Australia Free Web Directory

Catalyst Constructions in Toowoomba, Queensland | Local business



Click/Tap
to load big map

Catalyst Constructions

Locality: Toowoomba, Queensland

Phone: +61 403 209 295



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Great view whilst replacing some aluminum privacy screening overlooking the story bridge.



24.01.2022 Another one of our deck jobs nearing completion. Coming up a treat.

22.01.2022 Some more progress pics from one of our jobs.

21.01.2022 Catalyst branching out and handling new challenges with ease! The boys hard at it on an office refurbishment we are currently working on.



21.01.2022 Catalyst getting amongst the booming commercial construction industry.

20.01.2022 Heres a few photos of our Lota job. Awesome view from the top floor!

18.01.2022 Just putting the finishing touches on an existing deck by installing a nice wide kwila hardwood handrail. Perfect for resting a nice cool drink on!



17.01.2022 A couple of progress shots of one of our current jobs.

17.01.2022 Getting through some cladding rectification works this week, off with the old and on with the new.

16.01.2022 Just a couple of progress shots from a new build we looked after the carpentry on a little while ago.

14.01.2022 New build we did in Greenslopes

13.01.2022 The finishing touches to one of our renovations.



13.01.2022 Another renovation we have on the go at the moment, which included the removal of external brickwork, extending onto the original house slab, new framing and new roof trusses and roof sheeting. Looking forward to getting some photos of the finished product.

11.01.2022 A little deck that had rotting decking boards, joists and stair treads that needed fixing up prior to the client selling. All removed, replaced and painted in a day, just in time for settlement day.

09.01.2022 Another project we have been working on this week. Dividing stage one and two of a major shopping complex by installing timber hoarding allowing the completed stage one area to open soon for trading whilst works can continue on the second stage.

08.01.2022 This is how we kicked off the year. The client had just purchased and wanted to add value to the house in order to maximize their rental income. This was achieved by changing around the internal framing to give a more open plan feel and also taking the house from a two bed to a three. The front external entry stairs had to be moved to allow for a relocated front entry, finished off nicely with a new front landing/deck. We stripped and re sheeted the bathroom ready for a full facelift by Tradewinds Plumbing. Some more photos to follow once the works are completed.

08.01.2022 Hi all! Catalyst is expanding and we are looking for an experienced Trade Qualified carpenter with tools/insurances/ABN etc for immediate start and an experienced or enthusiastic labourer/trades assistant also for immediate start. Both will be ongoing positions. If you think you fit this description or know someone who does please get in touch.

07.01.2022 Nothing like a quality coat of paint to finish things off nicely.

04.01.2022 Please check it out, share and support us.

04.01.2022 A sneak peak at our next project.

04.01.2022 What else would we rather be doing on a weekend.... getting an out of the ordinary new truss layout to marry in with the existing roof.

02.01.2022 Spread the word!!!

02.01.2022 All framing done, Fascia and gutter is on ready for roof. Nearly all the windows are in, ready for some linea board! Cant wait to see this house once cladding is done!!!

02.01.2022 Materials have landed for our next project, a nice big deck covered by a pitched insulated panel roof. Looking forward to the finished product!

Related searches