Australia Free Web Directory

In-line Carpentry and Maintenance in Sydney, Australia | Construction company



Click/Tap
to load big map

In-line Carpentry and Maintenance

Locality: Sydney, Australia

Phone: +61 404 859 735



Reviews

Add review



Tags

Click/Tap
to load big map

23.01.2022 Before and after photos of our Illawong job. Timber floating floors over existing tiles and up the stairs with a new glass balustrade changes the whole look of the place.



20.01.2022 A little extension at St Andrews we started yesterday. Front deck finished today and start with the frames on Monday.

20.01.2022 10m x 4m carport we built just before Christmas. We got back there this week and lined the ceiling ready to be painted. With the aluminium shutters on the side and gates at the front not only is it a secured area it looks fantastic and keeps at least 2 cars out of the weather.

16.01.2022 Our Kearns bathroom is coming along great. Started the demo on Monday, plumbing and electrical roughed in, bed down, primed and waterproofed and ready for the tiler to start Tuesday



15.01.2022 This is the Dapto bathroom we helped out the owner with. We installed a new window,a cavity slider, sheeted the walls and waterproofed the owner looked after the rest. The whole job came up fantastic well done Phil O'Brien

12.01.2022 What a year it has been in 2020. We have big plans for 2021 and looking forward to the many projects we have booked in already. Merry Christmas and a happy new year to all. Thank you for your ongoing support. Cooper Gould. Steve Bennett Plumbing. Mitch Prest. Leo Dekker. Wonson Bros Timber Pty Ltd

09.01.2022 Kitchen installed just in time for Christmas. Another job crossed off the list.



09.01.2022 Another job smashed out today. Removed a garage door and replaced it with a stegbar bifold aluminium door. A couple of decking boards on the outside makes it easy to access the pool area.

08.01.2022 Our bathroom Reno at Kearns came up great. We completely stripped out the bathroom to find bad water damage between the shower and hallway walls. We had to re build the walls but still had the job completed in 2 weeks. Love the timber top seat we made next to the vanity.

08.01.2022 70 metres of flooring laid over the last few days. Square nosed treads fitted to all the stairs with floating floor risers. Very time consuming finishing off the stairs but it’s been worth every minute as the result speaks for itself

04.01.2022 Our St Andrews extension and deck is coming along nicely. Frames are up and the roof is built. We have moved the front door forward and removed the existing internal walls.

03.01.2022 Helping out a mate with his ensuite reno at Dapto. A bit of frame work, a new cavity slider installed and new window then sheeted ready for waterproofing.



01.01.2022 New tool Friday. Just in time for the weekend. Cooper Gould Mitch Prest. Nathan Mesinez.

01.01.2022 Q:What else do you do when your on holidays???? A: strip out your own main bathroom!!!!!

Related searches