GR8 Walls

Locality: Knoxfield, Victoria

Phone: +61 1300 478 955



Reviews

Add review



Tags

Click/Tap
to load big map

23.01.2022 And the Docklands project continues on. Curves, inclines, changes of direction, mitred joins, and other challenges. The team are still setting a good pace with high standard finishing.



22.01.2022 Another time capsule Gabion installation for Banyule City Council in the former Bellfield Primary school grounds. Nice work team.

20.01.2022 And the build of the gabions at Docklands is going forward at a cracking pace.

20.01.2022 Nearly finished at Rye.



19.01.2022 And with safety rails fitted and clean up completed the Great Wall of Norcal Road is now completed and signed off! Cage from Permathene recycled brick from Eco Group build by the team.

13.01.2022 The view from my office today.

12.01.2022 Treated pine and steel in before the building starts on a new unit.



11.01.2022 The build continues at Docklands and getting ready for backfilling at the Promenade end of the site. Despite the adverse weather conditions and the worst flu season in years the team are pushing on at a good pace.

11.01.2022 Before and after in Frankston.

08.01.2022 Signage is now on the time capsule Gabion in Bellfield estate. Nice that the history of the site has been recorded and the time capsule from 1985 has been preserved for opening in 2035.

05.01.2022 All done in Ferntree Gully. Pier holes were dug in mud rock and or shale. A tough project.

04.01.2022 Concrete sleepers in steel uprights. Multi level and multi directional.



02.01.2022 Meanwhile a six metre concrete sleeper wall in a tight location has been completed despite the weather conditions.