Australia Free Web Directory

Ideal Group in Canberra, Australian Capital Territory | Property



Click/Tap
to load big map

Ideal Group

Locality: Canberra, Australian Capital Territory

Phone: +61 404 447 352



Address: 5/8 Beaconsfield Street 2609 Canberra, ACT, Australia

Website: http://www.theidealgroup.net.au

Likes: 584

Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Heights set and cut thanks to the onsite help of @benwalkerarchitects conduits installed for data and power now ready to core-fill tomorrow job is moving along nice and quick thanks to the hard work by all involved



23.01.2022 Sneak peek of our floating staircase to basement level can not wait to strip the Formwork on this piece.... #concretestairs

22.01.2022 Our latest @stryum projects underway using 200mm shadow profile in custom colour light bronze ! #achiteture #cladding #aliminiumfacade

22.01.2022 Check out those perfectly finished angles our rendering crew have mastered all shapes to get that flawless finish #Thevanguard in Lawson is finished using next generation #polystyrene cladding and #Rockcote render and paint systems



20.01.2022 Our Campbell tri-occupancy project now complete and on the market ! With over 1000m2 of our next-gen Foam cladding /acrylic Rendering and membrane paint system using @novatexproducts this project speaks for its self , just breathtaking great work by the whole team ! #proud #canberra #acrylicrenders #painters #foamcladding

20.01.2022 @dincelstructuralwallin has started we are very impressed with the speed that this product can be installed with good planing the guys at @actformwork had all track in and 75% of the base structure up in 8 hours #watchthisspace @benwalkerarchitects @Narrabundah

17.01.2022 Yarralumla project



14.01.2022 Foundations are complete @thecollectorhaus great work by @mwplumbing @brownieselectrical @paragallihaulage @capital_concrete_solutions @earthmoving_creations and @m&msurveys for making this all happen without a hitch very lucky to work with such talented and organised trades. #apretationpost @ Narrabundah

14.01.2022 First floor precast is in thanks to the team @akuraconstruction #superraincrains and #conceptcrains for the awsome instal job

14.01.2022 Big week on the chip with the boys from trustworthy Capentry using the new redline lvl stud framing. #thelidison

10.01.2022 Detail complete thanks to @earthmoving_creations steel delivered ready for #footings next week

10.01.2022 Another #canberra home getting the #NRG Treatment!



10.01.2022 Our multi unit site in griffith using full Dulux coatings we rendered and painted the Amya development ideal group is very proud to have been involved with this project

10.01.2022 Labourer / Rederer Wanted full time position Pm for detailsLabourer / Rederer Wanted full time position Pm for details

08.01.2022 Going going .. gone , our next project is underway developed by @theidealgroup designed by @benwalkerarchitects follow our progress on the @thecollectorhaus this one is going to be epic !! @ Narrabundah

08.01.2022 #chemset 300 starter bars into footings these will lock in the bottom floor slab to the m-class site , #foundations

08.01.2022 Final brick has been selected we are using a Bowral dry pressed range brick with 12mm raked charcoal joint , should look mint

08.01.2022 Our mugga-way project making good progress its such a privilege be giving this beautiful home on one of Canberra’s most prestigious streets a big facelift , watch this space !

06.01.2022 #dincel walls are now core filled thanks to act formwork for such a professional and safe operation no blowouts and all walls straight as an arrow !!

05.01.2022 All systems go!@thecollectorhaus a cool little time Laps of the effort that goes into installing #precastconcrete a precision product needs #precison instal

05.01.2022 Ground floor #precast went in without a hitch today loving the awesome angles @benwalkerarchitects has brought into this project and a big thanks to Paul and @akuraconstruction for working through multiple revisions to achieve suck a great result , only 13 panels to go !

04.01.2022 2 days 4 men 360m2 of @dincelstructuralwalling stood and #reinforced @thecollectorhaus Monday the panels will be cut down to nominal heights and prepared for core filling ! Very impressed with the speed of this system and #site #impact being #minimal @benwalkerarchitects @ Narrabundah

03.01.2022 @thecollectorhaus in all its glory in this awsome 3D animation created by our awesome architect @benwalkerarchitects this really is going to be something

01.01.2022 Been a few Wet days just before the slab was to be prepared not great for progress but can’t say no to some good rain

Related searches