Australia Free Web Directory

Grawich Marine | Vehicle, aircraft and boat



Click/Tap
to load big map

Grawich Marine

Phone: +61 417 991 363



Reviews

Add review

Click/Tap
to load big map

25.01.2022 1 coat down 2 to go



25.01.2022 Fair and paint a 45 ft and a 635l, Going to be a big week/month. Still snuck in some time to kill a fish

22.01.2022 Looking forward to seeing this one complete, going to be a weapon

22.01.2022 Holes glassed and filled and fairing under way



18.01.2022 Deck strengthened and hatch repaired

18.01.2022 Slowly taking shape

18.01.2022 Bit of bait tank blue and some high build on the last couple of parts



17.01.2022 Getting there, now to start the top

17.01.2022 Slowly getting some shape back on the old Haines

17.01.2022 Repairing hatches

16.01.2022 Time to give this old girl a birthday

16.01.2022 Wave breaker and the new gunnel to be fitted and she is done



15.01.2022 Done and dusted

15.01.2022 Grinding and first fill complete in epoxy fairing compound

14.01.2022 Gunnels on, windows blacked out. Screen going on tomorrow. Finish line is just about here!

14.01.2022 Wave breaker complete

11.01.2022 15 ltrs of high build on the old girl, bake and then spot fill Monday

10.01.2022 More Grinding, more holes to fill

10.01.2022 All nice and clean and ready for delivery

08.01.2022 1 good as new hatch and the non skid coated, almost ready to spray the top

08.01.2022 Filling holes and grinding fibreglass, almost ready to start fairing

06.01.2022 Some primer on on the deck for the Haines and slowly getting some shape into the Wave breaker on the shark cat. Need a bigger shed

04.01.2022 Just a few pinholes.... A few thousand

04.01.2022 Ready for delivery

04.01.2022 Shark cat ready to be put back together and the Haines just about ready for topcoat on the deck

04.01.2022 Back on the trailer and non skid applied. Almost ready to make the topsides white and glossy

03.01.2022 Like a new one, looking forward to seeing the old girl out in the sun.

02.01.2022 Ready for some detailing tomorrow

02.01.2022 Another one down

01.01.2022 Progressing nicely on the Oram 45 ft Catamaran, tunnel and swim platform have had a quick fair and prime then finished in Hardtop Ultra with the Airless, next to finish fairing the transom. Also getting through the prep and repairs on the 635l

01.01.2022 Watching paint dry today and playing with some new toys

Related searches