Australia Free Web Directory

Ceilings of Approval | Contractor



Click/Tap
to load big map

Ceilings of Approval

Phone: +61 407 984 027



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Just finished this huge shed enclosure. The client wanted a multi purpose room for music, games room, reading etc. This should be enough space for whatever he needs. After framing was completed, it took us just 2 and a half days to fully insulate, sheet and flush this massive 14m X 9m roomwith just the two of us. And at 4.5m high. We are hoping to see the huge 5metre diameter ceiling fan down the track once the blades go on that motor



24.01.2022 Putting up some nice 200mm plaster glass cornice today. Slow going but looks great when installed

24.01.2022 A 5metre canterlever ceiling today for a maximum veiw with no obstruction.

23.01.2022 Got to come back and see a job we did all painted. This reverse light trough has come up well. Will look great with the strip lighting all up and running.



23.01.2022 Day 2 of the office fitout

23.01.2022 Here are a few b4 and afters of a big house weve just finished in Wandi. We did all the steel work in the many bulkheads. A 5.5m high raked alfresco. 800 sqm of ceilings with 6 different ceiling heights throughout the house. Client very happy. And thanks to Haidon from Plasterfix Solutions for the days you helped us.

22.01.2022 A fiddly day today with patterned plasterglass cornice. This was just one bedroom consisting of 10 external mitres and 14 internals. Following the pattern right around and finishing it off was slow going but looks good in the end



20.01.2022 This job is coming along nicely. Just some of the many different floor levels, ceiling heights and angles we have to work with

20.01.2022 After a re roof, the owners wanted a more modern ceiling so we covered up the exposed beams.

19.01.2022 Nice basic job this morning. Installing a grid ceiling. Dropping it down from a 4m high concrete slab above down to 2.7m in preparation for new office fit out. All done start to finish in 4 hrs

19.01.2022 All done now, final stage for us was the grid ceiling. Builder was very happy with the results.

19.01.2022 Really enjoyed designing and building this tv wall for a custom entertainment system, but a few years later, back to simplify it a little for the new owners.



18.01.2022 Several different stages to the major renovation, this house is two story but split level with 6 different floor levels. Many more photos to come down the track but this is just a couple of examples of the different angles were dealing with. And the time consuming detail just for a cupboard that will rarely be seen.

17.01.2022 Top floor of a two story shed for a business in north Perth. We battened all the walls and ceiling, fully insulated, boxed in all beams. Very fiddly, many different angles and all square set. Came up good.

16.01.2022 At this old office workplace today to make sure this ceiling doesn't fall down. At 4.5m high this could have been a disaster. Sagging over 100mm in spots, we don't know how it was still there. We ran timbers right through with big bugal screws to hold it back up and ran a brand new grid ceiling underneath

14.01.2022 Just a quick three rooms in Williams. All sanded ready to paint

14.01.2022 The 200mm cornice posted earlier looks small up on these high ceilings, but in the flesh, the builder and owners are over the moon with the results. With the addition of another arch with extra detail the match in with this 1800s heritage home. This is just stage 1 of the renovation

12.01.2022 Our next job got delivered today.

12.01.2022 Another job done. This big open room is part of the decent sized extension for this house. 5.5m by 12m

11.01.2022 All topped. Next, sanding and then install the grid ceiling.

11.01.2022 Heres a huge 7m long curtain pelmet we framed up, sheeted and flushed. In preparation for a big set of curtains for these massive stacker doors. Just one piece of our work on this ultra modern house

11.01.2022 Another architect design house and granny flat weve been working on. Shadow line throughout. Multiple levels with a 5degree pitch raking ceiling throughout.

10.01.2022 Back to the 1800s home to put the 200mm cornice around kitchen cabinets. And the arch is all painted now and looks good

08.01.2022 Finished this job today. A pool house all fully insulated and completely square set around many beams. Alot of bead work in it but the finish looks great and clients are very happy.

08.01.2022 The clients want to start freshening up their outdoor indoor area so they have started with a new ceiling. We put new ceiling batterns up under the old hardy flex and put the new gyprock and cornice up. With an area of 18m by 3.6m, this is the start of their great entertainment area re do.

08.01.2022 Stud and track walls are all stood at the next vet. Waiting for plumbing and electrical before we come back to finish off

07.01.2022 Another happy client. Just finished this huge living room and also a seperate pool house. All square set. 4.5m high. All ready for sanding.

07.01.2022 Day one of framing for this office fitout.

05.01.2022 This Swan valley house is turning out amazing! 3m ceilings throughout. 450sqm of ceilings. We fully battened it out at 450mm centres, R4 insulation to compliment the double glazed windows and rammed earth walls, this house stays very cool even in this hot weather. Next step is returning at a later date to cornice around the full height tiles and cabinetry.

05.01.2022 A nice high alfresco ceiling got updated this week. At 4m high and many angles, we battened the timbers out with steel top hat at 350mm centres, sheeted, flushed and sanded in two days. Nice clean, straight lines. Clients are very happy. Time to paint!

04.01.2022 Todays job is a 65sqm office suspended grid panel system with insulation. The client wanted it dropped nearly 4 metres down from roof to help cut costs on running the split system a/c and to help with voice and sound echo. They noticed a big improvement with the echo straight away

03.01.2022 A quick and easy one this time. An additional Garage 4.5 by 10m

03.01.2022 Bfore and after of a pool area patio lining with recess for outdoor butane heater and light recesses on either side. With and outdoor shower behind. All done in villa board.

03.01.2022 Finished in Dalwalinu today. We did 350sqm of grid ceiling with R4 Insulation. The walls were done by a different company, but wernt experienced in suspended ceilings so we took the trip to do the ceilings

02.01.2022 We came back to do the cornice on the full height tiles of a job we did a while back. Thought wed put a pic up of the alfresco ceiling now that its finished. A modern touch with shadow line against some nice timber gives a good look. Thanks too Plasterfix Solutions for the hand with the big sheets.

02.01.2022 Such a transformation in just 6 days. Another office fit out. This time in Moora.

02.01.2022 A bit of curved gyrock and shadowline today.

01.01.2022 430sqm of grid ceiling in 3 and a half days. Was tricky working over all the machines, offices and pallats but we managed. And such a huge difference in temperature in this warehouse from start to finish. Especially with this weeks weather.

01.01.2022 At this old office workplace today to make sure this ceiling doesnt fall down. At 4.5m high this could have been a disaster. Sagging over 100mm in spots, we dont know how it was still there. We ran timbers right through with big bugal screws to hold it back up and ran a brand new grid ceiling underneath

Related searches