Australia Free Web Directory

D&G Building Group in Kellyville, New South Wales | Construction company



Click/Tap
to load big map

D&G Building Group

Locality: Kellyville, New South Wales

Phone: +61 410 257 864



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Dural job from 2 weeks ago, waiting for professional photos but thought was to good not to share. Clients asked for 180x22 spotted gum flooring we also re made handrails, balustrades and custom skirting for post.



25.01.2022 Who else is ready for the weekend? Shot from wedderburn job @kel.bush

24.01.2022 Completed bathroom at manly

24.01.2022 Rustic barn style doors made today at wedderburn, on a outdoor entertaining area we built last year for one of our favorite clients. They had recently installed screens around to enclose the structure and these door were the finishing touch #barndoors #hardwood #rustic #carpentry #outdoorliving #ironbark



23.01.2022 D&G trusty stead #isuzu #workhouse

23.01.2022 Recently completed bathroom in north Richmond some before and after pictures. Building works - @dgbuilding.group plumbing - @grhplumbinggroup tiling - @spanoandco electrical - @daily_dave7

23.01.2022 Before and after picture. Installed new stacked door, axon cladding and trims



21.01.2022 Glenhaven facelift- new stria cladding, new windows, timber trims, front door and side light

21.01.2022 Steel beam installed and wall removed earlier in the week to make way for the new kitchen coming.

20.01.2022 Deck frame and exposed pergola completed at Riverstone.

20.01.2022 Recently finished job at Dural deck, balustrades and skirting all done by us #spottedgum #outdoorliving #deck #pond #carpentry #builder #custom

19.01.2022 Winter is here, why not warm up with new fireplace installed by us #fireplace #building #customfireplace #construction #interiordesign #buildingdesign



18.01.2022 Marrackville re roof in full swing. Roof stripped, all additional structural works completed to engineers specs and we are ready for tiles next week. #reroofing

18.01.2022 Hardwood gates installed at dural this morning

17.01.2022 An ongoing job getting this place ready to be rented out. We have changed all windows, external arcs, handrails, decking down sides of existing deck, new doors, internal skirting and arcs the list goes on. Cant wait to see this place all painted with stainless cabling yet to be installed

16.01.2022 Bathroom/laundry and outdoor bbq complete with paint to come at Randwick.

16.01.2022 Recently completed insurance job for Dak-Wal constructions replacing this polycarbonate roof which was damaged by hail

16.01.2022 Gas fireplace finished with v-joint lining boards

16.01.2022 Hardie deck all painted, cover strips in and stainless cabling installed! @james_hardie

15.01.2022 Now hiring! Looking for 1-2 year apprentice please contact Dylan on 0410257864

14.01.2022 Pymble fireplace almost complete with paint to come. Joinery completed by @attardkitchens electrical competed by @daily_dave7 building works completed by us

14.01.2022 Custom made gates fabricated on-site cladded with 90x18mm merbau #gates #merbau #fabrication #carpentry

13.01.2022 Recently completed bathroom at manly. We reconfigure this one moving all the services around to maximum the space. #manly#bathroomdesign#bathroom #bathroomdecor#carpentry#bathroominspo#interiordesign

12.01.2022 Another load bearing wall removed and steel beam installed. Couple before and after pictures.

12.01.2022 Manly ethanol fireplace all complete ready for winter! Designed by Fiona from interior connections.

11.01.2022 Completed exposed merbau pergola with merbau handrails and balustrades.

11.01.2022 Windsor bathroom nearly complete! ready for paint and shower screen to be install!

09.01.2022 Our very first wedi bathroom installed. @wedi_australia

08.01.2022 Completed pergola over newly installed pizza oven

08.01.2022 Parking was tight onsite today!

07.01.2022 New custom made cedar door installed at manly. Before and after photo.

06.01.2022 Some repair work today, to bring these gables back to life!

05.01.2022 Curved ceiling finished off at dural for a clients wine cellar #gotcurves #winecellar #dungeon

04.01.2022 New stacker door installed to make this outside space more useable and lets more light in!

03.01.2022 1200 front door with side light installed today at our bella vista job

02.01.2022 Hardie deck installed now ready for paint and stainless cabling @jameshardieau #jameshardie #hardiedeck #decking #

02.01.2022 Built this beauty last year and its our favourite one to date!

Related searches