered to site. Good way to finish the day off before Christmas. Well done, guys!

23.01.2022 Handrail waiting for a sand blast and powder coat for a maintenance platform for a client in the Central West.



23.01.2022 Weve yet to see anything a post it note cant communicate.

23.01.2022 A bit of variety going on in the shop today .

23.01.2022 Yes, the sign does need to be that big...



21.01.2022 Some more great Motion Amplification footage collected and analysed over the weekend. The footage of this slurry pump operating is a great visual example of poor structural design. The electric motor running the pump has had ongoing Issues with DE bearing failure. With the MA footage its easy to see why this is a recurring issue.

21.01.2022 Thanks to our awesome Event Sponsors One Agency Bestwick Real Estate Carters General Engineering Humphries Constructions The Well Fed Catering Company... Knickerbocker Hotel See more

20.01.2022 Pulleys from a mine in Central West in for bearing seals and a new shaft. #refurbishment

20.01.2022 Merry Christmas, everyone. We will be open over the Christmas break on all days except the public holidays. We hope you have a safe and happy break.

19.01.2022 If some of you were think we have been a bit quiet with our post lately its because we have been busy building and setting up our new rotating equipment refurbishment facility here in Bathurst, After working on the shop for the past 3 months we are finally in. We saw the need to further grow the business as our fabrication and rebuild buisness has taken off over the past 3 years and we were out of space having the two sides of the buisness under the same roof . The new shop... allows us to have the ability to carry out all aspects of our rebuilds under the one roof Washbay Blast bay Paint booth Boiler operated Autoclaves for hot bond rubber lagging Dynamic balancing 4x rebuild bays See more



19.01.2022 Geez were thankful for that white thing on the wall some days

19.01.2022 This week we were able to obtain some great Motion amplification footage of a conveyor drive that had some irregular issues showing during VA collection, Carters were Engaged to collect MA to help identify these issues. And as this video shows there is a lot of structural movement in the Skid that in turn adds significant unnecessary loads through the drive system. #cartersenginerring #conditionmonitoring #materialhandlingequipment #mining

17.01.2022 No rest for the wicked this Friday afternoon! We hope everyone affected by bushfires has a safe and happy weekend. Fingers crossed this smoke goes away too

16.01.2022 What the boss says goes Also, we dont have a clue what they mean about the Tupperware...

15.01.2022 At least the spelling is correct...

14.01.2022 We have just carried out a complete refurbishment on this conveyor pulley. The refurb included new shaft, locking, elements, SKF mine spec housings with Kobra seals and sealed sphericals and elastotec hot vulcanised 12 mm natural lagging. We are loving getting into the refurb work in the new workshop. Its purpose built and the turn around times are a reflection of how well it works

12.01.2022 Carters are an approved Elastotec applicator with an in house auotclave for all your hot vulcanising needs http://www.elastotec.com.au//ceramic-lagging-tile-loss-ca/

12.01.2022 Brevini planetary gearbox and Rollix Slew bearing replacement on a outotec supaflo course thickner that we completed up in the valley over the past week.

11.01.2022 A fresh batch of recently refurbished Pulleys all lagged in HV Elastotec lagging a Siemens gearbox and Warman Barrel all ready to be shipped back to there owners .

08.01.2022 Conveyor pulley refurb done New shaft, locking elements, SKF mine spec housings with Kobra seals, sealed sphericals AND Elastotec hot vulcanised 12mm natural lagging.

08.01.2022 You wouldn't think this would be necessary in an engineering workshop...

08.01.2022 No rest for the wicked

08.01.2022 Carters Engineering is excited to announce we can assist customers to build the ULTIMATE V8 4X4 SXS. We have partnered with Proformance Motorsport to build these incredible V8 Powered 4X4 machines. If you are interested in building one of these bad ass 4X4 Buggies, we can provide you with:... ** Tack Welded Chassis ** Fully Welded Chassis ** Rolling Chassis ** Complete, Turn Key Car - ready to race. Check out the video for more information about this amazing vehicle or contact us directly.

07.01.2022 Our new workshop is built for this stuff. Sheave rope pulley from a mine in Central West NSW. This one came in for bearings seals and a new shaft

06.01.2022 Very Happy with what Redline media have produced for us with our new website.

05.01.2022 Did you know we are an Elastotec approved lagging applicator as well as a certified SKF rebuilder and maintenance partner?

05.01.2022 Everything has a place and everything in it's place A clean and tidy workshop is the best Valentine's Day present we could've asked for

04.01.2022 Our team is currently working on a new website design for Carters General Engineering. Stay tuned to see what we come up with! If your website could do with a refresh, get in touch to find out how we can help.

04.01.2022 We have just completed a pulley rebuild here at Carters Engineering in Bathurst on a drive pulley fitted with SKF minespec housings, sealed spherical bearings and Kobra seals, lagged in 15 mm Hot Vulcanised natural grade diamond pattern Elastotec lagging . Did you know that Carters Engineering are certified SKF rebuilder and Maintinace partner and has full OEM support and warranty. Did you also know that we are able to offer a 3 year warranty on lagging failures. #Elasto...tec #SKF #Mining #ConveyorPulley #Engineering If you have any question or would like more information on what services we provide please feel free to contact us on 0263316811.

04.01.2022 Have you ever wondered what a split housing G series Radicon Gearbox looks like on re assembly ? Pretty cool hey, here at Carters Engineering its a weekly occurrence to rebuild gearboxes like these.

03.01.2022 It's all happening this week in the workshop. All hands on deck to get all our usual jobs out and done as well as a big refurbishment for a mine in Northern NSW

03.01.2022 Some of our new ceramic pulley lagging being applied for one of our clients Top job boys

03.01.2022 150 Ton Coal reject Bin that Carters have been contracted to design, fab and install over the Christmas New year period is almost complete on schedule and no injuries . Another good build .

01.01.2022 Variety is always good, a mixture of freshly refurbished rotating components, conveyor pulley, pump barrel, floatation barrel and screen exciter all waiting in dispatch .

Related searches