Australia Free Web Directory

CJ Mobile Fabrication in Thorneside | aircraft & boat



Click/Tap
to load big map

CJ Mobile Fabrication

Locality: Thorneside

Phone: +61 432 441 914



Address: 169 Railway parade 4158 Thorneside, QLD, Australia

Website:

Likes: 84

Reviews

Add review



Tags

Click/Tap
to load big map

22.01.2022 It was a pleasure to work on this hill climbing beast piloted by Sebastian Black, Sebastian has steered this weapon for many years and has several records and trophies. We have fabricated a fresh new tower to tower roll cage and seat mounts. We look forward to seeing him in action in coming weeks at Mt Cotton.



17.01.2022 Fast turn around for this hard working F100, more photos and videos soon...

17.01.2022 Another national spec roll cage completed with a few extra bars for strength and safety. Looking forward to seeing this hot house green SS on the track. Call or message for all your motorsport fabrication needs.

16.01.2022 Lot of fun building this kit boat with a great team of mates, CJ mobile fabrication helped with hotworks and customising the dash to accommodate electronic equipment, we also painted and helped with fitout. Kit is CNC 6.1 walkaround. Excellent to work with.



14.01.2022 Another install of 9 x 200 ubeams and 18 posts in 4 days with a bit of demo work to make it all fit, 1st photo shows the huge master bedroom. We are ready for the next project, motorsport, marine, residential, commercial, industrial. All areas and many different skill sets, roll cages, motorsport fabrication and repairs, bus coach and rv fitout, aluminium, brass, chrome moly, stainless steel welding. Please give us a call to discuss how we can help you with your next project, hope everyone had a fantastic easter with family.

12.01.2022 We are proud to have worked on this Australian motoring classic, and what a beast... sounds so angry, just wants to be unleashed on a track. We fabricated a national spec cage and reinstalled hood lining and windscreen. Can't wait to see it out on track.

12.01.2022 Keeping everyone cooler and safer by re routing muffler and exhaust pipes below deck, exhaust now hides in a insulated enclosure on aft deck and pops up above cabin. Next task will be to insulate engine bay and create more storage for fishing gear.



09.01.2022 Classic brass work to protect the beautiful timbers of a heritage listed building, final weld done onsite after the 2 pieces were fixed to wall. Will go back for final clean and polish after other trades are done.

08.01.2022 We installed the final pieces of brass work to cabinetry last week, it was great to be part of the refurbishment of a few areas of Customs house. Amazed by the level of detail in the stone work and timber trims, definitely worth a visit if your in the cbd. All the best to everybody during theses tough times, and thank you to all our loyal customers for their support. Thanks from Curtis and Jane.

08.01.2022 Handrail modification to comply with current standards, added the Ram horns and created new rail around the down pipes. We worked outside of business hours to not disturb local businesses. Give us a call to discuss your next project.

08.01.2022 We had the pleasure to work in the heart of Redcliffe, fabricating and installing new stainless steel downpipes. Working in such close proximity to the magic of Moreton bay the 316 grade Stainless steel will outlast many other options. Bonus is they look flash and very easy to maintain. Call us for your next project.

07.01.2022 Fresh stock of racetech steel delivered today, 1 3/4 cds, 1 1/2 cds,1 5/8 cr moly, 1 1/2cr moly and cr moly sheet. Give us a call for all your motorsport fabrication needs. Have a great weekend, good luck to all our local teams racing in townsville, Prime motorsports and Steve Hay racing have fun.



03.01.2022 Hope everyone's ready for another exciting year of motorsport, we have been busy over the holiday period getting a couple of cages completed.

03.01.2022 Some biiiggggg posts and beams installed at Gumdale, carport out front is next on the list.

02.01.2022 Some work in progress photos of our current project, improved production Honda Integra in for National spec cage, remove and refit roof skin to delete sunroof and fabricate 2 1/2 inch stainless exhaust system. Cant wait to see it on track. Hope everyone is getting prepared for an uninterrupted 2021 season.

Related searches