Caslec Electrical & Data in Sydney, Australia | Engineering service
Caslec Electrical & Data
Locality: Sydney, Australia
Phone: +61 2 9604 4488
Address: 3 Long St 2164 Sydney, NSW, Australia
Website: http://www.caslec.com.au/
Likes: 307
Reviews
to load big map
25.01.2022 This CASLEC LED lighting installation throughout this factory has been a particularly impressive installation. Of course, having completed with 410, 150Watt HANECO SKY PAD LED's have made an excellent impression.
25.01.2022 An update Manufacturing Drum Plant Section electrically designed & installed by Caslec within the existing operation plant.Considerable other electrical installations by Caslec within this update plant. #electrical installation plant #controls #sensors #drum plant
25.01.2022 WEG BUSINESS CONFERENCE - ELECTRICAL SYSTEMS. NOVOTEL TWIN WATERS , SUNSHINE COAST QLD.
24.01.2022 Electricity. Powerful, beautiful, even in the haze of a severe dust storm a few years ago that covered Smithfield where our head office is, this shot taken by Brian Cassidy standing out in the yard, the colour comparisons to this seasons bushfires are uncanny.
22.01.2022 An industrial Caslec installation to a distribution switchboard and various machines within the factory.
22.01.2022 Proud to be helping reputable pharmaceutical company, Pharmacare, with a series of LED lighting, switchboard, and ongoing electrical installations, ensuring zero down time at their production facility during the pandemic.
21.01.2022 Caslec is Open and Operating. #major site, #electricalinstallation, #caslec, #updatesection, #industrialsystem, #lighting, #LEDlighting #upgradeelectrical, #electricalcontrols,
21.01.2022 A number of very important, very large, VSD systems, (Variable Speed Drives) within the Caslec workshop to be repaired and provided with maintenance.
20.01.2022 A Caslec control system that provides a very positive & quality checking system from a Distribution Switchboard within buildings.
19.01.2022 Solar & Wind Installations are Certainly Increasing.
19.01.2022 A spectacular view on a recent large scale floodlighting project at White Bay and Glebe Island adjacent to the Anzac Bridge in Sydney. An Integrity maintenance inspection across 24 towers with a mixture of metal arcs and LED's, in collaboration with Tonkin Australia.
18.01.2022 A shot onsite during the initial stages of construction of the much celebrated Darling Harbour, some 35 years ago, a lighting project that saw us deploy a team of engineers and electricians, lighting that still decorates the foreshore today. In a city that continues to power forward, we're proud of our contribution to Sydney's infrastructure...past, present, and future.
17.01.2022 The first of 2 groups of large 135-360 Kilowatts WEG VSD's arrived at Caslec HQ throughout last week for a service upgrade. Used onsite 24 hours every day, these units are critical to our clients operation. Our management & service staff have assessed the VSD's & associated controls, with upgrades to begin in the coming weeks.
17.01.2022 Caslec required a large quantity of specialised data cabling for mining projects throughout Australia to provide special connections & terminations on screened instrumentation. This is only one section of special cables. #data, #cabling, #caslec, #installations, #mining, #instrumentation,
17.01.2022 Work continuing at Caslec hq this week on these WEG Vsds, a great ongoing project for us.
17.01.2022 This is a major warehouse being upgraded by Caslec with a total replacement of 410, 150Watt HANECO SKY PAD LED light fixture installations. As shown currently, half way of 205 fixtures are installed on the site and already update the illumination levels in half of the area of the warehouse. This is a project replacing the same number of 410 - existing 400Watt Metal Halide Fixtures. The LED installation and illumination level is very impressive & will significantly reduce the annual electricity $ cost. Lighting maintenance will also be reduced.
17.01.2022 One of our many LED lighting upgrades requiring precision design and installation.
16.01.2022 From lighting, power, and service installation maintenance, this was a complete fit-out for reputable pharmaceutical company, Pharmacare. We continue to provide a myriad of services ongoing.
15.01.2022 Caslec Installation & Design of Main Switchboard and Power Factor System
15.01.2022 Merry Christmas for all our Managers, Staff & Customers. CHEERS.
14.01.2022 Part of one of our first large public domain lighting projects for @meriton_group, a historical site (formerly A.C.I) in Waterloo.
13.01.2022 Standing strong. Powering forward. Despite the global uncertainty of the last 6 months, we're thankful things have been busy for us, working across a variety of projects, from factory fit-outs and large scale lighting projects to ongoing work at some of the countries most renowned commercial / industrial sites including this location featured here, VIP Drum, where we're carrying out service maintenance and industrial installation work. Visit us at www.caslec.com.au
11.01.2022 Substation, Conduits & Mains Service Cables, Major Main Switchboard, Being Installed by Caslec Staff in a Major Sydney Project Site.
11.01.2022 Caslec public domain lighting installation at Kent Rd Mascot, Meriton MAJOR Construction site. Significant quantity of external light fixtures combining 6 metre post tops, street lights & in ground lights throughout the site. Considerable underground electrical installations and specific switchboard.
11.01.2022 A Caslec Factory Installation with a large Main Switchboard and a Distribution Switchboard as shown within the image below.#major plant #distribution board #caslec installation
08.01.2022 A Number of Interesting images Installed by Caslec in the Club
07.01.2022 Lighting updated of a Sydney section as well as other areas of this very large site, dealing with considerable amounts of product production. #major site, #electricalinstallation, #caslec, #updatesection, #industrialsystem, #lighting, #LEDlighting #upgradeelectrical #successful
07.01.2022 A typical range of new installed, updated, repaired and serviced VSDs.
07.01.2022 Variable Speed Drives Repairs at Caslec Workshop. #vsddrives #Controlpanel, #considerableelectricalworks, #caslecbuilding, #caslecoperations, #vsd
05.01.2022 A refurbishment of a number of large WEG VSD's ranging from 110-355 Kilowatts, also shown previously. These VSD's control fresh air fans which are critical during the construction of new tunnels through Australia & of course importantly through NSW. As part of the refurbishment being completed by Caslec, the VSD controls are also being updated to allow external control/monitoring from an overseas company, 24 hours per day. #major site, #electricalinstallation, #caslec, #updatesection, #industrialsystem, #lighting, #LEDlighting #upgradeelectrical, #electricalcontrols, #wegvsd, #weg, #VSD, #caslecvsd, #service,
05.01.2022 Electrical equipment takes a beating under these conditions, this galvanising plant in Western Sydney requires ongoing service and maintenance, a 24 hour operation. www.caslec.com.au
03.01.2022 We have a position for a Licensed Electrician for Industrial and Commercial Installations including Data Communications. Send a response or call our office or send an Email to [email protected]
03.01.2022 The large group VSD Systems are now finalised and operating very well. A significant amount of technical work put together to complete the requirements.
03.01.2022 Commencing of Reactor Cabinets.. #major site, #electricalinstallation, #caslec, #updatesection, #industrialsystem, #lighting, #LEDlighting #upgradeelectrical, #electricalcontrols,
03.01.2022 An important Electrical Project throughout the the entire property, internally & externally, operating in Sydney near the Anzac Bridge by Caslec. Caslec staff shown on this photo working on this particular system, with other Caslec staff working on many other particular systems throughout this large site. #major site, #electricalinstallation, #caslec, #updatesection, #industrialsystem, #lighting, #LEDlighting #upgradeelectrical, #electricalcontrols,
02.01.2022 Large numbers of VS Drives received at the end of December and through January to be repaired or replaced that were delivered from mines, large factories & other contractors to our workshop in Smithfield. These images display the remaining last section of the major works of VS Drive repairs now in February.
02.01.2022 A CASLEC New Industrial Electrical Installation with New LED Lighting as well.
01.01.2022 Keep it neat. Nice piece of work on a recent large 2200 amp industrial switchboard installation at a glass manufacturing plant. This job also involved the supply and installation of 3 x 1500 kva substations and numerous switchboards. www.caslec.com.au
01.01.2022 This is a group of large cabinets with 2 very large WEG VSD's ranging from 110-355 Kilowatts in EACH cabinet on the left side having been almost completed of repairs & updated. Two more of each large VSD's on the right also & having arrived today to be fully updated as well. A major project repairing & updating with very important new technology to be connected in another country to be sure the system is correctly operating in Australia.
01.01.2022 Caslec Electrical Works Building & Office
01.01.2022 Caslec Installation and Design of the electrical Drum Manufacturing Plant. Main Control Panel with multiple, excellent VSD WEG Drives. #vsddrives #Controlpanel #newfactoryarea #considerableelectricalworks.
01.01.2022 Caslec Buildings.
Related searches
- mattys147_snookercoaching
Business service Personal coach
+44 7903 802368
146 walsall road walsall wood WS9 9AJ Walsall, WA, Australia
214 likes
- IMG Models Australia
Business service Modelling agency
+61 2 9260 2330
Level 2,179-191 New South Head Rd 2027 Edgecliff, NSW, Australia
3597 likes
- Start Up Wise
Business service Business consultant Market Research Consultant
+61 1300 550 575
32 Loller Street 3186 Brighton, VIC, Australia
50 likes
- Resolve & Effect Sustainability Solutions
+61 438 764 925
Neutral Bay 2089 Neutral Bay, NSW, Australia
18 likes