Australia Free Web Directory

Cross Diesel Services and Line Boring Repairs in Lonsdale | Vehicle glass service



Click/Tap
to load big map

Cross Diesel Services and Line Boring Repairs

Locality: Lonsdale

Phone: +61 424 960 470



Address: 25 sommerset Circuit 5160 Lonsdale, SA, Australia

Website: http://lineboringservices.com.au

Likes: 181

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Fresh set of tracks, 2000hr service and bucket repairs for this TL12



25.01.2022 2000 kms traveled, 18 bores machined, 40 degree heat. Was a solid week on the Line Borer but a happy customer

24.01.2022 Australian day fun

23.01.2022 On the big stuff today..



23.01.2022 The boys getting it done today. A40E engine change out

23.01.2022 Rear wheel bearing and duo cone change out

23.01.2022 CAT C12 in chassis rebuild to kick off 2020



22.01.2022 623G scraper hitch complete re-build

22.01.2022 Saturday morning fun

21.01.2022 What a day for servicing...

21.01.2022 Good day for a workshop service

21.01.2022 It’s not every day you watch a stadium get demolished. PC1250 dipper arm repairs on-site at footy park



20.01.2022 Dual line boring happening today!

20.01.2022 CAT 950 Articulation and trunnion rebuild. One machine out another one in!

19.01.2022 A bit of an easier end to a big week. Volvo A30 radiator change out

19.01.2022 CAT 992k bucket. Solid few days

19.01.2022 Cross Diesel Services have just added a dedicated field service lube trailer to the fleet which will allow us to carry out on-site servicing to all makes and models of heavy earthmoving equipment. This new addition will allow us to carry out services more efficiently which will reduce machine down time. Give us a call for a quote on 0424 960 470

18.01.2022 A routine service on a CAT 972 loader found that the articulation driveshaft had excessive wear causing damage to both yokes. A new driveshaft, centre bearing and yokes were fitted before a failure was going to occur. Quick turn around on parts drastically reduced machine downtime

18.01.2022 Komatsu WA900 rear trunnion repair up North. CDS carried out the line boring as well as the removal and refit

15.01.2022 Performing a series of diagnostic tests to this CAT D8. Handy when you have the right tools for the job

15.01.2022 Line boring to a pulveriser built to assist with concrete crushing at AAMI stadium. Big set of jaws!

15.01.2022 New CDS field service Ute up and running

15.01.2022 ID welding in motion

14.01.2022 CAT 950H trans and torque converter re-build. Using a mix of genuine and non-genuine parts keeping the cost down for the customer. Good job to finish off a Friday

14.01.2022 Good day for it. Blown hose replacement and fault finding out in the slush

14.01.2022 A Few jobs carried out over the last month or so. Komatsu PC1250 line boring, CAT 992 boom repairs, EC700 front end re-build, CAT 15 in chassis re-build, WA900 repairs. It’s been a busy period!

14.01.2022 Mini digger day today

13.01.2022 Called to site to investigate engine power loss and miss firing in an articulated dump truck. After a few diagnostic tests, a simple crankshaft sensor was the cause and a quick change out ensured the machine was back to work the same day

13.01.2022 WA 900 rear trunnion repairs up in Whyalla. Done many of these over the years

12.01.2022 Another crusher done and dusted

11.01.2022 Hitachi EX1900 stick repairs to finish the week off

11.01.2022 A little bit of Sunday fun

11.01.2022 EC700 digger repairs for a Wednesday. Bucket, hand rails, steps all re-fitted after being delivered to site

10.01.2022 CAT 631E transmission rebuild. Dedicated component rebuild section ensuring quality repairs

10.01.2022 Straight into it for 2019. CAT 623G total hitch re-build

10.01.2022 New welder prepped and ready to go!

09.01.2022 Liebherr Grab rebuild. Was very very tired but after a heap of line boring and replacement parts it’s better than a new one!

09.01.2022 Volvo A40E transmission change out

09.01.2022 Was a big week with the line borer. 28 holes in total repaired on a CAT D9T

09.01.2022 PC 600 bucket repaired and ready to go

08.01.2022 988H articulation at Kanmantoo. Thankful for the overhead crane!

08.01.2022 Rear diff input seal replacement

07.01.2022 All in a days work. The big lumps first!

07.01.2022 Nice job heading Into the Christmas break

06.01.2022 Solid weeks work line boring a CAT 992K articulation. Big job but happy with the finish

06.01.2022 Hitachi EX2600 stick repairs in Whyalla. The photos below capture the process carried out and the quality of line boring repairs we deliver. We can repair bores from 40mm to 400mm

05.01.2022 Cracking Day for it

05.01.2022 Tricky little line boring job to kick the week off. Hitachi ZX670 boom cylinder mounting bores

05.01.2022 5 new accumulators for this Dump truck followed up by pressure checks to ensure efficient braking

05.01.2022 When a simple job turns out to be not so simple CAT 972H tilt cylinder removal

04.01.2022 Line boring, pin and bush replacement tightening this Sumitomo front end up

04.01.2022 Saturday morning fun!

04.01.2022 Freshly machined EX1900 bucket links. Much cheaper alternative that purchasing new

04.01.2022 772CH grader wheel seal. Good Friday arvo job with quick turnaround

03.01.2022 Volvo trans rebuild and front end repairs

03.01.2022 Bit happening here today!

03.01.2022 Cross diesel services is actively looking for a qualified heavy equipment fitter to assist with increased workshop and field service demands Successful applicant must be reliable, hard worker, willing to grow and have a range of knowledge on all earthmoving equipment ... Above industry rates and potentially a vehicle depending on the experience of the successful applicant Please contact Daniel on 0424 960 470 to discuss further if interested

03.01.2022 Hitachi ZX350 stick re-build Like a new one!

03.01.2022 ID welding. Nothing too big or small

02.01.2022 Volvo A35E wheel seal replacement and brake re-build to finish the week off

01.01.2022 CAT 972H lift cylinder re-seal carried out on-site reducing time and travel costs to transport the cylinder back to the workshop

01.01.2022 Roadside breakdowns

Related searches