Australia Free Web Directory

Disturbed Fabrications | Product/service



Click/Tap
to load big map

Disturbed Fabrications

Phone: +61 405 128 627



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Back wall under way. Top edges of tub welded in.



23.01.2022 All welded up. Taken away for prep and paint of rear bar and sliders.

23.01.2022 Steel winch tube bar. All finished and off to get painted.

23.01.2022 It's been a long haul helping with this rig. Ground up restoration completed. Converted from 22r petrol to 2.8 turbo diesel. Custom made steel tray with lockboxes. Everything painted in raptor liner.



22.01.2022 Stainless cup holders and pouch for phone/ wallet. Ashtray lid opens perfectly against it.

19.01.2022 Ranger going out with new barwork today.

18.01.2022 Stripped out for the chop.



18.01.2022 Gu sliders rolling out this arvo.

13.01.2022 Quick set of scrub rails.

13.01.2022 Nearly there with the chop.

12.01.2022 Raw sliders ready for raptor liner.

09.01.2022 Quarter chop complete. Plate rear bar and sliders coming soon.



07.01.2022 Toolbox framework and sheets made. And guards all ground down.

06.01.2022 79 series side steps and scrub rails. Also put on 3 new aerial mounts. Off to the powdercoaters now.

06.01.2022 Bullbar all finished after being painted by customer. Looks great.

04.01.2022 Bit of an upgrade for this rig. Out with the old. In with the new.

04.01.2022 Whoops. Grinder slipped.

03.01.2022 Bare metal in primer. Tool boxes have locks. Interior back wall finished. Wiring run throughout. Most of interior back in.

02.01.2022 Barn doors complete and tool boxes sheeted.

01.01.2022 Plate steel rear bar ready for a full weld and grind.

01.01.2022 Winch bullbar in the works.

Related searches