Australia Free Web Directory

Combined Sandblasting in Kilsyth, Victoria, Australia | Sandblasting service



Click/Tap
to load big map

Combined Sandblasting

Locality: Kilsyth, Victoria, Australia

Phone: +61 409 436 722



Reviews

Add review



Tags

Click/Tap
to load big map

22.01.2022 Stoked with the how the rebuild on this sandblasting pot come up



21.01.2022 Some sandblast work done on this Cadillac, now ready to get some paint on her

21.01.2022 Structural steel that’s been sandblasted and undercoated

20.01.2022 Sandblasting off epoxy coating for some cutting and welding to be done.



20.01.2022 Sandblasted and ready for some primer,

20.01.2022 Keeping the locals happy with sandblasting this F150 chassis for a restoration project. Now ready for some paint,

19.01.2022 Internal space work. Before and after photos of being sandblasted and spray painted.



16.01.2022 What an amazing finish on this custom tray, full sandblast and spray paint to match the Ute. Built by @jessepolky

16.01.2022 Steps and hand rail sandblasted and painted.

15.01.2022 John Deere green hay trailer, Full sandblast and paint

14.01.2022 High pressure wash and then spray paint

14.01.2022 Old farming equipment in for a sandblast and re spray



13.01.2022 Fresh sandblast and paint

13.01.2022 Sandblast and paint on these pole guides.

12.01.2022 Old diesel tank now looking new again with a sandblast and paint

11.01.2022 This jack up barge is starting to come together. Full sandblast and spray paint inside and out on each pontoon. What a great project this has been. Not to long and she will be back in the water.

10.01.2022 New paint job, like new again.

09.01.2022 A few before and after photos of inside a barge,, full sandblast and paint.

07.01.2022 Sandblasted to remove the old concrete build up and rust now ready for some undercoat

06.01.2022 Great job from the boys this week getting these tuff jobs done

05.01.2022 Box beam section off the jack up barge complete with a sandblast and spray paint.

04.01.2022 Business cards finally here

02.01.2022 Barge complete, now loading her back into the water

01.01.2022 Sandblast and re spray on some bases for this sign

01.01.2022 Couple before and after shots of this roof spray,

Related searches