23.01.2022 What a weekend ... 17 temporary pumps installed with hoses at 12 different sites for dewatering ... time to get some much needed rest and prepare for the week ahead. Seriously people stay safe out there and if you don't need to travel stay put ... was so sketchy today espically travelling between sites ... #design #supply #install #maintain



20.01.2022 Bit of a different one today ... Before and after ... 12 x spoon drains / pits all cleaned and interconnecting lines jetted and now all free flowing back into the septic collection pit at the front of property ... #design #supply #install #maintain

17.01.2022 Something a little different tonight. Helping our good friends out at Wilo Australia tonight with an after hours deliver of some NL pumps to the David Jones store in the Sydney CBD. #design #supply #install #maintain

16.01.2022 Nice Saturday morning job. Pit cleaning and upgrade of diaphragm pump to cope with extra car wash bays in system. Check valve taken out of suction pipe and strainer added to protect pump. #design #supply #install #maintain



15.01.2022 Had the pleasure of flow testing these triplex potable water supply pumps for the Westmead Hospital Redevolpment project last week ... Apart of NSW Health guidelines is that all pumping equipment must be certified by a 3rd party ... With our fully accredited and calibrated flow test equipment we are geared up to provide this service ... #design #supply #install #maintain

12.01.2022 A nice an easy change over to finish the working year, we replaced these old Zenit pumps with Wilo pumps after a frantic call from a customer saying there basement sump pump system was in alarm and worried about it comming into the Christmas period. We jumped straight on it and got the pumps and pipework replaced. #design #supply #install #maintain

11.01.2022 Today was all about certification of a stormwater pumpset system. We supplied, installed, commissioned and flow tested these Wilo Rexa series stormwater pumps as apart of NSW Health hospital upgrade program. Apart of NSW Health commissioning guidelines is to be able to show that pumping systems meet design duties and we were able to do that with the assistance of our own certified ultrasonic flow meter. #design #supply #install #maintain



11.01.2022 One of the many jobs we have attended to over the past week. Asked the customer when is the last time the system was serviced? They replied, not sure we have been here 3 years and haven't had the pump looked at as it's just worked. Pump died due to silt build up and pit was also taking in ground water. Pays to have your pump systems serviced on a regular basis. #design #supply #install #maintain

11.01.2022 Out doing our preventative checks on this little green machine we supplied just over two years ago, 13,000 hours of continuous running supplying potable water to Northside Clinic and hasn’t missed a beat. #design #supply #install #maintain

07.01.2022 A continuous problem we keep facing, baby wipes and hand towels being flushed down the toilets. Unfortunately these do not break down and eventually clog up sewage pump systems like shown below. This was a service call we attended after hours as the sewage system had gone into high level and started alarming. Both pumps were completely blocked and had to be pulled down to remove all the foreign debris. #design #supply #install #maintain

06.01.2022 It always makes the job so much better comming into work on equipment in a plantroom kept in this good of condition. #design #supply #install #maintain

02.01.2022 Last job for the working week, got a call from a new customer saying they had very low water pressure to the lower levels of the complex and no water to the higher levels. Pump one was seized and pump two bearings were on the way out. Both check valves faulty and passing. Replaced and up sized pumps and check valves same day. Six hour turn around from when we first arrived to having system completely re done. Another system that had never been serviced, pays to have your pump system serviced on a regular basis. #design #supply #install #maintain