FNQ Construction Group | Construction company
FNQ Construction Group
Phone: +61 400 319 420
Reviews
to load big map
25.01.2022 Gotta love fabrication days!!
25.01.2022 2 days of very hard work & the trusses are up. Just a few jack's & some strapping & we'll be ready for fascia, gutter & a roof.
24.01.2022 With 16 mm Reinforcing & concrete filling the top 400mm around the whole house & all corners and window openings Also filled with Reo & concrete down to the slab it's not surprising that North Qld builds some of the strongest homes in the world!!
22.01.2022 Sign's up, ready to kick off construction on Monday.
21.01.2022 Our first glass pool fence installed on a balcony over a pool. It's taken a huge amount of effort & absolute attention to detail but the result is nothing short of spectacular!!
20.01.2022 Concrete truck just arrived so we can pour the Bond Beam. Trusses will be put up next week. It's coming along nicely.
17.01.2022 We have a kitchen installed, granite bench tops middle of next week. Looking great.
11.01.2022 We've had some more progress on the house. Internal walls completed & external rendering finished. Looking good. Time for windows, electrical then plasterboard.
10.01.2022 The new signage for the car looks fantastic. If you're going to advertise your business with a car wrap you might as well smash it out of the park!!
10.01.2022 I get plenty of opportunities to try new products to complete the work I do for my clients. It's surprising how many times I've had to convert rust to stop the damage and seal the material to increase it's lifespan. After trying literally dozens of different products I found the Wattyl Rust-eeter. NOTHING comes close to how effective this product is!!
09.01.2022 Stripped the slate on this balcony last week. Today we're sealing it in preparation for the new glass balcony/pool fence going up shortly. Looks great.
09.01.2022 Roller door installed, driveway should be poured Friday. This part of the build is the most exciting as it all comes together.
09.01.2022 There was movement at the station, for the power was on & the outside has been painted!!
09.01.2022 The house is painted and we've started the splash back. The house is coming together nicely. Looking good for handover end of January
09.01.2022 We have a slab and walls. Just waiting for a contractor or two (who are on holidays currently) to get back before we do the bond beam, then we'll get some trusses up!! The house will really start looking good then. Happy Days
07.01.2022 We have to install a small retaining wall along the fence line at the new building site. Unfortunately it meant pulling down the only existing fence. 29 minutes from start to finish, pulling it down and removing the posts/concrete. If only the new fence/retaining wall could go up as quick!!
07.01.2022 Who would have thought we'd use 4000kg of tiles on the floors & bathroom walls!!!
06.01.2022 I've had to become a bit of a "Jack of all trades" in this job but fencing seems to be one of the most common jobs I come across. This Colorbond fence is a great improvement over the old rotten timber paling fence it replaced.
03.01.2022 Most days I love my job, but other days not so much!!
02.01.2022 It's been a big couple of weeks, the roof is on & internal walls are going up! Full steam ahead.
Related searches
- Hang Loose Productions
Businesses Arts and entertainment Performance & event venue
+61 412 040 095
53 likes
- Hang The Expense
Businesses Local service Home improvement Art Interior design studio
+61 414 283 713
68 likes