25.01.2022 Photos of todays concrete pour at Flockmill. Were working hard to beat the weather!
25.01.2022 Good momentum is happening at Flockmill with Hardy Street Stage 1 framing complete and Stage 2 commencing tomorrow. Our red bricks have started to be laid and look incredible
24.01.2022 We love a great cheap eat @#Flockmill!
24.01.2022 Some recent photos of the demolition taking place at #Flockmill. Were really happy with the respectful approach WSG has shown to the local community, throughout this process.
23.01.2022 More videos of our first pour today, weve got two concrete teams going with SAW Constructions
22.01.2022 Sunshine on our shoulders makes us happy Slabs have dried off nicely as todays pics show More concrete to come this week.
21.01.2022 Hardy Street Stage 1 framing is complete The first of our red bricks are back and looking great The detail of the window balcony planter boxes look fantastic and really accentuate the generous windows. Great bones on this project
20.01.2022 With great weather on site last week, we kicked it into high gear! With Demolition DONE, Environmental DONE, and the Civil Contractor working at a FAST pace, we are on track for the builder in January with all clean up, Subdivision and pits and pipes DONE! Follow us on Instagram at @rothdevelopments & #flockmill to see all the latest photos from site!
20.01.2022 Its fair to say weve been busy, because were nearly all sold out, theres only very limited opportunities left - less than you can count on one hand! So our posting has been a bit slow. Heres what been keeping us on our toes...
19.01.2022 A recent excursion to our joiner’s factory with our builder to check the sample quality and finish of Flockmill’s kitchens. We weren’t disappointed. They look fantastic! The attention to detail and finish is great Can’t wait to see our stunning kitchens in place
18.01.2022 Flockmill is powering up Our Citipower power substation is complete and handed over to Citipower for permanent power to site. Just needs a coat of render to finish off.
18.01.2022 Anyone feeling thirsty for a frothy? Another exciting place opening up just down the road from us, between Stewart and Blythe Streets on Lygon in East Brunswick. The old Clegs store has transformed from fabric house into ale haus... Alchemy Brewery is a 16 tap brewery bar! https://www.facebook.com/146564303090/posts/10156824864568091?d=n&sfns=mo
16.01.2022 Flockmill Structural Steel and Light Weight Frames going up. Flockmills progressing well with ground slabs going down and structural steel and light weight frames going up. The frames give a great sense of the shape of the future homes.
15.01.2022 These black electrical metre panels dotted all over the site represent the completion of the electrical infrastructure. It may look like not a lot has happened, but there are kilometres of wires and pipes and tunnels under the ground. All of the work below ground is complete. Above ground work will be springing up from now on and be more visible! We continue to work during these challenging times with health concerns surrounding covid-19.
14.01.2022 SNEAK PEAK || Look inside as we walk through Flockmill’s Hardy homes. They’re coming along fast and they’re looking great All of these Hardy townhomes have three bedrooms, inclusive of a master with ensuite. The kitchens are fantasticso generous, well appointed and stylish. We can’t wait until the bench tops and bathroom vanities are in with their custom metal legs. The townhomes are awash with light and feel so spacious. We couldn’t be happier with the progress. Thank...s team: Saw Constructions GM Project Management Rothelowman CK Architecture Intrax Stucterre https://youtu.be/2njlxbQVvfQ
14.01.2022 Todays video showing truck and dog trailers delivering permanent road ballast for road works and also exporting excess fill from site. Town Home ground slabs will commence over the next month. We keep working on site, stay safe everyone!
13.01.2022 Some of #Flockmills history... Did you know that Flockmill made the underlay felt for FELTEX carpet, an iconic Australian carpet? Heres an advert from 1957. So very 50s, heres what Ruth Sloane the 50s interior designer extraordinaire had to say: "Heather pink patterned FELTEX gives you beauty- a layer of colour and comfort that requires so little care; it gives you warmth - a blanket of quiet and well-being that makes home, home". This ad featured in the Australian Womens Weekly, September 25th, 1957. Watch out for our series of retro 1950s ads featuring FELTEX and Flockmill history...the design is timeless even if the thoughts and attitudes have changed!!
13.01.2022 And then there were three... Only three remain- we are virtually sold out! Enquire now to view- our display suite remains intact and open by appointment. Call Campbell on 0417 369 818
13.01.2022 WE ARE SOLD OUT! Thanks to all involved, It was a massive team effort. We loved the journey and cannot wait to see Flockmill come to LIFE.
12.01.2022 Some more retro inspo care of Feltex carpets and #Flockmill. This carpet fits nicely into the palette of #Flockmills brick red logo and distinctive brick facades.
12.01.2022 #Flockmills demolition is nearing completion. Enjoy this fly over our site on this golden Winters afternoon.
12.01.2022 Some impressive aerial shots of our type Es, thanks to our frame supplier Dynamic Steel. These have seriously fitted together seamlessly well High level shots showing off the great design of Rothe Lowman. We love it. Check out these balcony planter boxes for your fruit & veggies
11.01.2022 This weekends flyover #Flockmill #Brunswick demonstrating great progress on site. We are setting a cracking pace and well progressed and on-track with great teamwork between our builder @sawconstructions and project manager #gmprojectmgt
10.01.2022 We think Flockmill and Brunswick make for good community living find out more here... https://www.planmelbourne.vic.gov.au
10.01.2022 Progress has been setting a cracking pace. These internal pics show our commitment to meticulous detail, from the heated towel rails and floor in the bathrooms, to the bespoke metal bases and legs in the kitchen and bathrooms. No details has been forgotten From the black ceiling fans to wall lights and black hinges and door furniture, Everything is considered and coordinated Also, who could forget the spectacular routed back-lit black granite shelf that nearly broke our s...tone mason trying to workout how best to attach it at only two points either side so light can wash down the splash back and allow for the range hood exhaust fan to work We are sticklers for detail!! and we’re committed to great design and execution so our product matches our promise We’re now at the defecting stage for stage one, with appliances going in. More updates soon!! See more
10.01.2022 Some great photos from our Launch Day...everyone had a fun time! Thanks to great music from Little Paul, really tasty local treats from All Day Donuts and Monsieur Truffe, coffee from BeanTo in Brunswick and some very talented face painting from Suedy. The kids loved playing with #Flockmills furry friends - the flocked pups were a hit!
09.01.2022 Today on site at #flockmill...Sewer and drainage works progressing well, environmental works complete, civil commenced and progressing well. Follow us @rothdevelopments on Instagram to see the latest updates.
09.01.2022 Drone flyover from mid March, with road and kerb done for stage one . So much progress has happened lately in the four weeks since we took this, we haven’t stopped to post!! Stay tuned, more updates to follow shortly....
08.01.2022 Hardy Street homes scaffolding is removed, render, screens and external facades are complete. Roofs are fully fitted out with solar hot water, PV electric and air cons. Plastering internal walls on Hardy homes has commenced. Type J homes have framed-out and roofs are complete. Internal services rough-in is now in progress On Js. Three story type Es are also well progressed with framing and roofs complete. Window shrouds are due on site next week. We are still powering ahead with works and every weeks shows more progress. The team has been working hard to maintain schedule and we are still on track for project completion second and third quarter 2021
08.01.2022 Some video of walk through last week with SAW on site. The framework for the job is progressing well. The off-site manufactured frames are now going up seamlessly!
08.01.2022 Demo nearly complete @#Flockmill
07.01.2022 Flockmill’s type Es as part of our stage 2 build is looking awesome These are some seriously good looking bones. We are so proud of our team for powering through this challenging time to stay on track and focused on our delivery dates
06.01.2022 Todays meeting maintaining social distancing. We are still working on site and work continues with Saw Constructions, Intrax and Western Civil. Being a large site located outdoors, we feel able to continue whilst being mindful of rules regarding covid-19. We are determined to continue to work and we have the support of Saw Constructions and the ANZ behind us. These are challenging times and we wish everyone well.
06.01.2022 Further progress photos of Flockmill’s Central Park ...p.s. stay tuned we’re further along than you think!
05.01.2022 Excited to be pouring concrete today! A second crew joined the project as we dodge the rain again. More concrete is scheduled for the coming week. We are keen to get all the block C townhomes complete quickly
05.01.2022 Work on Flockmill’s Central Park has begun and we’re so excited to actualise this vision! With productive garden, lush lawn area , BBQ with pergola and dining area, food van parking bay, lounge chairs and park seating. Also, packed with other great features like bocce court , bicycle parking and repair station and an amazing POPP table tennis table. This amazing space brings all the townhomes together with a central, community focused hangout adding maximum amenity and liveability at the heart of Flockmill .
05.01.2022 BUILDER ANNOUNCEMENT... We are excited to be working with SAW Constructions for the townhome build, the 4th largest townhome builder Nationally, with an eye for meticulous delivery and a great work dynamic. They have hit the ground running in January!
05.01.2022 Another advert in our little series featuring great retro 50s design and FELTEX carpets where #Flockmill felt and flocking was used as underlay. Undoubtably 50s design was bold and colourful. We love the Feltex Colour Bureau!
05.01.2022 Perfect skies on this Winters day deserves a photo shoot with the best looking site manager in Melbourne... Ziggy the Border Collie- a true flock dog... Enjoy our progress photos at #Flockmill!
04.01.2022 We had fun at our recent "Meet the Neighbours" drinks night. Everyone loved chatting and getting to know each other - a great vibe already! Cant wait for our community at #Flockmill
04.01.2022 Drone flyover this morning. We completed another pour yesterday, thats two this week. Were pouring three homes at a time. Next pour is scheduled for Monday
02.01.2022 Birds eye view of Flockmill over the weekend. Were on track and working well through stage 4 Covid. Were focused on critical path activities to make sure we keep our completion dates
02.01.2022 Happy Days... Wed rather have food around the corner than fuel! Looking forward to this being built just down the road from us... https://www.afr.com//woolies-snaps-up-caltex-sites-for-new
01.01.2022 Drone fly-over this morning to show the site progressing well in preparation for a concrete pour. Slab on ground works are progressing. We are very grateful that we have a large outdoor site so that we are able to continue to work safely.
01.01.2022 What a great weekend weve had! Thanks everyone for exploring what we have to offer... We had a very happy day with everyone! @ #Flockmill