DLB Industries Pty Ltd in Whittlesea, Victoria | Industrial company
DLB Industries Pty Ltd
Locality: Whittlesea, Victoria
Phone: +61 422 097 845
Address: 2190 Plenty Rd 3757 Whittlesea, VIC, Australia
Website: http://www.dlbindustries.com.au/
Likes: 242
Reviews
to load big map
24.01.2022 Resprayed this old tractor front end loader kit in carboline 2k industrial polyurethane. #masseyferguson #carboline #devilbiss
23.01.2022 Column erection! 86 columns on ground floor are in. Next, install 1st floor beams! Reservoir, VIC
23.01.2022 Foundation Retention Struts Supplied and Installed. Collingwood
23.01.2022 Weeeeeeee...... Keep watching.....12m high tower we demolished and disassembled
23.01.2022 Look at our steel works! Taken really well by the City of Whitehorse.
21.01.2022 Manufactured and installed this street canopy. Shop drawings done in house. Church St, Richmond #cigweld #carboline
19.01.2022 Big day for my boys today! Structural steel install #welding #fabrication #steel #crane
18.01.2022 Rebuilding this Mazda B6 engine. Were rebuilding this car from the ground up.
18.01.2022 @worxxcarpentry working hard framing and spanning around our steel. Truly is a monstrous job. Triple story unit complex. Almost ready for the second level! Broadway, Reservoir #melbournetradies #steel #structuralengineering #aussiemanufacturing
17.01.2022 Posis installed in our structural steel. Soon time to go up another level! #structuralengineering #steel
17.01.2022 Manufactured and installed this disabled ramp and handrails. All hot dipped galvanised.
17.01.2022 Enjoying some sun here in Melbourne. Building a custom tray for a Kenworth Cab Over #kenworth #trucks #steel #fabrication #engineering
16.01.2022 Some custom made park furniture. Made from the ground up! Galvanised frame and merbau boards. #furniture #steel #galvanized #merbau
15.01.2022 Boxing in chassis rails for a 34 Dodge pickup. Lots of mods for this bad boy. 350 chev, Turbo 400 and a 12 bolt diff. Plus many suspension upgrades!!! #hotrod #custom #cars
15.01.2022 Started to install the steel today! 4 unit, triple storey development. Approximately 32 tons of steel will go in!
14.01.2022 Another modification done! Dipper arm pivot seems to be taking the brunt of the load these days. We re-welded it and fabbed up a strengthening plate on the other side. She sure wont let down her owner again @dirtmonkeyexcavations
14.01.2022 Side project. Re-engineering/rebuilding this 1934 Dodge Pickup Chassis. It will have a coil sprung front end, 350 chev, Turbo 400 auto and a shortened Salisbury diff. These mods will be road legal!
13.01.2022 Crane lift! 3 storey industrial screen going in! More to come! Courtney St, North Melbourne #steel #structuralsteel #structuralengineering #galvanized @teambuildingconstruction
13.01.2022 Doing some prep to build a new post and rail fence and automated gate entrance!
13.01.2022 Steel is in! 9.25 meters tall! More to come. Courtney St, North Melbourne
13.01.2022 Canopy is done and dusted! #structuralengineering #steel #galvanized
12.01.2022 A new utility garage which we fabricated and installed for our friends at Landcare Property Maintenance. #sheds #steel #colorbondsteel
11.01.2022 Carports we manufactured and installed. Kangaroo Rd, Hughesdale #steel #structuralsteel #structuralengineering #welding
11.01.2022 Finished product! Our steep pitched rooves and structural steel have been cladded! #structural engineering #steel #welding #structural steel
10.01.2022 Welded bracing in all day today. This a portal frame steel structure. All up this project will take 35 tons of steel. One more storey of steel and we are done. Broadway, Reservoir #structuralengineering #steel #australiansteel #australianmade #structuralsteel
10.01.2022 Manufactured and Installed these temporary struts for @brconstructiongroup. #cigweld #structuralengineering. Percy St, Prahran
10.01.2022 Installed these brick lintels, removed brickwork then manufactured and installed these little jail cells after the meters were installed. Waratah Place, CBD, Melbourne
09.01.2022 Didnt know the camera was on! Cafe racer work.. Welding in custom seat brackets! #honda #cigweld #cb250f
09.01.2022 Progress! Courtney St, North Melbourne @teambuildingconstruction #melbournetradies #structuralengineering #steel
09.01.2022 We are finished! Call us for custom outdoor furniture. Perfect for schools, wineries, parks and much more #seating #steel #tablesetting #furniture #merbau #outdoors
08.01.2022 Two floors up!!! On the way up at Broadway, Reservoir #structuralengineering #steel #welding #structuralsteel #units #construction @jarmsconstructions1
08.01.2022 Manufactured and started to install these crank columns today. We've fully designed and engineered this canopy. We also excavated and poured its footings! More to come! #steel #structuralsteel #engineering #engineeredandfabricated
07.01.2022 Structural retention installation was smooth as silk. Waler beams and struts installed for @brconstructiongroup for @kapitolgroup Sydney Rd, Brunswick #steel #australiansteel #cigweld #structuralengineering
07.01.2022 Change of tune! Frame modification on this Honda cafe racer #motorcycle #engineeredandfabricated #engineering #honda #cigweld
06.01.2022 Fabricated and installed this sign frame at TLC Sunlight for Orion Builders
06.01.2022 We are just about done here! Last crane lift! Some weld in bracing to go in next week and then we have officially completed this project. Broadway, Reservoir #structuralengineering #steel #welding #construction @jarmsconstructions1 @worxxcarpentry
06.01.2022 Purlins on. Roofers ready to clad!
05.01.2022 Another productive day with the crane! Broadway, Reservoir #steelwork #structuralengineering #fein #cigweld #libertysteel #bubblecrane #milwaukeetools
05.01.2022 Driving in some fence posts! #lyco #munroengineering #australianmade #masseyferguson
05.01.2022 Plasma cutting 90 year old rivets and bolts off this 34 Dodge Pickup Chassis. #thermadyne
04.01.2022 Beams up! Do you want larger living rooms? Give us a call
04.01.2022 Re welded and reinforced this 15ton excavator arm. It was peeled open like a can but now ready to go back to work #cigprofessional #cigweld #excavator #modification #engineering
02.01.2022 New trolley bay. Manufactured, dipped and installed!
Related searches
- Fiona Lunn Coaching
Businesses Local service Business service Personal coach Coach
+61 418 982 392
100 likes
- Kazza’z klean’z
Property Business service Cleaning service
+61 432 972 950
Bonner 2914 Canberra, ACT, Australia
83 likes
- Home Heart and Happiness
Businesses Local service Business service Personal coach Personal blog Cooking school
+61 415 854 565
731 likes
- stagbuildingdesign
Businesses Local service Business service Architectural designer Designer
+61 418 169 481
13 likes