Australia Free Web Directory

Eastern Hills Outdoors in Midland, Western | Home improvement



Click/Tap
to load big map

Eastern Hills Outdoors

Locality: Midland, Western

Phone: +61 8 9274 0979



Address: 14 Lefroy Ave 6056 Midland, WA, Australia

Website: http://www.easternhillsoutdoors.com.au

Likes: 658

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Custom gable patio in Swanview. This build is a little different. We have tied the design of the patio in to the house with running house fascia and gutter. Its the small touches that make the difference Better photos coming tomorrow once the flashing are on.



25.01.2022 Beautiful jarrah deck in glen Forrest started last week. Looking great so far. A small lined patio on the deck plus a monster lined patio on the house Well done to vwarne and jason for working through the hot weather to complete the last project for the year Stay tuned lots more to come

24.01.2022 Built these garrison spear gates over the Australia day long weekend for our registered builder. Off to the powder coaters. Stay tuned for the install

24.01.2022 Art studio update Its amazing what a bit of clear glass can do to make it feel and look so good. What do you think? Another big change coming next week when the gyprock goes in.



21.01.2022 We were fortunate enough to be asked back to quote on another project for the lovely couple that are the proud owner of this project that we built for them over a year ago which included the patio, deck and ballastrade.

20.01.2022 Check this out. Not just a slap it up carport. Once the blue board is rendered and the door is on you wouldnt tell its not part of the original house. At EHO we strive to make any addition feel like it was always ment to be there not just tacked on.

20.01.2022 An Eastern hills outdoors first. A one of a kind insulated panel skylight during the day Then the skylight comes alive at night as super bright hidden lighting. Whats your thoughts



20.01.2022 Games room and insulated gable patio update Gable frames up for the patio and room Really looking good now.

20.01.2022 Merry Christmas from the team at EHO

19.01.2022 Art studio update Dropped in to see the progress of the painting and the timber floor this afternoon. I was so impressed with the transformation. Small amount of finishing touches to go Tell me what you think

18.01.2022 Custom gable patio in Swanview update. All flashings on and looking fantastic.

18.01.2022 Have a look at this fantastic example of a EHO patio. 10m wide x 6m deep insulated panel with solar frost gable end infills all the way in Beverley.



18.01.2022 Games room and insulated gable patio started today. First section of the concrete down. Wall frames up. Tomorrow patio frame and the rest of the games room frame... Stay tuned for more updates

17.01.2022 Art studio update What a busy day Ceiling battens up... Front wall fully sheeted Front windows cut out Balustrade wire holes all drilled Bridge floor down All left overs and rubbish removed Back to the hybrid shed build with my number 1 builder Vwarne. More to come stay tuned

16.01.2022 Nice big gable and skillion patio in Bakers hill.

16.01.2022 9m x 4.5 insulated flat patio with risers built in Karragullan last week including two fans with lights thanks to Keiran @ Thomson electrical

15.01.2022 Nearly completed in midvale for a repeat customer Fantastic L shapped granny flat designed to fit very snugly into its new home. Gyprock went on today. Plumbing and electrical next plus the clients will be painting and fitting there own kitchen. Going to look great.

15.01.2022 We braved the thunder and lightning today to start installing this fantastic insulated gable patio in Glen Forrest. This patio features one of a kind EHO twin wall skylights, pressed steel louvres and another little something that we will reveal after the long weekend. Stay tuned

14.01.2022 Games room and insulated gable patio update Roof 70% done Walls done Sparky friday... Gyprock wednesday. Looking good. See more

14.01.2022 Garrison gates are hung now for the motors.

14.01.2022 Side access gate. Steel frame with aluminum slates in Viveash

12.01.2022 3 x 6 gable garage. Supplied installed including earth works and concrete in High Wycombe

11.01.2022 Portico build Something different. Front pyramid portico built to be a proper addition to the house instead of a standard patio. Once the rendering is done by the client we will update.... Many thanks to Adam Kirkham for the supply and installation of the aqua check ceiling See more

10.01.2022 Art studio update 130lm stainless wire installed Window frames delivered Main door frame fitted Door to be finished tomorrow plus toilet door and frame Stay tuned more to come

09.01.2022 Another nice insulated gable patio in beechboro

09.01.2022 Nice big shed built in parkerville

08.01.2022 Art studio update Roof and walls flashed Door in and locked. Stay tuned more to come

06.01.2022 We started standing frames in the rain today for a granny flat in Bassendean. We have done everything from earth works through to plumbing, electrical and concrete so far( with a little help from Divearse earthmoving, AJL plumbing, Thomson electrical, C and N Williams concreting and CMI for the supply of the frame work. Lots more to come. Stay tuned

06.01.2022 EHO patio relocation and new installation This week we removed and rebuilt an old gable patio plus installed a beautiful new insulated skillion patio. Looks so much better

03.01.2022 At the footy with the boys. Leigh Scott and Vwarne Williams. Thanks to Metroll

02.01.2022 Beautiful jarrah deck in Glen Forrest. Lined patio to go. Stay tuned

02.01.2022 Massive skillion alfrescos. All gyprocked just waiting for paint. The backyard has been transformed in a big way. Again not just a slap em up patio but a quality extension of the home

02.01.2022 Art studio update: - All walls have been gyprocked and painting has started. - Hand rails and stainless wire in. - Retaining wall panels started going in. The clay oh my god has been the worst i have worked in. -Couple of small things to go and then we are all done and then the art can begin

01.01.2022 Massive 17m x 6 reverse flat built a couple of weeks ago in middle swan

01.01.2022 Smart looking garage in the vines built a few weeks ago

01.01.2022 Art studio update Window frames are on. Glazing on friday then gyprock.

Related searches