Clean Technology Services | Interest
Clean Technology Services
Phone: +61 3 8324 0305
Reviews
to load big map
25.01.2022 CTS recently supplied and Installed 140x285W Panels and 2x15kW Fronius Inverter for a school in Dianella, WA
25.01.2022 Talesun Panels with Huawei Inverter installed in Piarra Waters on 19.05.2018
24.01.2022 Installed in Thornlie on 18/07/2018
24.01.2022 Installed on 4/07/2018
23.01.2022 Installed on 11/12/2017
23.01.2022 Installed on 3/07/2018 48x270W Qcell Panels 10kW Fronius Symo Inverter
21.01.2022 Our Latest Tech Jinko Mono PERC halfcell 315W container has arrived. Time to hurry up
20.01.2022 Installed on 10/07/2018
18.01.2022 Installed on 21/06/2018 Check out our latest EOFY Specials on http://www.cleantechnologyservices.com.au/solar-business/ or call us 0894467474
18.01.2022 CTS recently supplied and Installed 140x285W Panels and 2x15kW Fronius Inverter for a school in Dianella, WA
18.01.2022 Installed in Currambine on 20/07/2018
17.01.2022 Installation on 12/06/2018
17.01.2022 Installed in Eaton on 17/07/2018
17.01.2022 Fronius Primo 5.0-1 system installed on 19/06/2018. The CAT6 data cable connects the inverter to the Fronius Smartmeter installed in the Switchboard.
16.01.2022 Installed on 2/7/2018
15.01.2022 Qcell Qpeak panels with Fronius inveter installed in Baldivis on 23.05.2018
14.01.2022 Talesun Panels and Huawei inverter installed in Harrisdale on 17.05.2018
14.01.2022 Canadian Panels with Fronius inverter installed in Halls Head on 18.05.2018
13.01.2022 Qcell and Fronius system installed in Beechboro on 30.05.2018
13.01.2022 Canadian Panels and Fronius inverter installed in Darling Downs on 22.05.2018
12.01.2022 Installed in Butler on 17/07/2018
11.01.2022 Canadian Panels and Goodwe Inverter installed in Double View on 14.05.2018
11.01.2022 Qcell monocrystalline panels and Fronius Inverter installed on 22/06/2018
10.01.2022 Installed on 29/06/2018
10.01.2022 Installed on 20/06/2018
07.01.2022 Qcell panels with Fronius inverter installed in Marmion on 21.05.2018
07.01.2022 Installed on 5/07/2018
07.01.2022 Huawei Inverter installed on 12/07/2018
06.01.2022 6.6kW System installed on 8/6/2018
06.01.2022 9.9 kW system installed on 18/06/2018 33x300W Qcell QPeak Panels 8.2kW Fronius Inverter
05.01.2022 Installed in Yanchep on 20/07/2018
03.01.2022 Longi mono panels installed on 25/06/2018
02.01.2022 Some Install Photos from August 2018
02.01.2022 Installed 14/06/2018 at Jurien Bay, 2.5 hours from our base.
02.01.2022 Installed on 26/06/2018
01.01.2022 Qcell Panels and Fronius Inverter installed in Lower Chittering on 01/06/2018