25.01.2022 Project update! We were awarded the concrete package in December 2020 for the new Endeavour Hills Specialist School, 8000m2 of structural ground slabs. 3 slabs have been poured, 4 to go great effort from all the team at DBCC



25.01.2022 Come Tigers, we've been here before and can do it again

24.01.2022 ~ Project Update ~ The steel fixing for level 3 at Saint Ignatius is well underway by DBCC. With most of the forming and fixing done by us, we're chugging along well with the admin building.

23.01.2022 One of Debono Bros biggest projects to date, Iona College is a three level building with its purpose being to teach years 7-10. The project was completed alongside CICG almost a year ago. Having only opened this year, DBCC have spent more time at Iona College than the school's first cohort will this year. Hopefully it'll be a different case in 2021.



22.01.2022 ~Project update~ Bellfield Basement poured before the long weekend and we see the tigers win the flag back to back. Ready for ground floor formwork after the break!

21.01.2022 ~ Project Update ~ St Ignatius College, 12 meter high concrete columns pour down at drysdale today, well done guys.

20.01.2022 Completed last year, DBCC constructed two new buildings for St Ignatius College. A new year 9 building as well as a new gym meant that we had to pour for a 1,200m and 2,400m footprint, respectively. This job was undertaken with CICG as the principal contractor and now DBCC has found itself back at St Ignatius doing a new admin building under Lyons Construction.



17.01.2022 New Project | DBCC started this new concrete structure package this week and the team is excited to have been selected to complete these works

16.01.2022 DBCC finished it's work on the Parkwest industrial facility in June of this year. Once this project is completed by Kane Constructions, this project will have various industrial capabilities and uses for its patrons. The intricate scaffolding for works on the insitu walls required DBCC to maintain a major focus on safety and consistency to ensure that the walls were constructed to the highest of standards

15.01.2022 Final Pour today down at St Ignastius College Drysdale, Thanks to all our team involved and thanks to Lyons constructions for allowing us to work along side them to complete this structure

14.01.2022 Completed earlier this year, Macpherson Park Pavilion was a major redevelopment for Macpherson Park in Toolern Vale. This job required DBCC under Lloyd Group to complete the structural concrete for this two-storey building. Situated just outside of Melton, this project will provide a space for the local footy and netball team as well as space for functions/celebrations.

14.01.2022 About 2 months ago, Debono Bros completed the 8 structural concrete slabs that were part of a subcontract bundle with Kane Constructions. This job consisted of two separate VSBA schools in the new suburbs of Rockbank and Merrifield. The similarities between the two sites allowed us to evenly distribute our time, effort and knowledge. This distribution was key to keeping us on schedule to install the 8,000 square metres of concrete on both sites. With each new challenge on each site helping us to find effective solutions which would then carry over to the other site.



09.01.2022 ~ Project Update ~ We've completed the formwork for Level 2 of Saint Ignatius' admin building. Level 3, here we come.

08.01.2022 Come Tigers, we've been here before and can do it again

07.01.2022 We are excited to announce we have been awarded the structural concrete package for Iona College Geelong. Iona College Geelong Stage 2B & 3 involves the construction of two brand new buildings an innovative Specialist Learning Building and a state-of-the-art Sports Hall. This is a special project for our team as we completed stage one in 2019... Client: Lyons Construction

06.01.2022 We are excited to announce in december 2020 we were awarded the structural concrete package for the Assumption College Kilmore (The footy Factory) Assumption college involves the construction of brand new building an innovative Sports centre along with new grandstand seating. Client: 2 Construct

06.01.2022 ~Project update~ Bellfieild Basement poured before the long weekend and we see the tigers win the flag back to back. Ready for ground floor formwork after the break!

01.01.2022 As strong advocates for mental health awareness in the construction industry and a proud supporter of Beyond Blue, Debono Bros took part in Men's Mental Health Week back in June. Through our efforts, we raised $3,542 for Beyond Blue. These proceeds will aid in the support of Australians struggling with their mental health. We are proud of our efforts and look forward to helping support people doing it tough in the future! To anyone reading who isn't doing their best, remembe...r that you are not alone. We all feel down at times but we're in this together. Reaching out to friends, family and professionals about how you feel can make a problem less of burden. And if you need any resources, check out Beyond Blue. https://www.beyondblue.org.au/ See more