25.01.2022 Day 2 .job complete. Building propped and ground floor walls demolished and loaded out. Good job boys



25.01.2022 Day 1. Lakemba Hotel

25.01.2022 Just about done for arndell Park until need to come back at a later date for a lift pit, well done to moe ,jerry, Alex,Lewis Anthony for a job well done

22.01.2022 Can anyone explain what they see in picture?? Its just appeared in a photo we took today..look in front of the pile of branches on lawn. We cant work out what it is



22.01.2022 Started another job removing flooring and joists and taking down walls and removing footings and pathways

16.01.2022 Continue soft strip as well as 1.7t excavator started knocking down bathroom walls at sportsman hotel

15.01.2022 Started a new job at the sportsman club at Blacktown started light strip



15.01.2022 Some more scabbeling and cutting out thin slabs and removing from site at bass hill last night

14.01.2022 Back on night shift at bass hill plaza

14.01.2022 The boys put in a big effort today at bass hill taking up the tiles outside the shops on the top level ,well done boys , Moe ,Lewis,Alex ,jerry ,Anthony, Leigh and our bin driver nick

11.01.2022 Progress photos from east Campbelltown

11.01.2022 Exciting new project commencing monday. Frontline were engaged for total stripoout of LAKEMBA HOTEL. Scope Total Stripout of 32 accomodation rooms, 12 bathrooms... and common areas on first floor as well as propping and demo structural walls and openings. Total stripout of ground floor including 2 bars, bottle shop and concrete coolroom, gaming area, 3 large bathrooms, and create voids for light tunnels, propping and demo of structural walls.. Exernally works involve demolishing suspended verandahs, external fixings and removal of retaining walls and bitumen from carpark. Progess phots will be posted after commencement.. See more



10.01.2022 Small structural demo at Shellharbour today and tomorrow. Prop floors and upper level brickwork to demolish ground floor brickwork by hand. Building will be almost fully propped and most ground floor structural support walls demolished. Steel being installed Thursday.

08.01.2022 Hi everyone.. Please accept nick nack as a friend request.. Its not a scam or hacker.. It is a profile we set up to start nick nack store, an online platform t...o advertise all items we are selling.. Please accept and share with your friends. Thankyou See more

07.01.2022 Leigh removing tiles and topping at bass hill plaza jerry cutting 60mm with wet saw so they can get there levels right at the raised ramp

07.01.2022 The boys taking up the tiles at arndell Park inside and outside

06.01.2022 Progress photos for Planet Fitness, Forty Winks amd Drummond golf defits. Night shift crew doing great job

01.01.2022 Getting back in the swing of things at the Goodman’s factory at Smithfield with jerry and Edward

01.01.2022 Started a new job at woolahra back of a house demo