Foundation Technologies Australia | Company
Foundation Technologies Australia
Phone: +61 477 977 800
Reviews
to load big map
25.01.2022 So much talk about moving to Australian made post Covid-19. At Foundation Technologies Australia we have from day 1 supported Australian made. From the steel to make the piles, the manufacturing done in Australia by the awesome crew @aa_steel_works and using Australian Made drive tools from @digga.aus. Supporting Australian made has been and also will be one of our core values.
25.01.2022 Another day of static load testing before we start another project to give the engineer and builder 100% confidence in the helical screw pile. Tested to 50T.
24.01.2022 Static load testing is the best way to prove a screw pile works 100%. Foundation Technologies Australia conduct more testing than any other piling contractors to give our clients absolute confidence.
24.01.2022 Even on the wettest of days installing helical screw piles us possible. This jobs a great example of using the pile as the stumps for a bearer and joist build. 60 piles to support the bearers installed in one day allowing the builder to start the subfloor tomorrow
24.01.2022 During these unprecedented times it is critical as a business to understand your strengths and weaknesses. Strength and courage is knowing when to and where to get strong reliable advice from. Foundation Technologies Australia is fortunate to have the team @pitcherpartners and @masterbuildersvic to seek advice in ensuring the long-term health of not only the business but it's staff, allowing us to continue to service our customers and help keep our suppliers working as well. A great business is built on many small parts coming together.
22.01.2022 So lucky to have such an amazing organization in the @masterbuildersvic representing our industry and delivering strong messages.
21.01.2022 We are ready to assist our builders. Covid-19 action plan, face masks, worker permits, sanitiser and an awesome crew of guys all in place. We will get through these challenges together.
20.01.2022 Even through there is no trade qualification to install helical screw piles, this statement is 100% accurate. Make sure the company you use to install your piles fully understands and follows all the requirements of AS2159-2009 and AS2870. The team at Foundation Technologies Australia operates under worlds best practices to ensure complete compliance from design to installation
20.01.2022 In these very difficult times trying to navigate through as a business owner in the construction industry I want to thank the entire team @masterbuildersvic for the advice, clear messaging, and tireless work they are doing in keeping our industry informed of the ever changing landscape. Showing what a great industry association can and is doing for its members
20.01.2022 You know it's going to be a great day when you get to work with an amazing builder @leneevahomes
19.01.2022 Here is the first of a series of videos we are releasing. Do you know what a screw pile is?
18.01.2022 Further to our update late last night on the expansion of the specialist contractors list. The Business Victoria Construction Sector Guidance web page has now... updated the list of specialist contractors. The specialist contractor list now includes bricklayers, garage door installers, painters, roof tilers, window and glass installers/glaziers and other essential trades for building. To view the full list, please click below: https://www.business.vic.gov.au//construction-sector-guida #building #construction #industryupdate #masterbuilders #specialistcontractors
18.01.2022 Day 2 of installing 360 piles for a new basketball stadium. By using helical screw piles instead of bored piers and stumps we have saved the builder about 7 days in build time.
18.01.2022 Did you know that a screw pile contractor MUST Achieve all parameters from the design engineer. This can include SWL, minimum depth due to fill and minimum depth due to reactivity. Only providing some of these is NON COMPLIANT. Don't let a cowboy crew leave you with a foundations job that is not 100% compliant.
17.01.2022 https://www.facebook.com/Shortek-Systems-Australia-106174280967839/
17.01.2022 Conducting pre job start testing on a 5 unit development for our client to eliminate any nasty surprises with variations in Mordialloc where the founding depth can vary greatly. When a soil report doesn't give enough information a screw pile depth test can provide sureity of cost.
17.01.2022 The team at Foundation Technologies Australia together with the awesome crew from @aa_steel_works and @shortekaus will be exhibiting at the @dieseldirtandturfexpo 2020. Come and say hi to the guys and chat about all things helical piles. #screwpiers #screwpier #screwpiles #helicalpiers ... #helicalpiles #thisisshortek #shortekaus #shoring #shoringsaveslives #aussiemade See more
16.01.2022 More now than ever.
14.01.2022 A big shout out to @stroudhomesmelbournewestern for giving us the opportunity to assist on what will be a beautiful home in Trentham.
13.01.2022 Ain't no beer virus going to stop us from helping our customers continue to work.
12.01.2022 Not even 30mm of overnight rain prevents us from starting 150 pile job over 3 houses. The use of Helical Screw Piles is perfect for water logged sites.
12.01.2022 https://blog.chancefoundationsolutions.com/origin-and-devel
11.01.2022 #standatdawn #wewillremember
10.01.2022 Another load of 100% Aussie made piles on there way. Foundation Technologies Australia has been committed from day 1 to supporting locally sourced materials and keeping manufacturing in Australia It is now more important than ever to support Aussie Made. By supporting us you are keeping manufacturing in Australia
08.01.2022 The first of 2 jobs these awesome chaps. Installing our custom twin helix piles to improve the foundations for a maintenance shed at a footy ground.
07.01.2022 the team at FTA wish all our customers, suppliers and followers the happiest of Easters. Enjoy the time with loved ones, stay safe and eat lots of chocolate
06.01.2022 Another example of why our customers have peace of mind that we will ALWAYS deliver the most compliant pile for every job. Another day of static load testing before starting a new project. With our consulting engineer from @structerre_consulting overseeing the testing to ensure FULL compliance and transparency in our design and installation. DON'T RISK THE PART OF THE BUILD THAT HOLDS UP YOUR HOUSE. @ St Leonards, Victoria
06.01.2022 Master Builders Victoria continues to work relentlessly with government and our industry counterparts to address concerns of our members relating to the current... restrictions, that we believe can be safely addressed. Some of these concerns relate to bottlenecks being created in the small-scale residential sector, which we are pleased to advise have tonight been reduced. These changes will make it more practical to start and finish projects and will have a significant impact on this sector of our industry as a result. They reflect the positive nature of discussions with government as they continue planning for the roadmap to be announced on Sunday. Click to read more: https://www.mbav.com.au//clearing-bottlenecks-todays-gover #building #construction #advocacy #recoveryroadmap #masterbuilders
05.01.2022 Shortek Shoring is the perfect solution for trench protection
04.01.2022 What does a builder do when someone screws straight through a sewer and doesn't tell anyone? They call the team at Foundation Technologies Australia to do the fix up. We will be using the underpinning bracket to fix this messy situation. If only someone had told the builder before the slab went down this fix would have been sooooo much easier. Communication as always is the key. Watch this space for the end result of our fix on Monday. Great collaboration between builder, engineer and FTA will get the job done.
04.01.2022 What an awesome line up of talent.
04.01.2022 Shortek shoring is an excellent way to protect workers with deep excavated trenches
04.01.2022 An example of our residential temporary shoring @shorteksystems pile. With the steel embedment wing supporting the majority of the soil behind the excavation and the ply holding back the loose top soil. This job was installed in only few hours and allowed the bulk excavation to proceed without undermining the fence. .#thisisshortek #shortekaus #shoringsaveslives #shoringreinvented ... #helicalpile #helicalpier #patentpending @ Brighton, Melbourne See more
04.01.2022 The leaders in Helical Pile Technology. #screwpiers #screwpier #helicalpiers #helicalpiles #thisisshortek #howgoodisshoring #aussiemade #foundationspecialists
03.01.2022 Well that's lunch sorted thanks to the amazing @alotofgoodstuff Beautiful homemade sausage rolls with the best Vanilla slice going around for afternoon tea.
02.01.2022 The awesome @subaru_giant proudly supported by Foundation Technologies Australia.
01.01.2022 Proud to announce the new addition to the family. A new 8T Yanmar from the crew @tuttbryantequipment_vic This now brings the family to 5 Yanmar Excavators. With the brilliant 2 speed @digga.aus drive unit this little beast can handle almost any application. With machines starting from our little 1.7T there is no job too small or too big for the team.
01.01.2022 Suffering from collapsed bored pier holes with all the rain we've had? Installing helical screw piles is a stand out choice when presented with saturated sites. As either a quick remedy if the pier holes have collapsed or a straight up conversion if the soil is too wet to even try pier holes. Helical Screw Piles can get installed in almost any weather. Keeping your build program on track.