Australia Free Web Directory

DOLECH ENGINEERING in Emerald, Queensland | Metal fabricator



Click/Tap
to load big map

DOLECH ENGINEERING

Locality: Emerald, Queensland

Phone: +61 408 704 425



Address: Lot 1 shed 14 corner of Douglas & Powell Streets. 4720 Emerald, QLD, Australia

Website:

Likes: 302

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Track frame rebuilds on pc220



25.01.2022 Custom Aluminium bait board

24.01.2022 Bucket rebuild with wear package

24.01.2022 So we have been doing some decent repairs the last couple of weeks



24.01.2022 Full Aluminium diesel tank welded & pressure tested.

22.01.2022 Access steps to a verandah

21.01.2022 Large flatbed trailer fabricated with quality all Australian made parts & labour.



21.01.2022 Due to covid 19 regulations we only want 1 customer at the work premises at any time. If you arrive & there is somebody here please wait inside your vehicle until they have returned to their vehicle. "PLEASE DO NOT ENTER OUR WORKSHOP - WAIT OUTSIDE the roller door

19.01.2022 Bucket & Quick hitch rebuild/ new pins /bushes & rebore all done in-house.

17.01.2022 WE ARE OPEN FOR BUSINESS! G’day Everyone, we hope all our valued customers are all staying Covid safe. We are also letting everyone know that we are open for business even though lots are saying we are not there anymore. There was some turmoil caused in recent times which required us to have a cleanup. If we are not at the workshop we are onsite & only a phone call away.... Give us a call or leave a message & we will always contact you when it’s convenient See more

17.01.2022 Internal shelving on existing Aluminium canopy

16.01.2022 Full Floor replacement in refrigeration truck.



15.01.2022 Pipe work &pump installation

13.01.2022 Out with the old in with the new

12.01.2022 Cat Grader front cowling repaired like new.

12.01.2022 Trailer repairs

12.01.2022 Safety handrail fabrication & installation

11.01.2022 C13 Cat sump repair As usual the wait on parts from other countries is annoying. (Before & after shots)

11.01.2022 Fuel trailer suspension upgrade & rebuild

10.01.2022 2 down........ 4 to go #aluminiumwelding

08.01.2022 Always good to enlisted good help when your under the pump & need a hand.

08.01.2022 Bucket modifications. Remove old hitch & fabricate new clevises,pins,bushes to fit different machines. A coat of durable hard wearing colour doesn’t go a stray either.

07.01.2022 Installation of new ball joints to Cat grader

04.01.2022 Repair & machining of damaged Aluminium machine housings

03.01.2022 Broken transfer case rebuild. This was a very time consuming repair due to inferior & heavily oil impregnating of the cast Aluminium.

02.01.2022 Repairs to Holden sandman panelvan fuel tank.

02.01.2022 Access platform fabrication & install to water level reporting station.

Related searches