25.01.2022 We are the proud winners for the Queensland Master Builders State Award for Retail Facilities up to $5 million with the construction of the Quicksilver Building at Port Douglas.



24.01.2022 The weather Gods were kind to RFC last night with just light showers we had no dewatering requirement this morning. 35m3 plus poured into ground beams in the wet season with no rework is good Management and Luck A1. The concrete is lazer and screeded to level to create an even base for the block work coursing so no block cutting. A block mortar bedding is 10mm thick so tolerance is kept within this 10mm on the screed in this heat! Brad closest in photo is the 4th year Apprentice and performing right on cue to make Tradesman for August.

23.01.2022 Cairns International Tennis Center - Court One has received an upgrade with Field Construct providing a new light membrane roof and playing surface. The main challenge was to place equipment weighing 130 tonnes without crushing the existing court pavement. RFC partnered with Keller Piling, Babinda Electrics, Tacoma Plumbing, Cairns Steel Fabrications, Fabritecture Australia, Ultimate Finishes Plexipave and HPS Stainless Steel. We are delighted with the quality of design work by Tensys Engineers. The Official Opening was well received and a lot of fun with the World Number One Ash Barty in attendance. Thank you to the Cairns Regional Council for assisting us with our obligations under the works.

23.01.2022 Construction completed at the units we built at 13-15 Cattle St Edmonton. Photos of the Fred Morris Place Naming Ceremony that was held on Monday 11th November 2019. As you can see from the photo of the units they turned out lovely for our client.



22.01.2022 The Esplanade Dining Precinct is progressing nicely. Matt from RFC hard at work core drilling the concrete column ready for the new steel roof frame. Matt loves his long range rifle shooting, not quite long range but on this occasion we will give you full marks on your technique.

22.01.2022 Martyn Street Netball courts are closer to completion. Lights are in and working and now rain hail or shine netball can be played.

22.01.2022 The Mines and Survey Department loves their new Field Construct shed. It must be All Finish Concrete Mark Pope’s Tilt Up Panels.



21.01.2022 James Cook University half basketball court is now complete. We would like to thank the architects Clarke and Prince for the design. Photos of the progress from the start of constuction to the completed project ready for when the students return.

20.01.2022 Work has commenced on the roof at the Tennis Centre on Sheridan Street. More photos to come as we progress through the build.

19.01.2022 Efficient method of ceiling peno's

18.01.2022 Out with the old and in with the new (soon to start) Buchan Street Department of Natural Resources, Mines and Energy Depot with be getting nice new building. Photos of the old building I will keep you updated as the build progresses.

15.01.2022 The Monday afternoon race is on to prepare ground beams for an 11 am 30 cubic meter pour tomorrow. Should it rain tonight these beans will require dewatering Here’s to favourable weather tonight.



14.01.2022 The new roof at Martyn Street Netball Courts is complete, now the netball courts can be used rain, hail or shine. Thanks to Saints Netball for letting us use the photo.

14.01.2022 Cairns newest industrial building has opened this week following a November 2019 commencement by Field Construct. Sam, Charles, Jai, Matty, Robbie, Colin and Bradley have done an exceptional job to be proud of.

13.01.2022 Footings yesterday and block wall today trades are running back to back while the sunshine‘s to get the work produced production is up.

12.01.2022 Richard Field Constructions is pleased to be awarded the early contractor involvement, construction and delivery of the Cairns Esplanade Dining Precinct works by Cairns Regional Council. This project will showcase the Far North’s foreshore dining experience with pedestrianisation, contemporary weather protection and exciting landscape works and is due for a fast tracked completion This project enables our banked project expertise and community engagement to advance Cairns tourism post COVID.

10.01.2022 Redlynch State College's new science and technologies building is at the roofing stage, it is on track to be at lock up before Christmas. RFC is proud to have our dozen direct carpenters constructing the roofing frame.

04.01.2022 I dropped by Redlynch State College to chat about the new Science and Innovation Centre - construction is well and truly underway.

03.01.2022 Martyn St Netball court roof if looking great and is due for completion mid December 2019. Great view from the roof.

03.01.2022 The esplanade dining precinct refurbishment has progressed with fast tracked timing to build gantries and main building elevation works while allowing public to access the food courts. Major street re-profiling and storm water drainage works in progress. The weather has been kind with the tropical heat and humidity building. Historically there can be 100mm of rain a day from Melbourne Cup onwards so it’s important we close the drainage works now.

02.01.2022 JCU Basketball Court. Saturday morning pour, early start to make sure we get ahead of any afternoon storms. The slab took a good treatment of aliphatic alcohol & curing oil, re-entrant saw cuts all done by 2PM. Concrete best practice.

02.01.2022 James Cook University Cairns Campus have engaged Field Construct to refurbish the rainforest creek bridge while the students are COVID-19 absent. To do this we have closed the bridge, removed the handrails and are repainting the beams and columns to renew the finishes that have deteriorated due to the wet environment. This will be a 20 day shut down.

02.01.2022 Under the pump. We are pouring new foundations for Redlynch State School with J Bros Form works and Cairns Crete Pumping. Holcim concrete has been just right to achieve an aesthetic finish to columns. Our team is very experienced at this work and are enjoying the build with db Arch and ARUP's plans.

01.01.2022 Field Construct delivered this Design & Construct project replacing the old and tired Fire Station which had become unfit-for-purpose with a new, modern facility in line with current QFES operational requirements, providing emergency services to the El Arish community and surrounding areas. Acting as Design Manager, Field Construct engaged and coordinated all design consultants ensuring QFES strict technical requirements were achieved and documented. Construction progressed throughout a relentless wet season, with the team on site taking all measure of mitigation strategies to ensure delays were minimised and the project delivered on time.