HW Cabinets | Local service
HW Cabinets
Phone: +61 425 305 737
Reviews
Tags
to load big map
24.01.2022 Small job from last week Client just wanted to put some doors on their open pantry shelving
23.01.2022 Another smooth and effortless job done today. A bit of extra storage space in this laundry will go a long way, especially when tucking the vacuum away for a charge. Almost didn't even need to silicone
23.01.2022 Job from a couple of weeks ago. Client bought a steam oven wich didnt quite fit the provided space, and was way too high. We rebuilt the entire tower, still managing to keep original doors, and also gave them a gain by opening up the wasted space in behind the bulkhead for those extra tall items.
23.01.2022 Had another job for another return client, after being so happy with reconfiguring their ovens, I was asked to reinstall the kicker panels after their flooring was finished. Not an easy task to carry out, doing mm cuts to suit the skirting boards good enough to ensure the smallest beads of silicone, as well as getting it that close to the floor boards that no silicone/caulk is required.
21.01.2022 Another job completed this week. This one stalled for ages due to covid. The client renovated their laundry and we supplied; cabinets, stone, integrated dishwasher panel and splashbacks to basically help turn this big space into a laundry/butlers pantry. The clients were even kinda enough to buy some beers for all the hard work and effort.
17.01.2022 Bit of a busy weekend, couple jobs completed. One was for a returning client, just after some shelves in a wardrobe for shoes. The other, was adding some cabinets on the back of an island, to give them some extra much needed space.
15.01.2022 If you have a desk or furniture that you would like to protect, let us know and we can organise toughened glass to keep it looking pristine, just like this client has done
14.01.2022 Another busy but successful weekend for us at HW Cabinets. Customer was after a tidier pantry but with the same amount of space. We removed the old shelving, repaired and painted the walls. We were able to provide more storage space and more prep space but also continued the look and colours of their kitchen for that natural feel. Not only that it looks and feels bigger!
13.01.2022 2 jobs from last year.
12.01.2022 Was an absolute pleasure to this job. Wish all clients were like this one. We extended the Ensuite, with adding some drawers, new stone and a new basin cabinet, without impacting necessary space. We also added some drawers to the bathroom, new stone, new basin cabinet, as well as mirrored shaving cabinets, for even more storage space.... Always risky drilling into tiles, especially so close to a shower screen, but, with a slow and steady approach as well as specialist new porcelain drill bits, was no issue whatsoever.
11.01.2022 No job too small, trimmed and refit clients kick panels today after having floors laid.
10.01.2022 Good to get another job completed. We and the client took a huge risk by cutting open the void space in the island. Big risks = big rewards, we were able to replace the void space with cabinets, in doing so creating a lot of space and still keeping room to sit behind the island. We also integrated a microwave, added a drawer and Hafele pull out base unit, as well as fitting an integrated dishwasher door.
08.01.2022 Another small one for today, installed two doors to the microwave space, with push to open mechanisms and a small door underneath the oven, after a smaller one has been put in.
07.01.2022 Installed garage cabinets Installed an additional shelf and cabinets in the laundry. Clients original colour was discontinued unfortunately, from a distance its a pretty close match for the shelving, but we refaced the existing doors in the laundry to ensure there was no colour issues.
05.01.2022 Another job finally completed after suffering majorly due to the first lockdown, and cutting it thin, managed to finish late Friday afternoon before another lockdown. Really enjoyed this job, a few things very different to normal, the clients were nothing short of amazing and patient as well. Hiding the mirror base in the benchtop was very hard but very rewarding to see the finished product. We also put some grooves in the floating shelves for picture frames to sit in snug, without any fixings.
04.01.2022 A few before and afters. We installed a 3.5m long media unit, overheads and microwave box as well as a boxed shelf. We also did a few minor items for the client, installed a drawer to the old microwave space and drilled holes for dishwasher plumbing. We also gave the doors an adjustment, as well as giving the stone a good clean and polish as an added extra.
04.01.2022 No rest for the wicked. A change over desk we installed today. Due to a height issue, we replaced the desk with one half as thick, raised it up and capitalising on space, added a pigeon hole. (Which was the clients idea)
01.01.2022 Client removed the shelving, so we could continue the look of their kitchen and butlers pantry, giving them more bench space as well as a more organised, tidier, bigger feeling space.
01.01.2022 Job from last week. Replaced water damaged cabinets, frame and doors for the hot water unit, for this laundry.
Related searches
- BLING Cleaning Services
Businesses Local service Cleaning service At-home service
+61 418 101 473
160 likes
- Key Largo Professional Centre
Businesses Local service Business centre Event space
+61 499 977 569
16 likes