23.01.2022 Another asbestos pit removed and plastic pit installed.
22.01.2022 120 metre trench and communications conduit installed to a sports field in thorneside. All done using our 4000litre vacuum excavation unit No damage to irrigation and other underground pipes Minimal damage to the turf No cutting concrete to pass under footpaths
22.01.2022 Digging deep in Kenmore this morning! 2metre deep pothole to locate an existing 1600mm water main and some vac trenching around power to link into a pit #vacuumtruck #assetlocation #hydroexcavation
21.01.2022 Digging shale over at east Brisbane for a 800mmx1.5m electrical trench Need a machine? Call us today 1.8t-4.5t machines available, closed cab line/council spec. #rock #excavator #brisbaneexcavations #utilitycontractor #bobcat #e35 @ Churchie
17.01.2022 Repairing a damaged Telstra pit and footpath panel, water, comms and gas lines all under this slab. Safely excavated used our 3800litre #vacuumtruck available for wet hire 24 hours. @ Carina
15.01.2022 Another new network conduit in and done on one of our projects with Downer Utilities.
11.01.2022 Our 4000litre unit out at laidley sucking ropes through conduits for a new fibre cable
11.01.2022 Exposed aggregate footpath cut and replaced for a new communications service into a building. All works carried out overnight due to traffic volumes on the main road. #vacuumexcavation #concretesawing
07.01.2022 Our latest project up at moorina is nearly wrapped up. 1200m of new pipe layed in some hard rock and shale, 9 asbestos pits upgraded to PVC, 2500m of fibre hauled and another 2200m to go in next week.
06.01.2022 Welcome to the team. Available now for hire, shoot us a message or call 1300 209 412 for some wicked rates #yanmar #vio45 #brisbaneexcavators #brisbaneexcavatorhire
03.01.2022 Communications conduit repair for a customer at Burpengary. After being called out for a blocked conduit we attempted to flush the conduit using high pressure water. Proving unsuccessful and digging a new conduit in not an option due to concrete and disruption to business we located the blockage, removed a 1metre square of concrete and replaced a section of pipe using our vacuum excavator. No wonder the jet rodder couldn’t clear this one! New conduit dug under the slab each way and broken section replaced and the 100metre conduit run was ready for action again!
03.01.2022 55m new communications trench in Bowen hills and new fibre optic connection to a new home. 49mPa rock excavated used a breaker and our Komatsu pc18 due to the narrow work area. All work completed and reinstated in 2 days, not a bad result