Australia Free Web Directory

Eight 3 Constructions Pty Ltd in Wavell Heights | Construction company



Click/Tap
to load big map

Eight 3 Constructions Pty Ltd

Locality: Wavell Heights



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Office for dV Property Group sorted in time for the new year #wavellheights #realestate #propertymanagement #endof2018



23.01.2022 Getting down the grey! Concrete section of the ground floor down. All of the work under this which cant be seen! #concretefloors #wavellheights #brisbanebuilder #groundworks #frametime

21.01.2022 Textures of Wavell #blackbutt #whitebrick #brisbanebuilder #wavellheights @ Wavell Heights

18.01.2022 Everything is on the up at Wavell- steel in, floor framing down and wall frames just arrived. Within the next 2 weeks it should start to look like a house #newhome #wavellheights #brisbanebuilder #timberframe #bigcrane #roofparty #carpentry @ Brisbane, Queensland, Australia



16.01.2022 Dirt, dirt and more dirt! Pushed through the wet conditions to prep for concrete #persistencepaysoff #concrete #stoptherainplease #newhome #brisbanebuilder #digging #northbrisbane @dvpropertygroup

15.01.2022 Finished the year with a roof and a few windows, the rest can wait til early January! Merry Christmas! #finishedenoughfornow #christmasbreak #wavellheights #brisbanebuilder #roof #twostorey #bhlh #2018done

15.01.2022 Soil in thanks to @groundworksaust well definitely be doing this again! #soil #brisbanebuilder #landscapedesign @ Wavell Heights



14.01.2022 Stairs day! Of the cantilever variety.. #cantileverstairs #entrystairs #wavellheights #brisbanebuilder #heavylifting #featurestaircase @ Wavell Heights

14.01.2022 Thanks for following us! #500followers #brisbanebuilder

14.01.2022 These slabs of goodness where selected for our Wavell Heights project. Now for @southportstone11 to work their magic! Cant wait to see the finished product.

13.01.2022 Carpentry is flying toward the Christmas break. roof any day now! #trusses #wavellheights #brisbanebuilder #roofparty

13.01.2022 Retaining wall time - first in ground works kicking off! #retainingwall #excavation #saturdaysatwork #brisbanebuilder #eight3 #digging #earlyknockoff



13.01.2022 Morning deliveries! #steel #newhome #brisbanebuilder #whereisthecrane

12.01.2022 Coming toward the back end of the build with final trades kicking off on site this month #backdeck #blackbutt #joinerywork #whitepaint #brisbanebuilder #fixout #fitoff @ Brisbane, Queensland, Australia

11.01.2022 Better late than never.. Energex power connections seem to be the longest lead time in building!!! #powerconnection #electricitybill #3phasepower #brisbanebuilder #betterlatethannever

11.01.2022 OLA Wavell Heights school carnival this Sunday 21st July from 10am! Be sure to get a raffle ticket for the ‘barrow of grog’ for a chance to get one of these beauties! #schoolcarnival #schoolfete #wavellheights #wheelbarrow #raffle @ Wavell Heights

10.01.2022 The open corner stacker door, yes! #cornerstackerdoors #wavellheights #brisbanebuilder #openplan #outsidein

10.01.2022 Pool building underway, out of the ground to avoid the rain! #wavellheights #brisbanebuilder #noblepools #backyardpool #slopingsite

09.01.2022 Quick office fitout pre-Christmas! This one should look good #finishbychristmas #brisbanebuilder #officefitout #coffeenextdoor

08.01.2022 LED lighting under benches or cabinets lifts the lux to the next level #Wavellheights #wowfactor #ledlighting #kitchendesign #kitchenlighting #lux

08.01.2022 Wavell about 97% complete, just the final few items and detailing to go! #brisbanebuilder #kitchendesign #openplanliving #livingroom #homestretch @bighouselittlehouse

07.01.2022 Up we go! Rear scaffold up ready to let the steel guys do their thing and start getting this house framed. Good view from up their back at our ground works and front slab section #structuralsteel #scaffolding #brisbanebuilder #wavellheights #newhome

07.01.2022 Saturday concrete #retainingwalls #concrete #brisbanebuilder #wavellheights

06.01.2022 Floors going down, scaffold going up. Its getting next level at Wavell! (Pun intended ) #brisbanebuilder #wavellheights #upupup #scaffolding #tothelimit

06.01.2022 Deliveries onsite for the birthday boy! Thanks @beanbagespresso for the amazing cupcakes.

05.01.2022 Saturday laying! This real brick clip in system coming up a treat, and working well with our cantilever stairs #brisbanebuilder #cantileverstairs #internalbrickwork #bricks #paintitwhite #latenightideas @ Wavell Heights

05.01.2022 Plastering coming up a treat #squareset #plastering #louvres #brisbanebuilder #cavitysliders #littledetails @ Wavell Heights

04.01.2022 Epic stacker door going in to the Wavell build, 8.3m long x 2.7m high #bradnamswindowsanddoors #wavellheights #stackerdoors #eight3 #openplanliving #outsidein #backdeck #nowalls @ Wavell Heights

04.01.2022 Concrete just keeps flowing... #moreconcrete #wavellheights

03.01.2022 Closing up and services about done.. running out of room for air con duct! Wavell House nearly ready for plasterboard! #wavellheights #brisbanebuilder #bosshomes #bhlh #newhome #crackingon #scyonwalls #axon #colorbondmonument #blackbutt #timetopaint @ Wavell Heights

03.01.2022 Last pieces of the puzzle #superwhite #cdkstone #nearingcompletion #brisbanebuilder #brisbanerealestate #kitchendesign

02.01.2022 Signs up, just got to build the house now! #wavellheights #sitesigns

02.01.2022 Back deck goals, one of our favourite deck builds! #deck #renovation #deckreno #brisbanebuilder #bbq #backyarddeck

02.01.2022 First concrete pour of the job, good to see some grey stuff underway #Wavellheights #brisbanebuilder #footings #retainingwall #concretepour

02.01.2022 Back in action for 2019 with @australiantimberceilings blackbutt VJ ceilings and soffits going up #brisbanebuilder #wavellheights #timberceiling #blackbutt #reardeck

02.01.2022 Our new website is now live! www.eight3.com.au #brisbanebuilder #online #building #hightech

01.01.2022 A morning away from site, and I come back to lower walls up! #brisbanebuilder #walls #fastbuilder #gettingitdone

01.01.2022 The end in sight with floor finishing and joinery full steam. The guys putting in even into the night to get this one over the line in time for Easter. #brisbanebuilder #blackbutt #timberflooring #floatingstairs #customhomes #bhlh #brisbanerealestate @ Wavell Heights

Related searches