Australia Free Web Directory

I’ve got it sorted in Dromana, Victoria, Australia | Home improvement



Click/Tap
to load big map

I’ve got it sorted

Locality: Dromana, Victoria, Australia

Phone: +61 439 204 235



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 When I mentioned, I’ve hit the ground running on this reno I wasn’t joking, 9days in and it’ll be 99% completed tomorrow evening. Tomorrow’s check list includes, skirts/arks, installation of frameless glass shower screen, complete cabinet install, fit a man hole as there isn’t one, caulking and plumbing fit off, fingers crossed my plasterer can make it Saturday to base and top



24.01.2022 Cranbourne job is coming together quite nicely, floors tiled and grouted, cabinet carcasses and bench tops installed in the laundry, just waiting on the vinyl wrap doors and panels, there delayed due to corona, laundry splashback tiled, back there tomorrow afternoon to tile skirt and finish installing the powder room cabinet

23.01.2022 Hi all, unfortunately for me I’m classed as non essential so the stage 4 covid restrictions have shut me down for 6weeks, on the bright side it will be nice to spend some time with my family, and finish off a few odd jobs around the house,

23.01.2022 Seaford reno completed, apart from 2 mirrors and plaster sanding, (I’ll have them Monday) its come along way in just 11days, it was a full gut job as water had penetrated the walls, rotten studs and mould covered plaster, cavity slider installed toilet wall removed to open up the floor plan, custom built cabinets built and installed, we were planning on a walk in shower but the plumbing wouldn’t allow for it so we opted for a low lying shower base and frameless glass shower screen, it’s great to be back at doing what I love also a big thanks to my other trades, plumbing, electrical and plasterer, I couldn’t do it without you guys being on site when I need you



23.01.2022 It’s been a massive 4 days at carrum downs, after peeling back the layers it made more sense to strip it all back to bare frame and start over, rotten plaster and flooring removed, new flooring, walk-in shower tray, bath hob, new ceiling, aquachek plaster on the walls, (2 sheets were faded from the sun) electrical and plumbing rough in completed, plaster base and top completed this evening, back there tomorrow morning to get the first coat of waterproofer on

22.01.2022 Floor tiles and walk in shower done at the mount Eliza job this morning, cold weather yet again is my kryptonite took an extra day for the waterproofer to fully dry, back on deck Saturday to hang the vanity and start the wall tilling

17.01.2022 Skirting on at Frankston south this morning, and black grout done yesterday, what a difference



16.01.2022 First coat on at Dromana this morning, fingers crossed it’s dry this arvo for a second coat

16.01.2022 Mount Eliza job is in full swing, electrical rough in completed, plumbing rough in completed, floor for walk in shower, bath hob, niche and recessed shaving cabinet framed out, drop in shower base installed, tile underlay installed, acoustic insulation put in on external walls and adjoining bedroom wall to help with sound deadening, back there on Monday to hang the plaster and get a coat of waterproofer on

15.01.2022 Cranbourne laundry and powder room started on Friday, demo done, plumbing rough in done plaster back on based and topped, back there Monday to start waterproofing

15.01.2022 Walls tiled and vanity installed in Pearcedale today, skirt tile and grout tomorrow, no niche in this one as there’s hand/grab rails being installed

14.01.2022 A small ensuite I completed in lockdown for my in-laws (cost price just to give me something to do, and to keep me sane) the house was vacant as they were at there holiday house when the lockdown came into affect, unfortunately I didn’t take many before pics, I removed a nib wall and opened up the shower alcove from a 900x900 base to a 900x1200 walk in, old swing door taken out and replaced with a cavity slider to maximize floor space, recessed shaving cabinet made and installed, I modified the existing vanity I had previously made and installed a few years ago to suit, just waiting on a mirror for the shaving cabinet and it’ll be complete



14.01.2022 Blairgowrie job is coming along nicely, just the laundry floor, niche and window returns to go, then grout and caulk

14.01.2022 Blairgowrie job is well underway, 3 screeds, 2 bathrooms 1 ensuite and a laundry waterproofed, with the cold weather it’s been a waiting game on drying times but fingers crossed I can start tilling tomorrow

12.01.2022 Got a call back to the Blairgowrie job for shower screens, was nice to get out and do some work, house is a new build and empty, I followed all stage 4 lockdown rules

10.01.2022 Carrum downs job started today, looks can be very deceiving, it’s definitely up there as one of the worst I’ve pulled out 4 different layers on the floor, including pine lining! and an extremely bad job of waterproofing has left a lot of water leaking everywhere, gone from a quick job to a full gut job, more pics to come later in the week when I get it all put back together

09.01.2022 Mount Eliza job started on Monday, I forgot to take before pics there was a claw foot bath with shower over the top, a pedestal basin, and a toilet, the existing configuration is being reworked, new bath, separate walk in shower, and a double vanity with recessed shaving cabinet above. 2 days of hard work removing the existing wall and floor tiles, it was built to last, plumbing rough in was started this afternoon electrical rough in tomorrow morning, this reno is going to look great and be more functional for a growing family

09.01.2022 Quick link to one of my great clients doing it a little tough with no live gigs, it’s a good listen and a great night in https://www.facebook.com/cambrownacoustic/videos/2405005759808019/

09.01.2022 Second coat of waterproofer completed on the seaford job this morning, unfortunately my plasterer got stuck on a job today and couldn’t make it, I’ll be back at it in the morning to remove the hallway tiles, and catch up with Alfie for the electrical fit off

08.01.2022 Heaps of progress at the rosebud job in the last few days, waterproofed, floors tiled, and 3 walls tiled today, back there in the morning

08.01.2022 Pearcedale job is looking great, with some extremely happy customers, shower over bath was removed to make life easier for my elderly customers, a massive 1700x900 walk-in shower, new grab rails (they wanted to keep the old rail but it was worn so I installed new ones for no extra charge, my ocd wouldn’t let me put the old one back in haha!!) new vanity fittings and fixtures all supplied included in the total cost, time to get back to the rosebud job

08.01.2022 Dromana shower recess started today, the existing tiles were stuck on with liquid nails, demo completed, new spindles installed, primed ready to first coat waterproofing tomorrow morning

06.01.2022 Another big day at mount Eliza, bath mudded in, plaster on and first coat of waterproofer on, it’s nice and warm in the house so fingers crossed it’ll be dry for second coat in the morning

05.01.2022 Mornington job started on Tuesday, this ensuite was still in good condition, just a bit tired, demo completed, non load baring nib wall removed (truss roof) floor cut, lowered and strengthened for walk in shower, plumbing and electrical rough in completed, all opened up external walls insulated, new aquachek plaster hung, floor patched, tile underlay glued and nailed off, shower base screeded, should be back on site Sunday to first coat water proof, providing the screed is dry, good to be back

05.01.2022 Mount Eliza completed! One very happy family, that bath hob was very time consuming but I think it turned out great, fingers crossed off to the next one Monday if there are no further COVID restricions

03.01.2022 Mount Eliza job is 90% completed, electrical fit off completed, plumbing fit off completed, frameless shower screen installed, fittings and fixtures installed, we ran out of feature tiles for the bath hob, grouting them tomorrow, and finishing the caulking on Sunday

03.01.2022 A quick laundry and entry tiling job in Frankston south, diamond checker pattern, tiles under tiles in the laundry and parquetry flooring under the entry tiles was a lot of fun to rip up back on site tomorrow to grout and install new skirting, once the painting is done I’ll head back to caulk

03.01.2022 A few progress pics from Blairgowrie, it’s finally starting to take shape

03.01.2022 Laundry floor tiled at Blairgowrie this arvo, niche and window returns tomorrow #levolution

02.01.2022 Busy few days at Mount Eliza, walls and niche tiled, will be tilling the bath hob tomorrow morning, grouting Thursday, cleaning caulking and shower screen Friday

02.01.2022 Water proofing completed and floor tiles at Pearcedale, onto the walls tomorrow

01.01.2022 Got the floor tiled, cabinets made and delivered today for the seaford job, I had to leave a couple of tiles out so my client can access the bedroom, cabinets will be installed tomorrow morning and I’ll be tiling the shower alcove

01.01.2022 Cranbourne job is completed, just waiting on a the washing basket drawer system(on back order) and the vanity doors (unfortunately they were damaged in transit) Cam from #oneofakindcabinets with fit them when they arrive

Related searches