Australia Free Web Directory

Complete Feet Podiatry in Hornsby, New South Wales | Doctor



Click/Tap
to load big map

Complete Feet Podiatry

Locality: Hornsby, New South Wales

Phone: +61 2 9477 7277



Address: 87 Burdett St 2077 Hornsby, NSW, Australia

Website: http://www.completefeetpodiatry.com.au/

Likes: 123

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Late night after work, making the last of the benches for our orthotic room.



23.01.2022 I have finally finished the coffee table for the waiting room. This took forever but I think the result speaks for itself. You cant buy stuff like this. It is made out of claret ash that used to be in he car park but died a few years ago. This is the result of slabbing the trunk, seasoning the timber and then making it. Very satisfying to do the whole process from removing a tree (that was dying) and recycling it completely. Timber amazes me.

22.01.2022 We finally have power connected today.

21.01.2022 Well renovations have started. It has taken a while to get going and I appologise for any inconvenience to all our patients. Thankyou for your patience. We should be finished by xmas. Thankyou Peter



21.01.2022 Our new fume extraction for the orthotics room. The bench is made from the original Oregon roof beams, 100 years old. Biscuit jointed and sanded.

16.01.2022 Well upstairs is underway, and it is starting to take shape.

15.01.2022 We are practising now but still fitting out. Im still making benches, etc. This is the next phase of our workshop.



13.01.2022 I have finally finished thicknessing, now for joining. This is the first bench.

13.01.2022 It's been a while but we are getting close.maybe four weeks till me move back. The shipping container left the site today. We are so close.

11.01.2022 Todays job, setting in place the steel reinforcing for the concrete. Hopefully concreting on Thursday.

10.01.2022 We have our occupation certificate, so we can move in this weekend.

10.01.2022 You can now see some structure starting to be formed.



10.01.2022 Almost ready to move in. Thanks kezza, jimbo, Matt, Nicole, aldyth and Simon for all your help yesterday. The garden looks great.

09.01.2022 Getting very close to finishing three weeks to go. Hand rails around the entrance ramp finished today.

06.01.2022 Since I have so much spare time, I have decided to make the benches for the orthotic room out of the 100 year old Oregon roof trusses. Recycling. So I spent the weekend pulling nails, and thicknessing the timber.

05.01.2022 Getting closer. The automatic door is fantastic. Thanks Mark Caldwell for your input. We move in the weekend after Easter.

03.01.2022 Concrete footings are in today, 7 truck loads of concrete. 13 pallets of bricks arrive tomorrow. Its great to start seeing things being built, not just demolished. I do love solid foundations though. Most important part of the build and you dont see it.

03.01.2022 Its been a while but we are getting close.maybe four weeks till me move back. The shipping container left the site today. We are so close.

02.01.2022 We are practising now but still fitting out. I'm still making benches, etc. This is the next phase of our workshop.

02.01.2022 Well the roof is coming off, and now for the first time building is happening. Brick laying has started.

Related searches