25.01.2022 Starting off the week with a job around the house. 60 square metres of patio and path.



24.01.2022 A patio extension we done earlier this week 25 square meters of plain and booked in for covercrete

23.01.2022 Just over 200 square meters of plain concrete, little pathway and a parking and U-Turn bay. 2 day job from start to finish including job tidy up. Booked in for covacrete all around the house including the areas we just completed.

21.01.2022 Busy day today, trades lining the street! Bricks almost done, cladding started.



20.01.2022 40 squares of shed slab including pathway outside, edge beam and height built up to to suit owner. Trowel finish in shed and broom finish on the pathway. Job completed start to finish including building it up and compacting it in the day with site clean up.

20.01.2022 Heres an update of the work completed at lukes house. This job had a bit more involved then your average and took 2 and a 1/2 days but happy with the end results

17.01.2022 22 square meter concrete pathway and clothes line area 1 day start to finish including job tidy up



16.01.2022 85 square meter driveway and path in broom finish 2 days start to finish including dirt removal and job tidy up

16.01.2022 Near completion on one of our latest jobs aloe of hand work gone into it. 5 day week of hand digging has brought us to the end of the subgrade, had to remove pavers and existing concrete slab, removed all rocks and palm tree roots that had taken over down the side of the house. Installed storm water grate and modified water tank down pipe.

16.01.2022 Update on progress - internal painting being completed, driveway and paths being prepped, bathrooms ready for tiling

16.01.2022 Todays job list was this 20 square meter patio prepped and poured in the one day and the start of a sub grade on another job pictures to come tomorrow for the other job but here is the 20 square patio

14.01.2022 Busy day today, trades lining the street! Bricks almost done, cladding started.



14.01.2022 Plumbing rough in done, electrical done, bricks finished all ready for plastering to start Monday

13.01.2022 Progress pics, bricks have started.

12.01.2022 Salt & pepper exposed patio and pathways 70 square meters. Prepped and poured in 2 days including job tidy up.

12.01.2022 The current job were on we have removed 7 palm trees from the property along with some cleaning up. Keep posted for some more photos tomorrow when we do the first pour of the job. 200 squares around the house

12.01.2022 Out latest covercrete job 600mm squares set on a 45 angle on the driveway and 1 plain colour on paths. Colour is stone mauve

09.01.2022 Covercrete job from yesterday. Colours are neutral and oatmeal, no grout lines. Pattern is 600mm diamonds.

09.01.2022 Around the house completed a lot prep work went into this job heres a few last pictures of pour day. This client has has also wanting covercrete.

07.01.2022 Kitchen cabinets are in, walls are all sheeted, external paint all done, internal stairs in, internal paint underway!

07.01.2022 Some updated progress pictures. Garage doors are going in, painting almost complete, exterior concreting done, electrical fit off being done.

07.01.2022 Our latest job completed. 200 squares of plain concrete around the house. 7 palm trees cut down and removed. Took us 5 days from start to finish including job tidy up.

06.01.2022 Latest project, set of 5 townhouses. Construction has just started, slabs are down ready to build!

05.01.2022 A block retaining wall that we have done the steel work on and doing the pour early next week

04.01.2022 Frames and trusses done, ready for roofing

04.01.2022 Lower frames are done, ready for flooring next week

03.01.2022 Some of the prep work gone into the current job were doing keep posted for the finished product...

02.01.2022 55m of pathway at 600 wide all off the house for gardens to go in. Job completed start to finish including tidying up the job in 2 days. Booked in to covacrete it along with the drive way we done for the owners.

01.01.2022 45 square meters of concrete and pavers removed from around the pool no damage to pool or pipes. Ground built up as requested from owner and area pushed out to 70 square meters. Pouring the job Monday so more pictures to come.